List of Civil Engineering products
- classification:Civil Engineering
1~45 item / All 7965 items
You can install scaffolding on the float! Enjoy the water space freely! Information on floating dock rentals.
- Bridge Materials
Snow removal measures for structures! The future snow melting system that melts snow with infrared radiation.
- Snow melting equipment
- Exterior snow melting equipment
- Paving of sidewalks, roads, parking lots and stadiums

【Nihon Kōdenki Exhibition Information】We will be exhibiting at the "Industrial Exchange Exhibition 2024 @ Tokyo Big Sight" from November 22 (Wednesday) to November 24 (Friday), 2024!
Our company will be exhibiting at the "Industrial Exchange Exhibition 2024" held at Tokyo Big Sight from November 22 (Wednesday) to November 24 (Friday), 2024. Exhibition: "Industrial Exchange Exhibition 2024" (https://www.sangyo-koryuten.tokyo/) Schedule: November 22 (Wednesday) to November 24 (Friday), 2024 Time: 10:00 AM to 5:00 PM (until 4:00 PM on the final day) Location: Tokyo Big Sight, West Halls 1 & 2, Atrium Address: 3-11-1 Ariake, Koto-ku, Tokyo 135-0063 Booth No.: To be announced upon confirmation. [Nikko Electric Co., Ltd. Satellite ★ Akiba] Address: 4th Floor, Yuki Building, 23-2 Kanda Higashimatsushita-cho, Chiyoda-ku, Tokyo TEL: 03-3518-5050 FAX: 03-3518-5051 http://www.nikkodenki.com
Standardization and miniaturization of wiring circuit breakers and residual current devices! We are pursuing ease of use!
- Power distribution and control panels
- Wiring devices
- Power generation facilities

【Nihon Kōdenki Exhibition Information】We will be exhibiting at the "Industrial Exchange Exhibition 2024 @ Tokyo Big Sight" from November 22 (Wednesday) to November 24 (Friday), 2024!
Our company will be exhibiting at the "Industrial Exchange Exhibition 2024" held at Tokyo Big Sight from November 22 (Wednesday) to November 24 (Friday), 2024. Exhibition: "Industrial Exchange Exhibition 2024" (https://www.sangyo-koryuten.tokyo/) Schedule: November 22 (Wednesday) to November 24 (Friday), 2024 Time: 10:00 AM to 5:00 PM (until 4:00 PM on the final day) Location: Tokyo Big Sight, West Halls 1 & 2, Atrium Address: 3-11-1 Ariake, Koto-ku, Tokyo 135-0063 Booth No.: To be announced upon confirmation. [Nikko Electric Co., Ltd. Satellite ★ Akiba] Address: 4th Floor, Yuki Building, 23-2 Kanda Higashimatsushita-cho, Chiyoda-ku, Tokyo TEL: 03-3518-5050 FAX: 03-3518-5051 http://www.nikkodenki.com
It is also possible to connect multiple mats to a single power source for installation! Since it is an add-on, it is easy to install!
- Exterior snow melting equipment

【Nihon Kōdenki Exhibition Information】We will be exhibiting at the "Industrial Exchange Exhibition 2024 @ Tokyo Big Sight" from November 22 (Wednesday) to November 24 (Friday), 2024!
Our company will be exhibiting at the "Industrial Exchange Exhibition 2024" held at Tokyo Big Sight from November 22 (Wednesday) to November 24 (Friday), 2024. Exhibition: "Industrial Exchange Exhibition 2024" (https://www.sangyo-koryuten.tokyo/) Schedule: November 22 (Wednesday) to November 24 (Friday), 2024 Time: 10:00 AM to 5:00 PM (until 4:00 PM on the final day) Location: Tokyo Big Sight, West Halls 1 & 2, Atrium Address: 3-11-1 Ariake, Koto-ku, Tokyo 135-0063 Booth No.: To be announced upon confirmation. [Nikko Electric Co., Ltd. Satellite ★ Akiba] Address: 4th Floor, Yuki Building, 23-2 Kanda Higashimatsushita-cho, Chiyoda-ku, Tokyo TEL: 03-3518-5050 FAX: 03-3518-5051 http://www.nikkodenki.com
[Video] Introducing Nichiko Electric's company, products, and factory in a video (Custom transformer manufacturer Nichiko Electric Co., Ltd.)
- Snow melting equipment
- Sweeping vehicles, grass cutting vehicles, road surface regeneration machines, snow removal machines
- Exterior snow melting equipment
Information on snow melting systems and floor heating systems from the professional team at Nikkou Electric Sendai Sales Office! Prepare for a comfortable winter starting now!
- Snow melting equipment
- Sweeping vehicles, grass cutting vehicles, road surface regeneration machines, snow removal machines
- Paving of sidewalks, roads, parking lots and stadiums
A comfortable winter free from the struggles of snow shoveling! Easy and effortless one-touch operation for anyone!
- Exterior snow melting equipment

