iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35642items
    • Facilities
      Facilities
      56152items
    • Lighting and Interior
      Lighting and Interior
      17378items
    • Common materials
      Common materials
      36705items
    • Civil Engineering Materials
      Civil Engineering Materials
      9592items
    • Construction, work and methods
      Construction, work and methods
      27512items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29165items
    • IT/Software
      IT/Software
      34401items
    • others
      others
      76782items
    • Store and facility supplies
      Store and facility supplies
      4410items
    • Office and commercial supplies
      Office and commercial supplies
      11564items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      972items
    • Logistics Equipment
      Logistics Equipment
      6809items
    • Energy and Resources
      Energy and Resources
      11672items
  • Search for companies by industry

    • Information and Communications
      7228
    • others
      7098
    • Building materials, supplies and fixtures manufacturers
      6638
    • Service Industry
      4651
    • Trading company/Wholesale
      2997
    • Other construction industries
      2447
    • Electrical equipment construction business
      639
    • Interior Design
      526
    • Facility Design Office
      490
    • Construction Consultant
      465
    • Architectural design office
      358
    • retail
      346
    • Warehousing and transport related industries
      322
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      282
    • Interior construction business
      276
    • Medical and Welfare
      274
    • Educational and Research Institutions
      258
    • Building Management
      250
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      201
    • Housing manufacturers and construction companies
      186
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      126
    • Structural Design Office
      65
    • Finance, securities and insurance
      38
    • Restaurants and accommodations
      30
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction methods and technologies
  5. Renovation and repair methods
  6. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method"

Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method"

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Nov 05, 2025

日本海洋サービス 大阪支店
日本海洋サービス 大阪支店
  • Special site
  • Official site

Over 90 construction achievements! We support bridge pier reinforcement nationwide with "shortened construction periods and expanded application scope"!

The "Temporary Closure LPF Method" is a construction method for building temporary closures of underwater structures such as rivers, seas, and dams using liner plates. The Temporary Closure LPF Method contributes to shortening construction periods and ensuring holidays through the following means: - Reducing the production of custom components for each pier - Selecting suitable shapes based on site conditions It can be implemented using manual labor alone and is feasible in environments with a headroom restriction of approximately 1.0 meters or less. *Please refer to the case study collection that includes examples of the construction achievements of the "Temporary Closure LPF Method." 【Features】 ■ Composed of liner plates, H-beams (reinforcement rings), and supports ■ Assembled in a cylindrical shape above water and installed underwater ■ Construction is possible with a headroom restriction of approximately 1.0 meters! *Record: 1.2m ■ Vibration-free construction is possible in narrow spaces! *For method comparison materials and construction case studies, please download the PDF to view.

    Renovation and repair methods
株式会社日本海洋サービス様_制作画像.png

Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method"

株式会社日本海洋サービス様_制作画像.png
株式会社日本海洋サービス様_制作画像.png
  • Temporary deadline LPF method HP
  • Special site - Product/service details - https://pr.www.ipros.com/nihonkaiyo-sv/product/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

■Temporary Closure Shapes Circular, oval, rectangular, U-shaped For more details, please refer to the catalog. Feel free to contact us for estimates or inquiries. ■Materials for Estimate - Documents that can identify the location of the bridge pier - PDF of bridge pier structural drawings or general drawings, etc.

Price information

Please contact us.

Delivery Time

Please contact us for details

※Please contact us.

Applications/Examples of results

【General Scope of Application】 ■ Structures built in rivers, seas, dams, etc. 【Particularly Effective Scope of Application】 ■ Advantages of platform (over water) work  ・Not affected by underwater environments  ・Locations where flow velocity changes ■ Structural characteristics  ・Low bridge piers  ・Locations where machinery cannot be used  ・Locations where vibrations cannot be applied *For more details, please refer to the catalog or feel free to contact us.

catalog(2)

Download All Catalogs
Provisional Deadline LPF Method Construction Catalog

Provisional Deadline LPF Method Construction Catalog

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Provisional Deadline LPF Method Construction Achievements

Provisional Deadline LPF Method Construction Achievements

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

News about this product(2)

[Catalog Renewal] Tentative Deadline LPF Method Construction Catalog / Japan Ocean Services Co., Ltd.

