List of Construction, work and methods products

  • classification:Construction, work and methods

136~180 item / All 27314 items

Displayed results

Easily connect pipes with different outer diameters! A fitting suitable for emergency repairs of buried pipes.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Maruei Concrete Industry will exhibit at the Construction Technology Fair 2025 in Chubu with the theme of "Precast Products Contributing to National Resilience."

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

By systematizing the construction management device, we will ensure the reliable execution of expanded shapes and hole bottom treatment!

  • Ground foundation construction method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low cost, high quality: We create earthquake-resistant foundations for safe and secure urban development!

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Just cover the rebar cage of the pile with a net! We accommodate various challenges and a wide range of construction methods.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

It is a construction method that achieves no spoil, low noise, and low vibration, with excellent economic efficiency and consideration for the environment.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

工事不要で即導入!!3キャリア対応の直通発信デバイス。リモート管理で安心運用を実現!

  • Image (8).jpg
  • Image (2) (1).jpg
  • CCE1F047-C547-4790-8221-4DC762D93A35.JPG
  • 避難所.png
  • トライアル無人店舗.jpg
  • Kiosk terminal
  • Parking lot facility construction
  • Monitoring and Control Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Over 90 construction achievements! We support bridge pier reinforcement nationwide with "shortened construction periods and expanded application scope"!

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Catalog Renewal] Tentative Deadline LPF Method Construction Achievements / Japan Ocean Services Co., Ltd.

The "Temporary Closure LPF Method" is a construction method that builds temporary closures for underwater structures such as rivers, seas, and dams using liner plates. The Temporary Closure LPF Method contributes to shortening construction periods and securing holidays as follows: - Reduces the production of custom components for each pier. - Selects the optimal shape based on site conditions. It can be implemented using manual labor alone and is feasible in environments with a headroom restriction of approximately 1.0 meters or less. *Please refer to the case study collection that includes examples of the construction achievements of the "Temporary Closure LPF Method." 【Features】 ■ Composed of liner plates, H-beams (reinforcement rings), and supports. ■ Assembled in a cylindrical shape above the water surface and installed underwater. ■ Construction is possible with a headroom restriction of approximately 1.0 meters! *Achievement at 1.2 meters. ■ Vibration-free construction is possible in narrow areas!

This is a proposal for the utilization of the disaster prevention system ZEROSAI. Gradual water level alerts and understanding upstream weather information in conjunction with the site.

  • River construction
  • Weather Survey

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Utilize observation data as evidence for establishing unique construction standards and for work stoppages due to inclement weather!

  • Weather Survey
  • Coastal construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
messageImage_1730952910808.jpg

[Feature Introduction] Digital Jellyfish Observation Data Output Function

We would like to introduce the convenient features of the small wave height observation device, Digi-Jellyfish, NETIS registration number QSK-170002-VE. It can be utilized not only for safety measures but also for creative ideas and technical proposals. The Digi-Jellyfish is a compact, lightweight, and low-cost device that enables high-precision observations of wave heights. The observed data can be checked in real-time on the Compass PLUS website. The data collected by the Digi-Jellyfish is stored on a server, allowing for the output of past observation data in PDF and CSV formats. 【Operating Environment】 - The point most affected by waves and swells within the construction area - Trial construction with a risk assessment for severe weather *For more details, please visit our website or feel free to contact us.

【2024/10/07 Acquired VE Evaluation】A specialized weather service that can be used for heavy rain measures, strong wind measures, worker safety, and project management.

  • River construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
NETIS_VE.png

"Point Weather Forecast" KIYOMASA PRO has obtained "VE Evaluation"!

The weather risk management mobile "KIYOMASA PRO" has received the highest rank VE evaluation (proven effective technology) in NETIS (New Technology Information System of the Ministry of Land, Infrastructure, Transport and Tourism). NETIS Number: KT-230016-VE Technology Name: Weather Risk Management Mobile "KIYOMASA PRO" ◆ Benefits of VE Evaluation 1. Additional points for technical proposals and creativity in construction performance evaluation It is expected that evaluation points will improve during technical proposal submissions for bidding and at the completion of construction (construction performance evaluation). This increases competitiveness compared to using other weather information services, and further recognition from clients and contractors is anticipated. 2. Simplification of procedures Typically, the creation and submission of the "Effectiveness Survey Form," which is required within 30 days after construction completion, will not be necessary, simplifying post-construction procedures. 3. Long-term availability The VE evaluation obtained this time is scheduled to be published for 10 years starting from the year following the initial registration (2024). It can be used over a long period, providing peace of mind. Above all, it is recognized as a superior technology compared to conventional methods, offering tremendous effectiveness as a weather risk management tool to protect sites and workers from localized heavy rain, lightning, and gusts.

It can be used to address surrounding environmental measures and reduce watering costs!

  • Dismantling and moving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filter

classification
Delivery Time
Location