Reinforcement work Product List and Ranking from 25 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Sep 30, 2026~Oct 27, 2026
This ranking is based on the number of page views on our site.

Reinforcement work Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 30, 2026~Oct 27, 2026
This ranking is based on the number of page views on our site.

  1. ジオテック Tokyo//Other construction industries
  2. 基土木 Okinawa//Other construction industries
  3. オリエンタル白石 本社 Tokyo//General contractors and subcontractors
  4. 4 地研テクノ Kanagawa//Construction Consultant
  5. 4 木材保存センター Tokyo//Service Industry

Reinforcement work Product ranking

Last Updated: Aggregation Period:Sep 30, 2026~Oct 27, 2026
This ranking is based on the number of page views on our site.

  1. Ground reinforcement work "Daku Pile Method (Small Diameter Steel Pipe Piles)" 基土木
  2. Foundation reinforcement work using aramid fibers and carbon fiber sheets. 木材保存センター
  3. Seismic reinforcement work "Grout (non-shrink mortar) work" アクト・ファクトリー 東京支店
  4. Oriental Shiraishi Technology Introduction オリエンタル白石 本社
  5. 4 Ground reinforcement work for commercial facilities | Reducing construction costs and duration with DM method ジオテック

Reinforcement work Product List

31~60 item / All 69 items

Displayed results

Ground reinforcement work "Daku Pile Method (Small Diameter Steel Pipe Piles)"

Developing weak ground! A ground reinforcement construction method with high performance evaluation, featuring low vibration and low noise.

The "Dacpile Method (Small Diameter Foundation Steel Pipe Piles)" utilizes high-strength, corrosion-resistant Dacpile pipes and incorporates the miniaturization of heavy machinery, enabling construction in difficult-to-access locations and narrow sites for ground reinforcement work. Dacpile features an integrally formed tip blade and pile body, possessing robust and uniform material strength throughout all parts. Additionally, the enlarged base effect of the tip blade allows for significant vertical load-bearing capacity due to the increased blade area. 【Features】 ■ Adoption of high-strength, corrosion-resistant Dacpile pipes ■ Realization of no-welding on-site ■ 10-year construction warranty *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco-friendly measures: "Heat prevention construction" "Roof reinforcement construction" *Case studies available.

Improving the work environment, restoring the strength and aesthetics of the roof, and solving factory challenges such as energy conservation. Numerous achievements.

Our company specializes in "heat prevention construction" using heat-insulating sheets and special coatings, as well as "roof reinforcement construction." We solve concerns such as "the workspace is hot due to equipment heat dissipation," "I want to repair the roof at a low cost," and "I want to reduce electricity costs." We contribute to improving factory environments and reducing running costs. 【Heat Prevention with Heat-Insulating Sheets】 - Heat prevention for equipment that generates heat, such as heaters, molding machines, and furnaces is possible. - It suppresses the rise in room temperature and reduces energy costs. - Proven results in drying furnaces at automotive parts factories. 【Reinforcement and Insulation of Slate Roofs with Special Coatings】 - Reinforcement and heat insulation are achieved by applying three layers of special coatings. - Strengthening roofs according to requests, including rust resistance, weather resistance, and color. - There are cases where the strength of aging slate increased by about 30%. - Construction can be carried out without stopping factory operations. *We are currently offering materials with construction case studies! You can view them from "PDF Download." Please feel free to contact us.

  • Roof and gutter construction
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work "Columnar Improvement Method"

The improved ground can maintain the strength to support the building for a long time!

The "Columnar Improvement Method" involves injecting cement milk into stable ground, compacting the soil into columnar shapes using machinery, and then constructing a foundation on top of it. Columns made of a cement-based solidifying agent (soil improvement cement) mixed with soil, referred to as columns, are created within the ground. By selecting the appropriate soil hardening agent, this method can accommodate improvement work for various soil types, including clay and sand. 【Process】 ■ Using specialized construction machinery, excavate to the planned depth while injecting the cement-based solidifying agent. ■ Reverse the construction machinery to mix the soil and cement-based solidifying agent. ■ Raise and lower the pit of the construction machinery to mix the entire area. ■ Completion is achieved once the material is fully solidified. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • Site and ground investigation
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We will carry out tunnel repair and reinforcement work, including investigation, proposal, management, and construction.

