Construction method Product List and Ranking from 26 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. Off-site construction method for air conditioning equipment "Vispaire Frame"
  2. Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"
  3. Rigid urethane coating waterproofing HU-B method 化研マテリアル
  4. 4 Unrestricted Foundation Roller Method 'Cerami RC-FR Method' エスケー化研
  5. 5 Special foundation roller painting method for interior and exterior finishes "Fine FR Method" エスケー化研

Construction method Product List

2356~2370 item / All 2459 items

Displayed results

ECO Conbi Method [Side Ditch Repair Method Available for Immediate Opening]

Low cost & easy construction! This is an economical ditch repair method registered with NETIS!

The "ECO Nbi Method" is a trench repair method that allows for repairs by replacing only the deteriorated covers with ECO Nbi covers, without damaging the main body of the trench. By securing the primary cover with filling material, it is possible to repair any damaged parts of the trench body simultaneously, allowing for same-day reopening. Additionally, while the primary cover is fixed, the lightweight secondary cover is removable, making maintenance easy even after construction. The construction process does not require chiseling or cutting of the trench body and can be done manually. 【Features】 - Existing trench cover support areas can be utilized as is, even if damaged. - Small-scale construction is possible without heavy machinery, resulting in overall lower costs! - Manual construction is feasible, allowing for speedy execution. - The cover support area is reborn-shaped (curved), significantly reducing noise and vibration! - Utilizing existing trenches minimizes the generation of industrial waste such as concrete debris. - No modifications are made to the existing trench body. - The covers are lightweight and easy to remove, enhancing maintainability. - The absence of unevenness ensures a barrier-free environment, safe for wheelchairs and other mobility aids. 【NETIS Registration Number: HR-120004-A】 *For more details, please download the catalog and contact us.

  • Gutters and U-shaped gutters
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NK rust stabilization anti-rust method

Cost reduction is possible compared to conventional methods! For the maintenance and repair of bridges and steel structures.

The "NK Rust Stabilization Anti-Rust Method" involves surface preparation using three types of grinding, stabilizing any rust that cannot be removed with a solvent-free epoxy resin-based rust stabilization paint "NK100-E," and protecting it with an inorganic paint "Seal Coat 007M" that excels in electrical insulation and weather resistance. This is a durable repainting method. It contributes to the maintenance and repair of bridges and steel structures where blasting is difficult, enhancing long-term durability. It is also suitable for repainting coatings that contain harmful substances, lead and lead compounds, chromium and chromium compounds, and PCBs. 【Features】 ■ Reduces noise, dust, and industrial waste generated during surface preparation ■ The coating system uses safe materials that do not contain harmful heavy metals ■ NK-100E is solvent-free, so it does not damage the active film ■ High gas barrier properties inhibit the intrusion of rust-inducing factors such as water and oxygen *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Modified asphalt cold-layer construction method *Obtained construction technology review certification!

[Attention Contractors] Waterproofing method that can be applied at room temperature without using open flames!

"Chemias Roof Waterproofing" is a safe and environmentally friendly modified asphalt cold-layer method. Since it can be applied at room temperature, it effectively resolves issues related to heat, smoke, odors, and the dangers associated with equipment and construction that occurred during hot asphalt application. Notably, the exposed insulation method has received the "Flame Spread Certification" from the Minister of Land, Infrastructure, Transport and Tourism, allowing it to be applied to roofs under Article 63 and Article 22 of the Building Standards Act. **Features** - It has waterproofing performance equivalent to that of asphalt waterproofing. - It is a waterproof layer that can be applied at room temperature without using open flames. - Since no open flames are used, it does not consume fuel and can reduce the impact on air pollution. *For more details, please download the catalog or contact us.*

  • Waterproofing work
  • Roof and gutter construction
  • Heat insulation and heat shielding methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New sports direct floor construction method "Texcel Floor Method (Resin Honeycomb Floor)"

Direct floor construction method, uniform floor performance, optimal for renovations, quiet, reduced construction work, customization, reduced burden on feet.

Revolutionary Direct Floor New Construction Method Newly developed structure based on resin honeycomb panels "Texcel" By eliminating the need for an underfloor space, the number of components and construction time can be significantly reduced, achieving simplified construction and shorter construction periods. With adjustments to the functionality of "Texcel," the elastic layer, and the choice of floor finishing materials, it is possible to customize hardness and shock absorption. **Features** ■ Overwhelming reduction in construction work with ultra-lightweight honeycomb panels ■ Uniform rebound force with no variation depending on where it is stepped on ■ Customizable elasticity to suit various applications, reducing strain on the feet ■ Maintains elasticity even with additional flooring, making it an ideal recovery material for flooring renovations ■ High load capacity, capable of supporting 10-ton vehicles (flooring type) ■ Made from recycled materials, environmentally friendly product ■ Excellent thermal insulation, alleviating cold floors ■ Reduction of indoor noise **Texcel Floor Overlay Construction Method** A new method for renovating and maintaining gymnasium floors **Features** ■ The honeycomb panel and elastic layer allow for the recreation of the athletic performance and safety of new construction ■ Thin layer thickness allows for easy elimination of height differences ■ Inspection and ventilation openings can be utilized as is *For more details, please refer to the related links or feel free to contact us.*

  • Other flooring materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "ASOFR"

Since the reinforcement framework will be entirely made of steel, modular construction is possible! High efficiency in construction has been achieved.

The ASOFR method is a seismic reinforcement technique that uses steel horizontal braces to connect a reinforcing frame to an existing building, resulting in an all-steel external frame. Seismic reinforcement using external reinforcing frames is composed entirely of steel frame members, achieving lightweight reinforcement components and improving the efficiency of seismic reinforcement work. Since the reinforcing frame is entirely made of steel, modular construction is possible, and the reinforcing frame is lightweight and compact, eliminating the need for new pile foundations. 【Features】 ■ Reduction of pile work, earthwork, and foundation structure work ■ Reduction of the main construction types for the frame ■ High efficiency in construction due to the modularization of the reinforcing frame ■ Omission of the preliminary removal of existing handrails and the restoration work of new handrails ■ Significant reduction of impact on the surrounding environment during seismic reinforcement work *For more details, please refer to the related links or feel free to contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cost reduction: Ground improvement method with a shorter design length than conventional method support piles.

The design length is shorter than that of conventional solid piles! Compared to other methods, it may also reduce the overall construction cost.

The Eco-GEO method is a replacement method rather than a support pile method. The weight supported by the "crushed stone reinforcement body" is distributed underground, so it does not require a solid foundation at the tip, and in many cases, the design length is shorter than that of conventional solid piles. Therefore, depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods. 【Features】 ■ Supports the weight of the building with both the "crushed stone reinforcement body" and the "original ground" ■ Does not require a solid foundation at the tip ■ In many cases, the design length is shorter than that of conventional solid piles ■ Depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement method that can reduce the burden on site managers and contribute to shortening construction periods.

Quality control is completed simultaneously with the completion of construction! There is no need to wait for the confirmation of the strength of the test pieces.

We would like to introduce our residential crushed stone ground improvement work, "Eco Geo Method." Since there is no need for a curing period, construction time can be shortened. No water is used during the construction. As the material is crushed stone, there is no need for level management of the pile heads. Additionally, there is no concern about damaging the pile heads during foundation excavation. 【Features】 ■ No curing period required ■ Can be constructed without water ■ No post-testing (test pieces) required ■ No level management of pile heads needed *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco-GEO Method <Crushed Stone Ground Improvement>

Environmental technology for a sustainable society! For support reinforcement, liquefaction countermeasures, and drainage measures.

The "Eco-GEO Method" we employ is a ground improvement technology that allows for stable quality crushed stone ground improvement work even in narrow sites. By using the "EG Casing," we prevent the collapse of the borehole walls, and through the crushed stone compaction method, we ensure stable quality without relying on the operator's skill, enabling quick construction with simple operations. Additionally, we offer two types: the "Dewatering Type," which discharges excavated soil, and the "No Dewatering Type," which does not produce any excavated soil. 【Features】 ■ No waste is generated ■ Since no artificial materials are left underground, it is less likely to decrease the land's asset value ■ Strength does not deteriorate ■ Liquefaction countermeasures during earthquakes ■ Two types available: dewatering and no dewatering *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion coating and sheet lining method D type, Zicboard GR method.

Reduction of life cycle costs with a durability of 50 years.

▼Overview The Zick Board GR method has a construction track record of over 20 years, and based on follow-up survey results of operational facilities and promotion test results, it has been verified that even 50 years after completion, it can maintain the performance of "adhesion stability," "sulfuric acid resistance," and "barrier properties," ensuring a service life of 50 years. By having a service life of 50 years, it enables a reduction in lifecycle costs compared to coating-type lining methods and other sheet lining methods. ▼Features - The joints of the Zick Board GR method have a triple structure consisting of FRP molded products on the surface and back, along with corrosion-resistant sealing materials, providing excellent durability functions that prevent damage to the joint area due to stress concentration and other factors. - The Zick grout injected into the back of the Zick Board can also serve as a cross-section restoration process after the removal of deteriorated areas during renovation work.

  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-supporting manhole rehabilitation method Jickboard J method

A new manhole inside an existing manhole.

The Jickboard J method is a self-supporting manhole rehabilitation technique that provides performance equivalent to that of newly constructed manholes, using only rehabilitation materials for existing manholes that cannot be expected to withstand corrosion or aging. It is a unique method that combines Jickboard, Jick grout, and Jick grid into a single rehabilitation material, offering load-bearing and seismic performance comparable to newly constructed manholes. ▼Features - It can be adapted to facilities under very harsh conditions or those requiring long-term durability. - Jickboard is a factory-molded product with a homogeneous, high-density corrosion-resistant coating that has excellent barrier properties, eliminating the risk of permeation by corrosive substances. - The joints have a double structure of molded products and corrosion-resistant seals, providing excellent durability features that prevent damage to the joint areas due to stress concentration and other factors.

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Composite manhole corrosion protection method (Type D) Jickboard M method

Rehabilitation is possible regardless of the shape of the manhole (circular or rectangular).

The Zickboard M method is a construction technique that combines the performance required for manhole rehabilitation and corrosion prevention. The Zickboard is installed with a gap on the inner surface of the existing manhole, and Zick grout is filled into this gap. This allows the three-dimensional cross on the back of the Zickboard and the Zick grout to interlock firmly, integrating the Zickboard with the existing manhole to withstand external forces. ▼Features - It can be adapted to facilities in extremely harsh environments or those requiring long-term durability. - The Zickboard is a factory-molded product with a homogeneous, high-density corrosion-resistant coating that has excellent barrier properties, preventing the penetration of corrosive substances. - The joints are designed with a double structure of molded products and corrosion-resistant seals, providing excellent durability features that prevent damage to the joint area due to stress concentration and other factors.

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sewer Manhole Anti-Corrosion Mortar Lining Method Z Mortar KS500M Method

Can be constructed even in high humidity environments. The construction thickness can be freely chosen based on the service life.

The Z Mortar KS500M method is a mortar lining technique that uses Z Mortar KS500. It demonstrates excellent sulfuric acid resistance due to the formulation of special powders derived from blast furnace slag, providing high strength. ▼Features - It can be applied in high humidity environments and construction conditions with high moisture content in concrete, which traditional coating-type lining methods cannot accommodate. - Since the overlapping process of the coating-type lining method is unnecessary, the construction process and curing period are shorter, leading to reduced construction time. - By using blast furnace slag, it is an environmentally friendly product that reduces the burden on the environment (reducing resources, energy, and CO2 emissions).

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water supply facility anti-corrosion and waterproofing (epoxy resin) Jic Resin NP-143F method

Water supply concrete tank interior coating method

▼Overview The Zick Resin NP-143F method is a coating technique that protects the inner surface of concrete water tanks used in water supply systems by layering a bisphenol F type epoxy resin topcoat that complies with the Japan Water Works Association's JWWA K143 standard and a high-strength epoxy resin-based polymer cement substrate preparation material (Zick Resin HE104X). ▼Features - By applying a substrate preparation material that combines high-strength epoxy and powdered formulations, it possesses excellent adhesion stability functions that prevent adhesion damage to the coating film caused by various stresses occurring at the adhesion interface between the concrete and the coating layer. - It exhibits excellent adhesion regardless of the surface moisture content of the concrete substrate, eliminating the need for drying and moisture measurement of the substrate, allowing for economical and efficient construction. - A smooth substrate that has been prepared allows for the easy formation of a defect-free coating film with uniform thickness. - It forms a robust, opaque cured coating film with excellent chemical resistance. - The cured coating film meets the standards specified in the Japan Water Works Association standard JWWA K143. - The cured coating film complies with the water quality standards related to water supply facilities as stipulated by the Ministry of Health, Labour and Welfare.

  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration