Ground reinforcement using the Tiger Pile method for detached houses | Geotech
Ground reinforcement work
We achieve shorter construction periods and cost reductions for single-family homes through improved support strength and construction efficiency.
In the construction of detached houses, shortening the construction period and controlling costs for ground improvement work are crucial issues that affect business profitability. If appropriate methods are not chosen for weak ground, it can lead to risks of uneven settlement, excessive construction, and large amounts of soil disposal, which can strain the budget. The Tiger Pile method is a hybrid technology that uses high-strength stepped steel pipes as core materials in soil cement columns. By increasing the vertical bearing capacity per improved body, it shortens the construction length, enabling optimization of the construction period and costs. 【Usage Scenarios】 - Foundation work for detached houses on weak ground - Residential construction projects requiring shortened construction periods - Sites aiming to reduce construction waste generation 【Benefits of Implementation】 - Significant reduction in construction length leading to shortened construction periods - Reduction in disposal and transportation costs due to decreased soil waste generation - Budget control through reduced number of pouring locations
Inquire About This Product
basic information
【Features】 - High load-bearing capacity achieved through the fusion of soil cement and stepped steel pipes - High reliability based on GBR performance certification (No. 06-12 Rev. 4) - Efficient and rational component configuration according to required load-bearing capacity - Design flexibility suitable for buildings up to three stories above ground 【Our Strengths】 GeoTech Co., Ltd. provides a one-stop service from ground investigation to reinforcement design and construction. With real-time monitoring using the latest construction management equipment and a nationwide construction network, we offer ground reinforcement services that combine short construction periods, low costs, and high reliability, strongly supporting our customers' business plans.
Price information
Delivery Time
Applications/Examples of results
It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.
catalog(4)
Download All Catalogs
Company information
-