It has been 20 years since we started repairing tunnels, bridges, and rivers. As a subcontractor, we have managed and executed many construction projects. First, we will provide an estimate.

We have conducted numerous management and construction projects to date. List of Tunnel Construction ● Interior Reinforcement Measures Various Continuous Fiber Sheets Reinforced Fiber Embedded Panels Copper Plates and Strips Rock Bolts Cross-Section Repair ● Back Void Measures Rigid Foam Polyurethane (12 to 40 times) Various Air Mortars ● Crack Measures Organic Materials (Injection of Epoxy, Acrylic, Polyurethane, etc.) Inorganic Materials (Injection of Ultra-Fine Particle Cement, Silicate, etc.) ● Water Leakage Measures Line and Surface Water Guidance Back Injection Drainage Boring System For other repair methods and inquiries, please contact us.

  • Tunnel construction
  • Bridge Construction
  • Renovation and repair methods
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We will carry out bridge repair and reinforcement work, including "investigation, proposal, management, and construction."

It has been 20 years since we started repairing bridges, tunnels, and rivers. As a subcontractor, we have managed and executed many projects. First, we will provide an estimate.

We have conducted numerous management and construction projects to date. List of Bridge Repair and Reinforcement Works Reinforcement ● Upper Side Carbon Fiber Sheets Lead Lines (CF Rebar) CFRP Plates (e-plates) ● Lower Side Carbon Fiber Sheets Lead Lines (CF Rebar) CFRP Plates (e-plates) Steel Plates ● Side (Girders) Out Plates Out Cables Additionally, we also undertake construction related to repairs. Please contact us for inquiries.

  • Bridge Construction
  • Renovation and repair methods
  • Tunnel construction
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement work

Improving endurance and rigidity! We will conduct an investigation for seismic reinforcement work.

Our company handles seismic reinforcement construction. The brace method allows for the completion of seismic reinforcement work by attaching braces to the column-beam frame of reinforced concrete or steel-reinforced concrete buildings. The concrete wall seismic method improves strength and rigidity by increasing the thickness of existing walls or adding reinforced concrete walls to openings. 【Features】 ■ Brace Method ■ Concrete Wall Seismic Method *For more details, please refer to the related links or feel free to contact us.

  • Earthquake-resistant construction method
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation reinforcement work using aramid fibers and carbon fiber sheets.

A worry-free home building that knows no cracks.

Construction Process 1. Current Condition Survey and Diagnosis Check for cracks, subsidence, and reduction in strength, and develop a reinforcement plan. 2. Surface Preparation Remove dirt and deteriorated areas from the concrete surface (grinding) and perform treatment (Teflon TW-1P) to improve adhesion. 3. Application of Aramid and Carbon Fiber Sheets Adhere the fiber sheets to the foundation using epoxy resin (New Teflon TC-4101). 4. Epoxy Resin Impregnation and Curing Allow the resin to penetrate, solidify the sheets, and promote integration with the concrete.

  • Residential foundations
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic recovery of residential fabric foundation settlement cracks using SWS investigation and partial jacking.

Clarifying the subsidence and cracks of the foundation through SWS investigation, and restoring seismic resilience with partial jacking up.

In residential foundation reinforcement, it is essential to address issues such as foundation settlement and cracking early on to maintain the long-term safety and comfort of the building. Particularly in the case of strip foundations, certain settlements and structural cracks can potentially impact the building's seismic resistance and structural strength. Ignoring these problems can accelerate the deterioration of the building and increase the risk of major repairs in the future or during an earthquake. Our settlement correction work addresses these challenges with scientific investigation and precise repair techniques, restoring the safety of the building. 【Usage Scenarios】 - Detached houses with partial settlement or structural cracks in strip foundations - Cases requiring recovery of the building's seismic resistance and structural strength - Situations where there is a desire to reduce the risk of future settlement or differential settlement during a major earthquake - Cases where construction needs to proceed while residents are still living in the home 【Benefits of Implementation】 - Reliable recovery of the building's seismic performance and structural strength - Stabilization of the foundation through precise horizontal correction at the millimeter level - Improvement of concrete structural strength through carbon fiber reinforcement - Fundamental elimination of future settlement risks through steel pipe pile driving - Construction that respects the residents' daily routines while they continue to live in the home

  • Renovation and repair methods
  • Pile and foundation work
  • Other earthworks, foundation works, and exterior floors
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsidance correction work | Low-noise ground reinforcement work to correct floor tilt during renovation.

Unexplained dizziness and headaches: Could the tilt of the floor be the cause? Restore the levelness of your home and a healthy living environment with a low-noise hydraulic jack method during renovations.

This catalog explains a sinking correction method that addresses the often-overlooked floor tilt during renovations, fundamentally improving residents' dizziness and health issues. Subtle floor inclinations caused by uneven ground subsidence can chronically stress the semicircular canals, leading to autonomic nervous system disturbances and headaches. Our company objectively clarifies the causes of subsidence through precise level measurements around the building and Swedish sounding (SWS) surveys. During construction, we carefully lift the building while monitoring its displacement in millimeter increments in real-time, using small hydraulic jacks. By employing low-noise equipment that minimizes operational sounds and vibrations, we can restore the level state within a short period without requiring residents to leave their familiar homes or move to temporary accommodations. Furthermore, by combining steel pipe pile driving into deep supporting layers and filling voids under the foundation, we thoroughly prevent future subsidence. We propose technology that enhances the structural safety of homes and realizes a safe and healthy living environment.

  • Renovation and repair methods
  • Pile and foundation work
  • Other earthworks, foundation works, and exterior floors
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction work | Identifying buried debris causing settlement in investigation gaps! Pressure plate renovation approach

Identify the subsidence of buried waste lurking in the gaps of the survey points! Revitalize the substructure before renovation with pinpoint underground exploration and pressure plate jacking.

When planning large-scale renovations or seismic reinforcement work, debris and buried waste hidden in the gaps of ground survey data can pose a hidden risk of uneven settlement, leading to floor re-tilting or fixture malfunctions after the completion of the construction. No matter how much the upper structure is renewed, if the foundation and the underlying ground's softening are left unaddressed, the building's inherent longevity cannot be achieved. At Geotech, we conduct hand auger drilling and pinpoint underground exploration as part of the ground and foundation diagnosis before starting renovations, visualizing the extent of buried waste and settlement factors as objective numerical data. In the leveling process, we apply a pressure plate jack-up method that does not require extensive demolition work, using small hydraulic jacks to achieve precise horizontal restoration in millimeter increments, leveraging the building's own weight as a reaction force. After lifting, we pressure-inject high-flow air bubble mortar (air milk) into the voids under the floor to equalize the ground pressure, and we encapsulate the damaged cloth foundation structure with high-adhesion epoxy resin to restore structural strength beyond that of new construction. Geotech's settlement correction work menu enhances the overall quality and durability of the renovation.

  • Renovation and repair methods
  • Residential foundations
  • Consulting companies
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Reduce costs with the ETP method for shortened construction periods and easy removal!

A next-generation ground reinforcement ETP method that achieves both shortened construction periods and cost reduction. It builds a solid foundation quickly with no soil disposal and no curing.

This document explains the importance of "ground reinforcement work" in achieving total cost reduction and shortening construction periods in construction projects, as well as the features of the "ETP method" that make this possible. In addressing soft ground, traditional methods faced challenges such as costs for disposing of excess soil and time losses due to curing periods. The ETP method is a soil displacement method that involves rotating and pressing a steel pipe equipped with a disc-shaped expansion wing and a drilling auxiliary bit into the ground. Since it does not use cement, there is no need for a curing period, allowing for immediate transition to the next process after pouring, and there are no costs for soil disposal. Additionally, during reconstruction, the piles can be easily removed and recovered by reversing the rotation, making it an economical and sustainable choice for future land use. With a combination of 16 sizes of pile diameters ranging from φ89.1mm to φ609.6mm and high-strength steel pipes, optimal designs without waste are possible. GeoTech Co., Ltd. significantly contributes to streamlining construction periods and costs while maintaining quality by managing construction data in real-time and ensuring prompt and accurate construction arrangements.

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Strengthening structural seismic resistance with the ETP method, which is strong in both pushing and pulling!

Strongly responds to pushing and pulling! ETP method enhances seismic resistance. The disc-shaped tip wings counteract loads from multiple directions, ensuring the safety of structures.