【Nihon Kōdenki Exhibition Information】We will be exhibiting at the "Industrial Exchange Exhibition 2024 @ Tokyo Big Sight" from November 22 (Wednesday) to November 24 (Friday), 2024!
Our company will be exhibiting at the "Industrial Exchange Exhibition 2024" held at Tokyo Big Sight from November 22 (Wednesday) to November 24 (Friday), 2024. Exhibition: "Industrial Exchange Exhibition 2024" (https://www.sangyo-koryuten.tokyo/) Schedule: November 22 (Wednesday) to November 24 (Friday), 2024 Time: 10:00 AM to 5:00 PM (until 4:00 PM on the final day) Location: Tokyo Big Sight, West Halls 1 & 2, Atrium Address: 3-11-1 Ariake, Koto-ku, Tokyo 135-0063 Booth No.: To be announced upon confirmation. [Nikko Electric Co., Ltd. Satellite ★ Akiba] Address: 4th Floor, Yuki Building, 23-2 Kanda Higashimatsushita-cho, Chiyoda-ku, Tokyo TEL: 03-3518-5050 FAX: 03-3518-5051 http://www.nikkodenki.com
Responding to various environmental needs! Pursuing the ideal road heating based on half a century of achievements and trust!
- Snow melting equipment
- Exterior snow melting equipment
- Paving Materials

【Nihon Kōdenki Exhibition Information】We will be exhibiting at the "Industrial Exchange Exhibition 2024 @ Tokyo Big Sight" from November 22 (Wednesday) to November 24 (Friday), 2024!
Our company will be exhibiting at the "Industrial Exchange Exhibition 2024" held at Tokyo Big Sight from November 22 (Wednesday) to November 24 (Friday), 2024. Exhibition: "Industrial Exchange Exhibition 2024" (https://www.sangyo-koryuten.tokyo/) Schedule: November 22 (Wednesday) to November 24 (Friday), 2024 Time: 10:00 AM to 5:00 PM (until 4:00 PM on the final day) Location: Tokyo Big Sight, West Halls 1 & 2, Atrium Address: 3-11-1 Ariake, Koto-ku, Tokyo 135-0063 Booth No.: To be announced upon confirmation. [Nikko Electric Co., Ltd. Satellite ★ Akiba] Address: 4th Floor, Yuki Building, 23-2 Kanda Higashimatsushita-cho, Chiyoda-ku, Tokyo TEL: 03-3518-5050 FAX: 03-3518-5051 http://www.nikkodenki.com
Not afraid of snow or cold! Check out the full details of the latest snow melting and floor heating systems here.
- Snow melting equipment
- Exterior snow melting equipment
- Paving Materials
The Soheater is an electric snow melting mat manufactured by Hokkaido Rubber Industry Co., Ltd., designed to efficiently melt snow and ice on entrances, walkways, stairs, and more!
- Snow melting equipment
- Exterior snow melting equipment
- Sweeping vehicles, grass cutting vehicles, road surface regeneration machines, snow removal machines
Nikkou Electric Sendai Sales Office, a professional group specializing in snow melting, has been protecting safety from snow damage in the seven prefectures of Tohoku.
- Snow melting equipment
- Sweeping vehicles, grass cutting vehicles, road surface regeneration machines, snow removal machines
- Exterior snow melting equipment
The situation of home users can be seen in the mirror, providing peace of mind! Here’s an example of how staff burdens have been reduced! (Oizumi Disability Support Home)
- Safety devices for the visually impaired
- Acrylic mirror
- Security cameras and surveillance systems
Monitoring of safety zones for adjacent construction work in the lower section of the parking area.
- Bridge Construction
- Railway Construction
- Steel structure construction
The timing of maintenance can be confirmed in a timely manner, achieving a reduction in the building's life cycle costs!
- Paving of sidewalks, roads, parking lots and stadiums
- Waterproofing work
Providing suitable construction methods for various conditions and areas in parking lots!
- Paving of sidewalks, roads, parking lots and stadiums
- Waterproofing work
We will innovate the market with the technology and know-how gained from our experience of 5.6 million square meters of parking lots!
- Paving of sidewalks, roads, parking lots and stadiums
- Waterproofing work
Beach nourishment project on the coast facing the Sea of Japan.
- Harbor Construction
- IoT
Introducing our construction support materials, including the "AC High Power Pump" equipped with three nozzles!
- Air compressors, blowers and pumps
- Other civil engineering works
- Earthworks
This is a proposal for the utilization of the disaster prevention system ZEROSAI. Gradual water level alerts and understanding upstream weather information in conjunction with the site.
- River construction
- Weather Survey
The "Natural Disaster Prevention System ZEROSAI" can operate using solar power and Starlink.
- Erosion control works
- Dam construction
Easily obtain real-time wave heights on-site! [NETIS registration number QSK-170002-VE]
- Harbor Construction
- Coastal construction
- Weather Survey

