A construction method using a compact propulsion device that enables highly efficient excavation!
At Kinki Development Co., Ltd., we handle the "CBM Method," which is constructed using a small-sized thrust machine developed for horizontal boring (double casing method) from a launch shaft of 2,000mm to 4,000mm. The construction range is smaller, allowing for cutter head replacement during excavation (casing return type). Therefore, it can accommodate various soil types and obstacles. 【Features】 ■ Adopts horizontal boring method (double casing method) ■ Uses a small-sized thrust machine for construction ■ Smaller construction range ■ Cutter head replacement during excavation (casing return type) is possible ■ Capable of handling various soil types and obstacles *For more details, please refer to the catalog or feel free to contact us.
Inquire About This Product
basic information
【Applicable Environments】 ■ Underground Obstacles - Steel sheet piles - Wooden piles - PC piles, etc. ■ Gravel and Cobble Layers - High gravel content - Large cobbles - Presence of giant boulders ■ Consolidated Clay Layers - Inconsistent clay strength ■ Bedrock Layers - Interlayers of bedrock and gravel layers, etc. ■ Inaccessible Shaft Excavation - The leading pipe (cutter head) is retrieved at the launch shaft. ■ Crossing Roads, Tracks, and Rivers ■ Inability to Excavate Large Shafts ■ Access to Existing Shields and Manholes *For more details, please refer to the catalog or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
At Kinki Development Co., Ltd., our main business is a method called small-diameter thrust construction. We handle various construction works for public water supply and sewage systems, as well as the installation of gas pipes and electrical cables. We utilize various methods such as the CBM method (steel casing method, horizontal boring method [double casing type]), SH method (steel casing method, boring method [double casing type]), and the Rockman method (mud water thrust construction). Additionally, we also undertake various shaft construction works and various chemical injection and ground improvement works. Please feel free to contact us.