Drainage construction Revo method
This is a method for constructing a vertical shaft using a circular casing tube without the use of sheet pile supports or liner plates, utilizing a revocable shaft machine. 【Features】 ○ The equipment is compact, requiring a small footprint. Additionally, with a body weight of 3.4 tons, it can be transported by a 4-ton truck. ○ Even in urban construction, it is less affected by nearby structures and obstacles compared to conventional methods, allowing for efficient work progress through the use of cover plates and other materials. ● For other functions and details, please contact us.
Inquire About This Product
basic information
This is a method for constructing a vertical shaft using a circular casing tube without the use of sheet pile supports or liner plates, utilizing a revocable shaft machine. 【Features】 ○ The equipment is compact and occupies a small area. Additionally, with a body weight of 3.4 tons, it can be transported by a 4-ton truck. ○ Even in urban construction, it is less affected by nearby structures and obstacles compared to conventional methods, and work can be carried out efficiently using cover plates and other materials. ● For other functions and details, please contact us.
Price information
-
Delivery Time
Applications/Examples of results
【Purpose】 ○ Pipeline construction
Company information
In recent years, the reality is that increasingly strict construction conditions are required for urban drainage works. In this context, thrust construction demonstrates outstanding effectiveness in narrow spaces. It has achieved a speed-up in construction that is both safe and economical, as well as space-saving.