This document provides a detailed explanation of advanced technologies for "ground reinforcement work" and the "ETP method," which dramatically enhance the seismic resistance and safety of structures against multi-directional loads caused by earthquakes and strong winds. To prevent differential settlement and tipping accidents on soft ground, a reliable foundation structure that can withstand not only compressive loads but also tensile forces is essential. The ETP method is a rotary driven steel pipe pile method equipped with a disc-shaped enlarged wing and excavation auxiliary bit at its tip, which has received certification from the Minister of Land, Infrastructure, Transport and Tourism and has been publicly proven to have support performance in both compression and tension directions. The construction method, which does not use cement and generates no soil displacement, prevents soil contamination while achieving high penetration and strong resistance by compacting the surrounding ground. With a total of 16 sizes of pile diameter variations and the selection of high-strength 590N grade steel pipes, optimal designs without waste can be achieved even under complex stress conditions. GeoTech Co., Ltd. uses construction management equipment that automatically records rotational torque and penetration depth to accurately determine the reach of the support layer, providing reliable foundation work that is strong against earthquakes nationwide.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【工場建設向け】設備基礎の地盤補強工事|無排土施工で残土費用削減

【工場建設向け】無排土・低騒音の地盤補強で設備基礎のコスト削減

工場建設においては、設置される設備や機械の安定稼働を支える強固な基礎が求められます。特に、重量のある設備や精密な機器を設置する場合、地盤の沈下や不同沈下は、設備の性能低下や故障、さらには生産ラインの停止といった重大な問題を引き起こす可能性があります。そのため、確実な地盤補強工事による沈下対策が不可欠です。当社のRES-P工法は、セメントを使用しない貫入方式により、現場で発生する産業廃棄物(残土)をゼロに抑え、工事費と処分コストの大幅な削減を実現します。これにより、工期短縮とコスト効率の向上に貢献し、工場建設における設備基礎の信頼性を高めます。 【活用シーン】 ・重量機械設置のための設備基礎 ・精密機器設置のための基礎 ・軟弱地盤上の工場建設 ・狭小地での設備基礎工事 【導入の効果】 ・残土処分費用の削減 ・搬出入の手間とコストの削減 ・近隣環境への配慮(低騒音・低振動) ・施工機が軽量なため、現場の整地状態を維持しやすい

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SMD method for visualizing construction data and ensuring quality for apartment building construction.

Visualizing reliable construction quality through real-time data tracking with construction management devices and ISO quality management.

In the condominium construction industry, the stability of the ground is extremely important for the long-term safety of buildings and the maintenance of asset value. Ground subsidence can affect the structure of buildings, potentially leading to increased repair costs and decreased asset value. Therefore, a quantitative ground assessment and advanced site management to reduce subsidence risk are required. The SMD pile method by Geotech Co., Ltd. is a Minister of Land, Infrastructure, Transport and Tourism certified rotary-driven steel pipe pile method that leverages construction visualization and a strict quality control system to address these challenges. 【Usage Scenarios】 - Ground reinforcement in new condominium construction - Objective stopping judgment through comparison with ground survey data - Achieving uniform construction quality independent of operator experience 【Benefits of Implementation】 - Assurance of structural safety of buildings - Maintenance of asset value through reduced subsidence risk - Response to various ground guarantees backed by reliable data

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Providing objective assurance with the CWC method of GBRC performance certification.

The Cross-Wing Column Method enhances the reliability of ground reinforcement work. It objectively demonstrates structural safety with a reliable technology that has obtained GBRC performance certification.

To ensure the safety and durability of architectural structures, ground reinforcement work based on objective technical evidence is essential. The Cross Wing Column Method (CWC Method) developed by Geotech Co., Ltd. is a highly reliable deep mixing treatment method that has obtained the GBRC performance certification (No. 12-17 Rev. 1) from the Japan Building Disaster Prevention Association. The patented intersecting six-blade mixing wings efficiently and forcibly mix the local soil with cement slurry, forming high-quality columns that are not affected by soil quality. It can accommodate sandy soils, clayey soils, and loam layers, adapting to a wide range of design conditions with public evidence, including design strength standards of 400 to 1500 kN/m² and a maximum improvement length of 22 m (12 m for small-scale projects). Additionally, for small-scale buildings, the omission of mixing tests and inspection method A using mold cores are permitted, ensuring quality at a third-party certification level while keeping costs and construction periods down. Geotech provides reliable ground reinforcement under strict QMS management, facilitating smooth building confirmation applications. Please feel free to contact us.

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Constructing high-strength piles with the Pure Pile method that are unaffected by soil conditions.

We propose the Pure Pile method, which forms pile-like reinforcement using high-strength cement milk without mixing with local soil, preventing any influence from soil conditions and avoiding differential settlement.

To ensure the structural safety of buildings over a long period, it is essential to accurately analyze the characteristics of the local ground and to carry out appropriate ground reinforcement work to prevent uneven settlement. The Pure Pile method proposed by Geotech Co., Ltd. is an innovative ground reinforcement technology that constructs pile-like reinforcement bodies by directly replacing the ground with high-strength cement milk while expanding the ground laterally using a conical excavation head. Because it uses a 100% cement milk structure without mixing with local soil, it is unaffected by soil quality in diverse ground conditions, including humus layers, and can consistently demonstrate the planned high strength and quality. By evenly distributing a large number of reinforcement bodies with a design pile diameter of 20 cm, it supports the building load in a balanced manner across the surface, achieving high vertical bearing capacity and effectively eliminating the risk of settlement accidents in structures. Additionally, due to the construction structure that generates almost no residual soil, it reduces the costs of transporting and disposing of leftover soil from the site. At Geotech, under an ISO-certified quality management system, specialized construction technicians thoroughly manage real-time data to provide reliable and trustworthy foundation reinforcement.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work | Achieving reduction of leftover soil and total cost reduction with the Pure Pile method.

Significantly reduce disposal costs with a no-excavation structure that minimizes the generation of excess soil. Geotech proposes the Pure Pile method, which balances high load-bearing capacity and excellent economic efficiency.

To prevent building differential settlement accidents and ensure long-term structural stability, prior ground analysis and appropriate ground reinforcement work are essential. The Pure Pile Method proposed by Geotech Co., Ltd. is an environmentally friendly foundation reinforcement technology that directly constructs pure pile bodies underground using high-strength cement milk. This method employs a construction principle that expands the ground laterally while penetrating, and the use of straight rods that do not produce excavated soil dramatically reduces the amount of residual soil generated on-site. By minimizing the occurrence of residual soil removal work and disposal costs, significant total cost reductions are achieved. Additionally, since it does not mix with locally generated soil, it is unaffected by soil quality, ensuring high support performance even in humus-rich ground. By designing a balanced arrangement of numerous small-diameter reinforcement bodies with a design pile diameter of 20 cm, it disperses the building load and eliminates the risk of differential settlement in advance. Geotech provides safe and high-quality construction under a strict construction management system certified by ISO, recording on-site data in real time.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement using CWC method for residential buildings | Geotech

Visualizing construction data and ground reinforcement work that supports the long-term asset value of apartment buildings.

In the operation of residential complexes, ensuring the safety of buildings and maintaining asset value are extremely important. To reduce the risk of uneven ground subsidence and ensure the long-term stability of buildings, a management system that can objectively demonstrate construction quality is essential. If construction records are unclear, it may affect future repair plans and asset value assessments. GeoTech Co., Ltd.'s CWC method provides accurate data that supports the acquisition of bearing capacity as designed through digital visualization of construction management, offering reliable ground guarantees. 【Usage Scenarios】 - Foundation ground reinforcement for newly constructed residential complexes - Ensuring ground safety aimed at maintaining long-term asset value - Large-scale construction projects requiring traceability 【Benefits of Implementation】 - Objective quality assurance through automatic measurement and storage of all construction data - Reliable ground reinforcement using methods that obtain GBRC performance certification - Smooth application of ground guarantee insurance for risk management

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation reinforcement using the Geo Column method for commercial facilities | Geotech

Ensure reliable quality control for large-scale foundations of commercial facilities through the visualization of construction data.

In large-scale buildings such as commercial facilities, it is essential to objectively and rigorously manage the quality of the ground improvement body to ensure long-term safety. Proving the construction quality underground, which is not visible, directly relates to maintaining the reliability of the facility. The Geo-Column method supports the construction of a reliable foundation by demonstrating the establishment of the support layer and the formation of a homogeneous improvement body according to design through real-time data collection using automated management measurement devices. 【Usage Scenarios】 - Ground reinforcement during the construction of large commercial facilities - Construction of foundation slabs requiring high bearing capacity - Projects that require objective proof of construction quality 【Benefits of Implementation】 - Ensured transparency of quality through real-time visualization of construction data - Reliable establishment of support layers based on numerical data - Long-term traceability maintained through electronic storage

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement using the Pure Pile method for residential construction | Geotech

We prevent uneven settlement of houses with high-strength cement milk replacement piles that are not affected by soil conditions.

In residential construction sites, it is essential to accurately assess the ground bearing capacity and implement appropriate reinforcement work to prevent differential settlement, in order to maintain the safety of the building over the long term. Depending on the nature of the ground, traditional mixing methods may pose a risk of quality variation, making it challenging to ensure stable support strength. The Pure Pile method is chosen as a solution to reduce the risk of settlement in homes, as it does not mix site-generated soil with cement, allowing for the formation of high-strength pile-like reinforcements as planned, unaffected by soil quality. 【Usage Scenarios】 - Ground reinforcement during the construction of single-family homes - Measures against differential settlement in diverse ground conditions such as humus layers - Construction sites looking to reduce soil disposal costs - Small-scale buildings with three stories or fewer and a total floor area of less than 1,500 square meters 【Benefits of Implementation】 - High quality stability with 100% cement milk replacement piles - Reduction of site burden and costs by minimizing generated soil - Distributed support of building loads through evenly spaced piles with a design diameter of 20 cm - Assurance provided by technology that has obtained GBRC performance certification

  • Ground improvement
  • Ground foundation construction method
  • Pile and foundation work
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Must-see in the Tohoku Region! Construction Examples: Seismic Reinforcement and Cross-Section Restoration - Tohoku Region Construction Case Studies

- Achieving reduced construction costs and extending the lifespan of structures - We will introduce examples of seismic reinforcement and cross-section repair work in the Tohoku region!

At Tachi Construction Co., Ltd., we implement the "Dry Spray Seismic Reinforcement Method," which achieves high-speed and high-quality construction, and the "Polymer Cement Dry Spray Method," which is optimal for the repair of concrete structures. In the "Seismic Reinforcement and Cross-Section Repair Case Studies in the Tohoku Region," we introduce examples of our methods applied in the Tohoku area. [Case Studies] ■ Ohtani Bridge Old Bridge (Miyagi Prefecture Civil Engineering Heritage) - Completed in October 2013 - Dry spray cross-section repair work (NETIS method) - Total quantity: 2100m2, 432t - Tohoku Regional Development Bureau, Sendai River and National Highway Office, National Route 47 *We can respond quickly to inquiries from the six prefectures in the Tohoku area. (Aomori, Iwate, Miyagi, Akita, Yamagata, Fukushima) *For more details, please refer to our catalog or feel free to contact us.

  • Bridge Construction
  • Earthquake-resistant construction method
  • Renovation and repair methods
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Ground School】Session 5: Things to Be Careful About When Choosing Land Freely (1)

How to investigate land disaster risks and natural disaster risks! How to utilize the researched disaster risks?

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration between ground consultants (represented by Blue Sage Co., Ltd.) and Earth Relations. In the fifth session, we will clearly explain "Things to be careful about when choosing land freely (1)" through a PowerPoint video. We will introduce how to investigate land disaster risks and natural disaster risks. For more details, please refer to the related link. [Key Points] 1. Types of land disaster risks 2. How to investigate natural disaster risks 3. Liquefaction countermeasures *For more information, please check the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[ER Ground Improvement Seminar] Session 7: What is Ground Reinforcement Anyway?

Deepening understanding of ground reinforcement work! Tips for selecting construction methods (comparison estimates) will also be introduced!

The ER Ground Seminar is a ground course aimed at small-scale buildings, delivered in collaboration with a ground consultant (representative of Blue Sage) and Earth Relations. In the 7th session, we will clearly explain "What is ground reinforcement?" through a PowerPoint video. We will discuss "There are terrains and soils that are unsuitable for ground reinforcement methods" and "The unsuitable terrains and soils differ by method." [Key Points of the Discussion] 1. Ground reinforcement is not piling. 2. Types of methods. 3. Method selection based on terrain and soil (visualization). *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Foundation Seminar】Session 9: Selecting Reinforcement Methods to Prevent House Tilting

Learn about ground reinforcement methods based on land conditions! An explanation of land conditions that are prone to differential settlement accidents!

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration with a ground consultant (representative of Blue Sage Co., Ltd.) and Earth Relations. In the 9th session, we will clearly explain "Selecting Reinforcement Methods to Prevent House Tilting" through a PowerPoint video. We will discuss "Land Conditions Prone to Differential Settlement Accidents" and "Considerations for Selecting Methods Based on Each Land Condition." [Key Points of Discussion] 1. Land Conditions Prone to Differential Settlement Accidents - Confirming examples of causes of differential settlement 2. Considerations for Selecting Methods Based on Each Land Condition - Reasons why caution is needed for certain lands - Key points for method selection *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Ground School】 Session 12: Summary of Residential Ground

Simple checkpoints to prevent sinking accidents! The priority in ground examination is "consideration to avoid tilting the house"!

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration with a ground consultant (represented by Blue Sage Co., Ltd.) and Earth Relations. In the 12th session, we provide a clear explanation of "Summary of Residential Ground" through a PowerPoint video. We summarize simple checkpoints to prevent differential settlement accidents. [Key Points] ■1. Topography ■2. Ground investigation data ■3. Ground reinforcement estimates (selection of reinforcement methods) ■4. Ground insurance and guarantees *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Submergence correction work | Strongly supporting the longevity of wooden houses with carbon fiber foundation regeneration method.

No need for demolition, perfect for renovation sites! Proposing a method for extending the lifespan of wooden houses and improving construction efficiency through carbon fiber foundation regeneration and subsidence correction work.

This catalog proposes the "Carbon Fiber Foundation Restoration Method" and ground subsidence correction solutions, which demonstrate significant effectiveness during large-scale renovations and seismic retrofitting of existing homes, aimed at contractors, house manufacturers, and renovation businesses. By closely applying carbon fiber sheets, which have ten times the tensile strength of steel, to the existing foundation structure while concurrently conducting seismic retrofitting of the superstructure, we can significantly restore and enhance the bending strength and shear resistance of the foundation without the need for demolition or additional construction. Additionally, for issues such as uneven subsidence of the ground or tilting of the house discovered during on-site surveys, we combine high-precision subsidence correction work using small hydraulic jacks and steel pipe pile driving to accurately level the structure to the millimeter and prevent re-subsidence. Our compact construction system, which does not require heavy machinery, allows for smooth completion even in narrow sites or occupied locations, minimizing the occurrence of additional construction periods and cost increases. With reliable technical evidence and ground warranty support, we strongly assist in gaining the trust of clients and improving order rates.

  • Renovation and repair methods
  • Pile and foundation work
  • Other earthworks, foundation works, and exterior floors
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Subsurface correction work | Carbon fiber foundation regeneration method for earthquake-resistant and long-lasting homes

Protect your home from the shaking of massive earthquakes! Achieve long-lasting wooden houses and overwhelming seismic performance through the powerful combination of carbon fiber foundation regeneration methods and subsidence correction.

This catalog is a technical proposal introducing the "Carbon Fiber Foundation Rehabilitation Method" and ground subsidence correction solutions that respond to disaster prevention measures and seismic reinforcement needs for the massive earthquakes anticipated in the future, while simultaneously achieving the longevity of wooden houses and the strengthening of their foundational structures. By adhering and integrally molding carbon fiber sheets, which boast over ten times the tensile strength of steel, with high-adhesion epoxy resin to existing foundation concrete that has developed cracks due to aging and differential settlement, we dramatically enhance the shear resistance and toughness of the foundation without the need for demolition or additional pouring. Furthermore, for the tilting of houses caused by ground differential settlement, we apply high-precision jack-up construction using steel pipe piles and pressure plates, accurately leveling the structure to the millimeter and securely anchoring it to deep supporting layers. The objective effectiveness has been proven through full-scale strength tests conducted by public institutions, providing overwhelming reliability and assured structural safety for resolving foundation nonconformities identified in seismic assessments and enhancing disaster prevention functions during renovations.

  • Renovation and repair methods
  • Residential foundations
  • Consulting companies
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【リフォーム・増改築向け】基礎補強工事システム がんこおやじ

無筋・割れ基礎を新築以上に甦らせる炭素繊維補強システム

リフォーム・増改築においては、既存建物の構造的な安定性と長期的な耐久性が求められます。特に基礎部分は建物を支える要であり、劣化やひび割れが生じている場合、建物の安全性に影響を与える可能性があります。従来の補修方法では、一時的な対応に留まったり、建物の重量や工期、コストに課題が生じることがありました。当社「沈下修正工事 基礎補強工事システム がんこおやじ」は、一般財団法人日本建築防災協会の住宅等防災技術評価および実用新案登録を取得した、既存コンクリート布基礎向けの炭素繊維補強システムです。高強度の炭素繊維シートを基礎表面に強固に接着させることで、基礎のせん断強度、靭性能、耐震性を向上させ、無筋基礎や劣化クラックが生じた既存基礎であっても、構造物の重量や断面を大きく変えずに、新築時以上の頑強な支持構造へと甦らせます。 【活用シーン】 ・築年数の経過した住宅のリフォーム ・増改築に伴う基礎の補強 ・基礎にひび割れや劣化が見られる場合 ・耐震性向上を目的とした改修 【導入の効果】 ・基礎の強度と耐久性の向上 ・建物の耐震性の強化 ・長期的な安心感の提供 ・構造物の重量や断面を大きく変えずに補強可能

  • Renovation and repair methods
  • Residential foundations
  • Other earthworks, foundation works, and exterior floors
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Investigation | A Smart Foundation Specification Explanation Method to Eliminate Excess Piles in Single-Story Logistics Warehouses

Elimination of excessive piles in single-story logistics warehouses! By changing to direct foundations using shallow soil bearing capacity data from plate load tests, we smartly achieve cost reduction and the client's satisfaction.

In the construction plan for single-story logistics warehouses, the designation of expensive deep pile foundations or columnar improvements due to the underestimation of safety factors is a significant issue that severely pressures construction costs. This document explains a smart foundation explanation technique using "plate load tests" to measure the true bearing capacity of the shallow ground directly beneath the foundation and eliminate excessive ground reinforcement work. Geotech's plate load tests directly measure the ultimate bearing capacity and deformation coefficients at the actual pressure surface level, scientifically supporting design changes to direct foundations such as slab foundations. High-precision settlement simulations based on staged loading data prevent the risk of unevenness and settlement of the floor slab associated with forklift operations and the installation of high-rise racks. Furthermore, the eco-foundation proposal, which minimizes the generation of excavation spoil, also contributes to CO2 emission reduction. By presenting clear technical evidence, we fulfill the requirements for structural compatibility assessment and accountability to clients, strongly supporting significant cost reductions and shortened construction periods. We encourage you to utilize this document to achieve a highly satisfactory optimal foundation design.

  • ボーリング.jpg
  • Site and ground investigation
  • Geological Survey Company
  • Geological Survey
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work | Achieving reliable trust with public evaluation and performance certification through the RES-P method.

Obtain public evaluation and performance certification! Ground reinforcement RES-P method that supports buildings for a long time based on clear design standards such as evaluations from the Japan Building Center.

To ensure the structural safety of newly constructed buildings over the long term, reliable ground reinforcement work is essential. Uneven settlement due to insufficient ground bearing capacity can cause cracks in exterior walls and tilting of the building, significantly reducing asset value. The RES-P method, a piled raft foundation construction method, provides extremely high structural reliability to address these issues. This method has obtained architectural technical performance certification from the General Incorporated Foundation Japan Building Disaster Prevention Association (GBRC Performance Certification No. 04-02) and evaluation from the Japan Building Center (BCJ-F872), allowing for reinforcement design based on clear calculation standards recognized by public institutions. By improving the bearing capacity beneath the foundation through the combined effects of slender steel pipes and the ground, it can be adapted to strip foundations and mat foundations without special foundation structural reinforcement. As it employs a non-dredging penetration method that does not use cement-based solidifying agents, it reduces the cost of disposing of excess soil while keeping the site environment clean. GeoTech Co., Ltd. offers absolute peace of mind to clients through thorough quality control and data assurance systems using construction management devices.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Reinforcement work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration