List of Civil Engineering products
- classification:Civil Engineering
91~135 item / All 7991 items
You won't have time to evacuate from the earthquake to the tsunami's arrival! This is a "tsunami shelter" that dramatically increases survival rates against the tsunami approaching at a tremendous spe...
- Basement unit/disaster prevention shelter
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
We held a site tour.
At the site of the "R6 Komatsu Yobama Construction," we held a site tour for four days starting from November 24. Visitors were able to observe the automation and remote operation of construction machinery. The event was also featured in the Construction Industry Newspaper and the Construction Communication Newspaper.
Upright waterproof protective material "Paraboard"
- Waterproofing work
- Others/Roofing materials (shingles, cement, steel sheets, aluminum)
- Reinforced concrete construction
Centralized management of wave height predictions and observations in the cloud.
- Harbor Construction
- Weather Survey
- Airport facilities
The NETIS number for 【Compass PLUS】 has changed to "QSK-210001-VE".
Thank you very much for using our services. The registration number for 【Compass PLUS】, which was registered in the Ministry of Land, Infrastructure, Transport and Tourism's new technology information provision system NETIS in 2021, has changed to QSK-210001-VE. We will continue to strive to provide information that satisfies everyone, so please make use of Compass PLUS! ≪Ministry of Land, Infrastructure, Transport and Tourism NETIS (New Technology Provision System)≫ https://www.netis.mlit.go.jp/NETIS
Utilize observation data as evidence for establishing unique construction standards and for work stoppages due to inclement weather!
- Weather Survey
- Coastal construction
[Feature Introduction] Digital Jellyfish Observation Data Output Function
We would like to introduce the convenient features of the small wave height observation device, Digi-Jellyfish, NETIS registration number QSK-170002-VE. It can be utilized not only for safety measures but also for creative ideas and technical proposals. The Digi-Jellyfish is a compact, lightweight, and low-cost device that enables high-precision observations of wave heights. The observed data can be checked in real-time on the Compass PLUS website. The data collected by the Digi-Jellyfish is stored on a server, allowing for the output of past observation data in PDF and CSV formats. 【Operating Environment】 - The point most affected by waves and swells within the construction area - Trial construction with a risk assessment for severe weather *For more details, please visit our website or feel free to contact us.
I would like to explain the overview of "weather risk settlement type construction" in a way that is as easy to understand as possible for those who are not very familiar with it.
- Harbor Construction
[Weather Useful Information] What is "Weather Risk Settlement Type Trial Construction"?
Thank you for always watching. This time, I would like to pick up on one of the new trends being promoted by the government regarding marine construction: "Weather Risk Settlement Type Construction." I would like to explain the overview of "Weather Risk Settlement Type Construction" in as easy-to-understand terms as possible for those who are not very familiar with it. *It is recommended to read this after viewing the previous article, "What is the 'Utilization Coefficient' Used in Port Construction?" The content organized by our company is based on information as of October 2024. For details, please refer to the website of the Ministry of Land, Infrastructure, Transport and Tourism. Table of Contents 1. What is "Weather Risk Settlement Type Construction"? 2. The Concept of Weather Risk Settlement Type Construction 3. Conclusion ■ 1. What is "Weather Risk Settlement Type Trial Construction"? "Weather Risk Settlement Type Trial Construction" is one of the measures promoted by the Ministry of Land, Infrastructure, Transport and Tourism to advance work style reform in ports. *For more details, please visit our website or feel free to contact us.
Easily obtain real-time wave heights on-site! [NETIS registration number QSK-170002-VE]
- Harbor Construction
- Coastal construction
- Weather Survey
Three-Month Forecast Announcement: Winter-like cold has arrived, be cautious of the westward cold air.
The Japan Meteorological Agency announced a three-month forecast from December to February on Tuesday, November 25. During this period, the upper-level westerly winds will meander southward near Japan, but will generally flow in the same position as the average year. For more details, please visit our website.
The "Natural Disaster Prevention System ZEROSAI" can operate using solar power and Starlink.
- Erosion control works
- Dam construction
Utilizing weather forecast data as materials in meetings also contributes to the skill retention of less experienced staff.
- Road construction
- Weather Survey
- Reinforced concrete construction
[ZEROSAI Introduction Interview] Kumamoto Prefecture, Ogata Construction Co., Ltd. Utilizes weather forecast data as materials in meetings, contributing to the skill retention of less experienced staff.
