Construction method "Mini Anchor PI"
Through improvements, the conventional method, "Mini Anchor Method" "DO," has evolved to the new method "PI"!
The "Mini Anchor PI" is a construction method that can be implemented without the use of large machinery, making it possible to work in areas with limited space. Due to the bearing resistance effect of the enlarged tip, the length of the reinforcement material can be shortened, and the pitch can be widened, resulting in fewer installations and improved overall workability. Additionally, because the installation length is short, it is useful in cases where encroachment on adjacent boundaries is a concern. 【Features】 ■ Can be constructed with simple equipment ■ Improved workability ■ Avoids boundary encroachment ■ Pressurized grout injection ■ Prevention of grout leakage *For more details, please download the PDF or feel free to contact us.
- Company:大日本土木
- Price:Other