  • Catalog news

The "Temporary Closure LPF Method" is a construction method for creating temporary closures for underwater structures such as rivers, seas, and dams using liner plates. The Temporary Closure LPF Method contributes to shortening construction periods and securing holidays through the following means: - Reducing the production of custom components for each pier - Selecting the optimal shape based on site conditions It can be implemented using manual labor alone and is feasible in environments with a headroom restriction of approximately 1.0 meters or less. *Please refer to the case studies that showcase the construction achievements of the "Temporary Closure LPF Method." 【Features】 ■ Composed of liner plates, H-beams (reinforcement rings), and supports ■ Assembled in a cylindrical shape above the water surface and installed underwater ■ Construction is possible with a headroom restriction of approximately 1.0 meters! *Achievement at 1.2 meters ■ Vibration-free construction is possible in narrow areas!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Catalog Renewal] Tentative Deadline LPF Method Construction Achievements / Japan Ocean Services Co., Ltd.

  • Catalog news

The "Temporary Closure LPF Method" is a construction method that builds temporary closures for underwater structures such as rivers, seas, and dams using liner plates. The Temporary Closure LPF Method contributes to shortening construction periods and securing holidays as follows: - Reduces the production of custom components for each pier. - Selects the optimal shape based on site conditions. It can be implemented using manual labor alone and is feasible in environments with a headroom restriction of approximately 1.0 meters or less. *Please refer to the case study collection that includes examples of the construction achievements of the "Temporary Closure LPF Method." 【Features】 ■ Composed of liner plates, H-beams (reinforcement rings), and supports. ■ Assembled in a cylindrical shape above the water surface and installed underwater. ■ Construction is possible with a headroom restriction of approximately 1.0 meters! *Achievement at 1.2 meters. ■ Vibration-free construction is possible in narrow areas!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Companynews list (2)

Company information

日本海洋サービス

日本海洋サービス 大阪支店

Building materials, supplies and fixtures manufacturers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

Nihon Kaiyō Service Co., Ltd. has been engaged in underwater work in marine civil engineering since its establishment in 1972. Thanks to our efforts, we have reached our 43rd anniversary, receiving orders from government agencies as well as major general construction companies. Through our business, we strive to contribute to society and fulfill our social responsibilities by continuously working to develop technology and improve construction accuracy. Our company motto, "Do not be bound by the established, enrich your imagination, and always be a person who looks to the future," guides us as we work together as a team to enhance our technical skills and strengthen our corporate structure. We appreciate your continued support for Nihon Kaiyō Service Co., Ltd.

Product/Service List (24)

Popular products in related categories

Comparison with General Construction Methods: "Temporary Closure FPS Method"
Construction, work and methods
Comparison with General Construction Methods: "Temporary Closure FPS Method"
アザイ技術コンサルタント
Temporary closure LPF method suitable for bridge pier reinforcement work
Construction, work and methods
Temporary closure LPF method suitable for bridge pier reinforcement work
日本海洋サービス 大阪支店
Temporary Closure LPF Method Supporting the Maintenance and Management of Public Bridges
Construction, work and methods
Temporary Closure LPF Method Supporting the Maintenance and Management of Public Bridges
日本海洋サービス 大阪支店
Temporary closure LPF method supporting seismic reinforcement of bridges
Construction, work and methods
Temporary closure LPF method supporting seismic reinforcement of bridges
日本海洋サービス 大阪支店
LPF method for temporary cofferdams for bridge piers to improve construction efficiency.
Construction, work and methods
LPF method for temporary cofferdams for bridge piers to improve construction efficiency.
日本海洋サービス 大阪支店

Related New Products

Sustainable Machinery Equipment Service
Facilities
Sustainable Machinery Equipment Service
明和工業
"End! Look forward to the next time" Max Company Tube Marker Letter Twin
Facilities
"End! Look forward to the next time" Max Company Tube Marker Letter Twin
日幸電機 仙台営業所
Introduction to the Environmental and Plant Division of Tokyo Equipment Industry Co., Ltd.
Construction, work and methods
Introduction to the Environmental and Plant Division of Tokyo Equipment Industry Co., Ltd.
東京機材工業 本社・北海道支店・東北支店・横浜支店・名古屋支店・大阪支店・広島支店・九州支店 他13の機材センター
Snow Removal Considerate Cast Iron Grating for Snow Removal Routes
Construction, work and methods
Snow Removal Considerate Cast Iron Grating for Snow Removal Routes
ネプラス工法全国会 本部

The related categories of Renovation and repair methods

  • Construction, work and methods
  • Construction methods and technologies
  • Renovation and repair methods
Find products and companies by related keywords
  • #Construction method
  • #Closure method
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.