Issues - It is a bridge substructure site, and multiple concrete placements must be completed reliably; otherwise, we cannot proceed to the next phase. - There are many work processes that are easily affected by weather, such as measures for hot weather concrete placement, and we must coordinate well with partner companies. Key Points for Introduction - Provides weather information tailored to the site in just the necessary amounts, with less unnecessary information compared to other companies, making it user-friendly. - By simply printing the forecast data, it can be immediately utilized as meeting materials and construction documents, leading to improved operational efficiency. *For more details, please refer to the PDF document or feel free to contact us.
Creating a better social space. Hirose always proposes the best proposals.
- Earthworks
- Pile and foundation work
We will contribute to the supply of safe and high-quality residential land.
- Retaining wall
The EP root pile method, which firmly establishes roots in the earth, realizes public works that harmonize with people and nature.
- Earthworks
- Pile and foundation work
Surpassing the conventional rebar insertion methods! The definitive technique for slope stability reinforcement.
- Earthworks
- Piles, caissons, sheet piles
- Pile and foundation work
Leave it to us for high-durability micropile construction methods.
- Earthworks
- Piles, caissons, sheet piles
- Pile and foundation work
We aim to achieve harmony with nature, landscapes, and local communities, striving for a more comfortable amenity experience.
- Aggregates and crushed stone
- Dam construction
- Retaining wall
Resolving Common "Unexpected" Cases Before and After Construction Orders - Ground Improvement and Structural Reinforcement Edition -
- Ground improvement
- Reinforced earth wall
How are you handling the "access roads" at renewable energy construction sites? We are offering a free collection of case studies summarizing the real challenges and solutions at renewable energy cons...
- Other civil engineering works
Introducing the performance requirements, analysis methods, analysis results, and software used for each case!
- Site and ground investigation
The use of hardening expansive injection material and Dagsim pipes demonstrates the EP effect!
- Earth retaining wall/foundation reinforcement
A construction method that pursues reduced total construction costs and aesthetic appeal: Spar-Tail Arm Method.
- Earthworks
- Pile and foundation work
Harmony with nature, tranquility. Now, Hirose reflects anew.
- Reinforcement and repair materials
- Earthworks
Connect quickly. Connect to the future. The era is all precast.
- Dam construction
- Airport facilities
- Special Construction Method
Economical plans suitable for the site are possible! Panel-assembled large blocks with high adaptability for disaster recovery.
- Aggregates and crushed stone
- Dam construction
- Retaining wall
Ground treatment and temporary construction work are simplified, resulting in a shortened overall construction period! Reduced total construction costs after completion.
- Road construction
Examples and countermeasures in close proximity construction - Solving issues in analysis work -
- Other earthworks, foundation works, and exterior floors
Demonstrating the impact resistance of wall panels (14cm thick) at the actual construction site!
- River construction
By appropriately combining high-intensity ground reinforcement soil work with high-rigidity steel pipe piles, significant shortening of construction time has been achieved!
- Earth retaining wall/foundation reinforcement
High greening rate, excellent turf growth, capable of accommodating heavy vehicles.
- Paving of sidewalks, roads, parking lots and stadiums
The charm of earth-based paving lies in its gentle texture unique to natural materials. It offers ease of construction, maintenance, and low cost, opening up new possibilities.
- Paving of sidewalks, roads, parking lots and stadiums
The vibrant colors of the tiles and the spray that rises create a new landscape.
- Paving of sidewalks, roads, parking lots and stadiums
It can also be used for vertical joints! This is a rubber joint that is compatible with wide spaces.
- Paving of sidewalks, roads, parking lots and stadiums
The gentle texture, workability, and maintenance properties of natural Ryukyu limestone.
- Paving of sidewalks, roads, parking lots and stadiums
Recommended for asbestos removal work/building demolition work!
- Safety and consumables
- Dismantling and moving
- Medicines
In addition to maintenance specifications, it is installed for transporting equipment! It has been adopted for dam renovation work and underground stairs. *Video available.
- Other earthworks, foundation works, and exterior floors
Mega solar construction on slopes and slope renovation work are in full swing! Slope lift [Installation case videos now available].
The aluminum single rail hoisting machine boasts the strongest strength and has been adopted for rental use since 2013. It is active as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega solar installation sites and civil engineering construction sites. It allows for safe work with a focus on improving work efficiency, reducing costs, and ensuring compliance. It can also be used for slope work beside tracks, stair renovation work, dam renovation work, and highway slope work. The rail length can be customized up to a maximum of 95 meters to suit the site. With a 1000W winch, it achieves high-speed lifting at 30 to 35 meters per minute. *It has also been used for the stone wall renovation work at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!* *Videos of installation examples are currently available through the related links below! Please take a look.*
Great for slope construction and slope renovation work! Capable of lifting up to approximately 95 meters, achieving a high-speed lift of 30 to 35 meters per minute!
- Other earthworks, foundation works, and exterior floors
- Transportation System
- Roof and gutter construction
Mega solar construction on slopes and slope renovation work are in full swing! Slope lift [Installation case videos now available].
The aluminum single rail hoisting machine boasts the strongest strength and has been adopted for rental use since 2013. It is active as a temporary lift for slope construction on mountain slopes and stairs, as well as at mega solar installation sites and civil engineering construction sites. It allows for safe work with a focus on improving work efficiency, reducing costs, and ensuring compliance. It can also be used for slope work beside tracks, stair renovation work, dam renovation work, and highway slope work. The rail length can be customized up to a maximum of 95 meters to suit the site. With a 1000W winch, it achieves high-speed lifting at 30 to 35 meters per minute. *It has also been used for the stone wall renovation work at Takeda Castle Ruins and Azuchi Castle Ruins, with installation examples available in the catalog!* *Videos of installation examples are currently available through the related links below! Please take a look.*
Reduce industrial waste! Achieve a sustainable infrastructure maintenance cycle.
- Bridge Construction
★New Catalog★ Circulating Hybrid Blast System ~An environmentally friendly construction method~
The "Circulating Hybrid Blast System Method" is an environmentally friendly technique that significantly reduces industrial waste and CO2 emissions by circulating and repeatedly projecting abrasive materials. Additionally, by using steel grit as the abrasive material, it efficiently removes coatings that contain harmful substances such as lead, PCBs, and chromium. The catalog has been completed, so please take a look.
More 'ease' on site. Meiwa Kogyo's agricultural air valves improve clogging issues and eliminate troubles, reducing the burden of work.
- Water and sewerage pipe fittings
- Agricultural civil engineering works
Overcoming underground conditions to achieve ideal external waterproofing! Low-cost construction method for reducing construction time and costs.
- Coating film waterproofing material/permeable waterproofing material
- Waterproofing work
- Earth retaining wall/foundation reinforcement
The key to the waterproofing and corrosion-resistant lining material for water supply facilities is the polyurethane resin, which excels in waterproofing properties.
- Coating film waterproofing material/permeable waterproofing material
- Waterproofing work
- Water Supply Facilities
Spraying two-component polyurethane resin with a special machine, forming a film in just a few seconds with ultra-fast curing.
- Coating film waterproofing material/permeable waterproofing material
- Waterproofing work
- Other civil engineering works
This is a temporary sign for road construction. It uses prism high-brightness reflection, so it has excellent visibility even in a slim design.
- Road construction
- Tunnel construction
- Signs, banners, lanterns, and curtains
[Sales/Lease] The lightweight square support column is a unit-type support structure with a permissible load of 20 tons. It is a highly versatile support structure that allows for free height adjustme...
- Scaffolding and Support Materials
- Dismantling and moving
- Earth retaining support
Central Built Temporary Exhibition Hall Diary Vol. 004
Hello, Built! This is Tamura from Chuo Built Industry (^_-)-☆ We had a visit from Company A, which is also a temporary equipment manufacturer and involved in leasing, just like us. Since there were more than 10 people, we divided the tour into a morning session and an afternoon session. The exhibition manager, Mr. Oki, was even more enthusiastic than usual! Unfortunately, it rained that day. At times, it poured heavily in both the morning and afternoon, so we mingled and waited for the rain to lighten before heading outside. We made sure to introduce not only our site but also our recently started YouTube channel! ------------------------------------------------ For more details, please click on the link below: "Related Links - Chuo Built's Temporary Exhibition Diary Vol.004".
A new constant water valve specifically for a 50mm diameter has been introduced for steel pipes! With the insertion of a soft seal valve body, it can achieve a water stop with just hand tightening, al...
- Railway Construction
- Pipeline Construction
Creating tomorrow's 'green'
- Tree protection materials and plant boxes
- Trees
- Earthworks
Full-fledged local-type mat corresponding to the Invasive Alien Species Act.
- Tree protection materials and plant boxes
- Earthworks
- Pile and foundation work