Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

2341~2355 item / All 4237 items

Displayed results

Unit house | Rental use OK! Authentic design & fast construction

Design and quality for "limited-time architecture" with features like full glass and wood-patterned louvers.

Our company offers a "unit house" that pursues design and comfort, which is difficult to achieve with conventional unit houses and prefabs. You can easily use it for rent, and we provide a variety of options such as "full glass" and "wooden louver panels," enabling us to respond to urgent needs with fast construction! It is ideal for various spaces that prioritize comfort and design, such as event facilities, residential sales offices, temporary offices or stores during reconstruction periods, while being used temporarily. Of course, we also support building confirmation applications. 【Features】 ■ Bright white color walls (exterior and interior) ■ Rentable FIX front glass ■ A wide range of options that can be freely combined ■ Standard equipment includes parapets, base covers, and downspouts for a clean appearance ■ Achieves an open space with a ceiling height of 2.34m (high type is 2.69m) ■ Super-fast construction produced in a factory and installed on-site *For other functions and details, please contact us.

  • Prefab
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Plus (Extended Lane)

Simple Expansion Method for Road Widening

This is a simple cantilever road widening method aimed at small-scale road widening of approximately 1.5 meters in narrow sections of roads in mountainous areas.

  • Dam construction
  • Airport facilities
  • Civil Engineering CAD

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wide Wall Method (Roadway Widening Method)

Road widening method completed simultaneously with block stacking.

This technology allows for an approximately 2-meter widening by being constructed in the same manner as conventional large block retaining walls, and it enables a lower wall height compared to traditional methods when widening roads in steep terrain. Additionally, it reduces the amount of excavation needed, making it environmentally friendly and promising cost reductions. Received the 11th National Land Technology Development Award in FY 2009 [Regional Contribution Technology Award].

  • Dam construction
  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Total Cost Reduction Method "Sun K Clear Method"

Labor-saving, effort-saving, shortened construction period, and easy installation! Ideal for improving the work environment on-site.

The total cost reduction method "Sun K Clear Method" allows for the installation of precast products by adjusting the height with a jack and then floating the main body above the foundation using pre-installed "Raku Pita (height-fixing bolts)." Concrete is then filled into the gap, integrating the retaining wall with the base. This method enables the construction of a robust retaining wall while improving the working environment on-site, reducing installation time, and achieving labor and effort savings, resulting in a total cost reduction. 【Features】 ○ Easy installation ○ Safe construction ○ Complete integration ○ Reduced installation time, labor, and effort ○ Improved installation accuracy For more details, please contact us or download the catalog.

  • Airport facilities
  • River construction
  • Retaining wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration