Drainage construction Revo II method
The method of constructing a shaft easily and at low cost using the Rev II shaft machine, which is a further miniaturized version of the Rev shaft machine. 【Features】 ○ The Rev shaft machine has been further miniaturized, reducing its width to 1.7m and weight to 1.46t, and achieving a split-type design (upper part: 0.74t, lower part: 0.72t), allowing for the transportation and installation/removal of the machine using a 2t crane truck (lifting capacity of 2t). ○ With easier installation and removal, casing recovery has become possible. This allows the casing costs, which accounted for a large portion of construction expenses, to be recorded as a loss, enabling further cost reductions. ● For other functions and details, please contact us.
Inquire About This Product
basic information
The method of constructing shafts easily and at low cost using the Rev II shaft machine, which is a further miniaturization of the Rev shaft machine. 【Features】 ○ The Rev shaft machine has been further miniaturized to a width of 1.7m and a weight of 1.46t, achieving a split-type design (upper part: 0.74t, lower part: 0.72t), allowing for the transport and installation/removal of the machine using a 2t crane truck (lifting capacity of 2t). ○ With easier installation and removal, casing recovery has become possible. This allows the casing costs, which accounted for a large portion of construction expenses, to be recorded as a loss, enabling further cost reductions. ● For other functions and details, please contact us.
Price information
-
Delivery Time
Applications/Examples of results
【Purpose】 ○ Pipeline construction
Company information
In recent years, the reality is that increasingly strict construction conditions are required for urban drainage works. In this context, thrust construction demonstrates outstanding effectiveness in narrow spaces. It has achieved a speed-up in construction that is both safe and economical, as well as space-saving.