September to November: Three-month forecast announced by the Meteorological Agency. The lingering heat is persistent, and autumn arrives quickly.
On August 19th (Tuesday), the Japan Meteorological Agency announced the three-month forecast from September to November. During this period, the upper-level westerlies are expected to flow more to the north than usual, and the Tibetan high-pressure system is anticipated to be stronger and positioned further north than average. *For more details, please visit our website or feel free to contact us.*
Observe pinpoint wave heights and make quick decisions to halt operations! Achieve DX of weather and ocean conditions using ICT!
- Harbor Construction
- Coastal construction
Cloud management of weather information automatically triggers alarms to ensure safety.
- Road construction

[Examples of Technical Proposal Utilization] ○○ Line Road Improvement Project Clarification of Work Suspension Criteria Automatic Alarm Activation for Safety Assurance Rainfall Measures Guerrilla Rainstorms ICT DX Remote Monitoring Guerrilla Rainstorms Electronic Display Boards Technical Proposals Creativity and Innovation
■On-site Issues: Focus Points in Evaluation During the construction period, sudden weather changes such as guerrilla rainstorms unique to mountainous areas are anticipated. These can lead to delays in various processes and a decline in quality, requiring extensive discussions for improvement, which in turn leads to further delays. For more details, please visit our company website or product release information. https://product.sysmet.jp/exercise/k_131.html
Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together!
- Other civil engineering works

[ZEROSAI Case Study] Private Company - Solar Power Plant Construction Project. Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together! Achieving weather digital transformation (DX) using ICT!
Introducing a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There is a distance from the site office to the actual site, requiring personnel to move to confirm the site conditions. - During earthworks, it is necessary to be cautious of the flow of soil, so accurate understanding of weather conditions is essential. 【Operations to Solve the Challenges】 Please download the PDF for more details.
Centralized management of wave height predictions and observations in the cloud.
- Harbor Construction
- Weather Survey
- Airport facilities

The NETIS number for 【Compass PLUS】 has changed to "QSK-210001-VE".
Thank you very much for using our services. The registration number for 【Compass PLUS】, which was registered in the Ministry of Land, Infrastructure, Transport and Tourism's new technology information provision system NETIS in 2021, has changed to QSK-210001-VE. We will continue to strive to provide information that satisfies everyone, so please make use of Compass PLUS! ≪Ministry of Land, Infrastructure, Transport and Tourism NETIS (New Technology Provision System)≫ https://www.netis.mlit.go.jp/NETIS
Automatic notification of information regarding heatstroke via business chat.
- Other civil engineering works
- Road construction
- Weather Survey

[ZEROSAI Implementation Case] Regional Development Bureau National Route No. 〇 Road Improvement Project
[Before Implementation] We want to share information about heatstroke on-site and improve safety measures for workers. <Challenges> It is necessary to obtain weather information that is relevant to the site. We need to monitor the Wet Bulb Globe Temperature (WBGT) and share information with all stakeholders in real-time. Using the Weather Forecast Analysis Distribution System [Disaster Prevention Panel], we conducted predictions of the Wet Bulb Globe Temperature (WBGT) and installed weather observation equipment [N Sensor] on-site to monitor the WBGT. Additionally, by linking the Disaster Prevention Panel with business chat, we efficiently shared information with stakeholders.
I will introduce the advantages of battery-operated water level gauges.
- River construction

Three-color indicator light: Convenient usage techniques in conjunction with battery-operated water level gauge.
We would like to introduce convenient ways to utilize the newly released product, the "Three-Color Indicator Light," which was developed based on feedback from everyone. The "Three-Color Indicator Light" can be combined with a "Battery-Powered Water Level Gauge" to sound alarms based on segmented water level observations. Usage Examples: Monitor water level observations in three stages and take appropriate actions according to the level. Detect the risk of rapid water level rise during rainfall and take early preventive actions to ensure safety. - Set the baseline water level of 2m as Level 1: The green indicator light rotates, indicating standby. - Set the baseline water level of 4m as Level 2: The yellow indicator light rotates, indicating caution. - Set the baseline water level of 5m as Level 3: The red indicator light rotates, indicating evacuation. Additionally, the "Disaster Prevention Light" can display messages for workers and community members on a daily basis. Raising awareness of safety measures at the site is crucial through consistent practices such as daily KY (Kiken Yochi, or hazard prediction) and pointing out dangerous areas and points of caution. Let’s continuously display what to be cautious about during this season and strive to improve safety awareness across the entire site. Please feel free to utilize this for safety measures at the site, as well as for technical proposals and creative ideas. *For more details, please refer to the PDF document or feel free to contact us.
Improved usability by separating the pump body and electrical components! The discharge pressure and flow rate are the strongest with our 100V power supply type!
- Reinforced concrete construction
Investigate and analyze the causes of the tilt, the degree of tilt, and the ground in detail!
- Site and ground investigation
We propose construction methods tailored to your situation! Leave your sinking correction work to us.
- Ground foundation construction method
- Site and ground investigation
Typhoon and strong wind countermeasure specifications! Aluminum overhead door designed for environments requiring high wind pressure resistance.
- Special function opening
- shutter
- Pipeline Construction
A combination that creates a synergistic effect between aluminum and FRP (fiberglass). Lightweight, strong, and featuring soft light transmission properties, FRP has it all.
- shutter
- Overhead door
- Coastal construction
Bridge deck waterproofing NS Pearl method (for civil engineering)
- Foundation construction
- Waterproofing work
- Pavement construction
Introducing the Solcomat method adopted for river disaster recovery due to heavy rain damage!
- River construction
We propose an alternative method for slope protection at the backfill area next to the sediment control dam!
- Slope protection material
- Erosion control works
Introducing construction examples of waterproof sheets and Solcomat used in river levee reinforcement projects!
- River construction
We propose an alternative method for slope protection at the backfill area next to the sediment control dam!
- Erosion control works
Reinforcement of the back slope of river levee confluence! Introducing GeoWeb construction examples.
- River construction
An example of proposing river levee reinforcement based on a watershed management project!
- River construction
Introducing a case study of geotextile-reinforced embankment disaster recovery works for small-scale road disasters in Sawabe!
- Earth retaining wall/foundation reinforcement
It is possible to shorten the construction period! Introducing examples of temporary drainage construction in emergency response projects.
- Formwork material
- Other civil engineering works
Lightweight aluminum body!
- Dismantling and moving
- others
A case where we proposed an alternative method for cast-in-place concrete in the presence of spring water!
- Formwork material
- Other civil engineering works
We propose a method for reinforcing river levees as a crisis management hard measure! Case study from Typhoon No. 19.
- Slope protection material
- River construction