Three-story, reinforced concrete structure, retaining wall, etc., optimal as a ground reinforcement method requiring government approval!
When planning a basement for structures that exceed the design ground bearing capacity of 30 kN/m² → When it is necessary to embed the foundation to the angle of repose (30° line) For structures that are difficult to approve with ground improvement and would be over-spec with PC piles → Steel-framed buildings of 3 to 4 stories / retaining walls with a design ground bearing capacity of less than 100 kN/m², etc.
Inquire About This Product
basic information
High end bearing capacity - Applicable to ground with N value less than 15 - Adaptable to cohesive soil layers as bearing layers - SMD pile design end bearing capacity End wing structure for initial settlement suppression Use of stable and high-quality blast furnace materials Strict quality control and construction management Sufficient adaptability to narrow sites with small construction machinery High end bearing capacity Economical pricing for small-scale buildings
Price range
Delivery Time
Applications/Examples of results
The process until approval is efficient, and the design work becomes more effective.
Detailed information
-

Structures subject to guidance from the government office during the application confirmation!
catalog(1)
Download All CatalogsCompany information
-


![[Construction Case Studies] Special Feature on Removed Underground Obstacles (6)](https://image.www.ipros.com/public/product/image/6d8/2000934047/IPROS09084275916240559087.png?w=280&h=280)
![[Disaster Prevention] Super Rappuru El Nido Method Construction Technical Performance Certificate](https://image.www.ipros.com/public/product/image/2115299/IPROS11180979871704004385.png?w=280&h=280)





