Reinforcement work Product List and Ranking from 26 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Nov 12, 2025~Dec 09, 2025
This ranking is based on the number of page views on our site.

Reinforcement work Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Nov 12, 2025~Dec 09, 2025
This ranking is based on the number of page views on our site.

  1. センクシア 東京支店、札幌支店、東北支店、関東支店、北陸支店、中部支店、関西支店、中四国支店、九州支店 Tokyo//Building materials, supplies and fixtures manufacturers
  2. 木材保存センター Tokyo//Service Industry
  3. 地研テクノ Kanagawa//Construction Consultant
  4. 4 オリエンタル白石 本社 Tokyo//General contractors and subcontractors
  5. 5 基土木 Okinawa//Other construction industries

Reinforcement work Product ranking

Last Updated: Aggregation Period:Nov 12, 2025~Dec 09, 2025
This ranking is based on the number of page views on our site.

  1. If you are struggling with seismic reinforcement of steel structures, contact Senkushia for total support. センクシア 東京支店、札幌支店、東北支店、関東支店、北陸支店、中部支店、関西支店、中四国支店、九州支店
  2. Foundation reinforcement work using aramid fibers and carbon fiber sheets. 木材保存センター
  3. Ground reinforcement construction "Kanbei Raft Method" 地研テクノ
  4. Oriental Shiraishi Technology Introduction オリエンタル白石 本社
  5. 4 Ground reinforcement work "Daku Pile Method (Small Diameter Steel Pipe Piles)" 基土木

Reinforcement work Product List

31~44 item / All 44 items

Displayed results

[Information] Unable to take the step towards seismic reinforcement! <For ryokan and hotel owners>

We will realize a seismic retrofitting solution that satisfies our customers in a one-stop manner!

This document introduces the "RE・do Diagnosis," which can be conducted at a lower cost than standard seismic assessments, aimed at owners of ryokans and hotels. It includes information on the process leading up to seismic reinforcement work, as well as details about "BESTMIX," along with examples from hotels and office buildings. We also assist in alleviating concerns regarding financial aspects. If you have felt uneasy about your building due to recent earthquakes, are interested in seismic measures, or own an older seismic property, please take a moment to read this. 【Contents (partial)】 ■ Especially recommended for those with these concerns! ■ RE・do Diagnosis (Understand the current seismic performance and reinforcement details at a low cost, and calculate construction costs along with design fees) ■ Process leading to seismic reinforcement work ■ What is the suitable construction method proposal BESTMIX? ■ Proposal for services to cover diagnostic and construction costs ■ Adding value through renovation *For more details, please refer to the PDF document or feel free to contact us.

  • Vibration isolation, vibration control, and earthquake resistance construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We are currently accepting consultations regarding the seismic retrofitting of buildings along the emergency transport roads in Saitama City!

Are you having trouble choosing a contractor for the mandatory seismic diagnosis? Leave it to us, a company that has specialized in seismic business for 30 years!

In light of the mandatory seismic assessments for buildings along the emergency transport routes in Saitama City, Keyman Co., Ltd. is available for consultations regarding seismic assessments and reinforcement construction! - I know the assessment is mandatory, but I don't know where to start. - I'm worried about how much it will cost. - Will it fit within the scope of subsidies? Please feel free to contact us with any concerns, no matter how small! Our company has been in business for 30 years, specializing in seismic projects. We have numerous achievements in assessments, construction, and subsidy application procedures. Of course, we also have a track record within Saitama City! While the assessment has now become mandatory, there may be cases where construction is necessary afterward. With our company, we can support owners through a consistent system from assessment to construction and execution. We have materials on our seismic assessments in our product catalog, so please take a look!

  • Structural Survey

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work "Daku Pile Method (Small Diameter Steel Pipe Piles)"

Developing weak ground! A ground reinforcement construction method with high performance evaluation, featuring low vibration and low noise.

The "Dacpile Method (Small Diameter Foundation Steel Pipe Piles)" utilizes high-strength, corrosion-resistant Dacpile pipes and incorporates the miniaturization of heavy machinery, enabling construction in difficult-to-access locations and narrow sites for ground reinforcement work. Dacpile features an integrally formed tip blade and pile body, possessing robust and uniform material strength throughout all parts. Additionally, the enlarged base effect of the tip blade allows for significant vertical load-bearing capacity due to the increased blade area. 【Features】 ■ Adoption of high-strength, corrosion-resistant Dacpile pipes ■ Realization of no-welding on-site ■ 10-year construction warranty *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco-friendly measures: "Heat prevention construction" "Roof reinforcement construction" *Case studies available.

Improving the work environment, restoring the strength and aesthetics of the roof, and solving factory challenges such as energy conservation. Numerous achievements.

Our company specializes in "heat prevention construction" using heat-insulating sheets and special coatings, as well as "roof reinforcement construction." We solve concerns such as "the workspace is hot due to equipment heat dissipation," "I want to repair the roof at a low cost," and "I want to reduce electricity costs." We contribute to improving factory environments and reducing running costs. 【Heat Prevention with Heat-Insulating Sheets】 - Heat prevention for equipment that generates heat, such as heaters, molding machines, and furnaces is possible. - It suppresses the rise in room temperature and reduces energy costs. - Proven results in drying furnaces at automotive parts factories. 【Reinforcement and Insulation of Slate Roofs with Special Coatings】 - Reinforcement and heat insulation are achieved by applying three layers of special coatings. - Strengthening roofs according to requests, including rust resistance, weather resistance, and color. - There are cases where the strength of aging slate increased by about 30%. - Construction can be carried out without stopping factory operations. *We are currently offering materials with construction case studies! You can view them from "PDF Download." Please feel free to contact us.

  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work "Columnar Improvement Method"

The improved ground can maintain the strength to support the building for a long time!

The "Columnar Improvement Method" involves injecting cement milk into stable ground, compacting the soil into columnar shapes using machinery, and then constructing a foundation on top of it. Columns made of a cement-based solidifying agent (soil improvement cement) mixed with soil, referred to as columns, are created within the ground. By selecting the appropriate soil hardening agent, this method can accommodate improvement work for various soil types, including clay and sand. 【Process】 ■ Using specialized construction machinery, excavate to the planned depth while injecting the cement-based solidifying agent. ■ Reverse the construction machinery to mix the soil and cement-based solidifying agent. ■ Raise and lower the pit of the construction machinery to mix the entire area. ■ Completion is achieved once the material is fully solidified. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • Site and ground investigation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We will carry out tunnel repair and reinforcement work, including investigation, proposal, management, and construction.

It has been 20 years since we started repairing tunnels, bridges, and rivers. As a subcontractor, we have managed and executed many construction projects. First, we will provide an estimate.

We have conducted numerous management and construction projects to date. List of Tunnel Construction ● Interior Reinforcement Measures Various Continuous Fiber Sheets Reinforced Fiber Embedded Panels Copper Plates and Strips Rock Bolts Cross-Section Repair ● Back Void Measures Rigid Foam Polyurethane (12 to 40 times) Various Air Mortars ● Crack Measures Organic Materials (Injection of Epoxy, Acrylic, Polyurethane, etc.) Inorganic Materials (Injection of Ultra-Fine Particle Cement, Silicate, etc.) ● Water Leakage Measures Line and Surface Water Guidance Back Injection Drainage Boring System For other repair methods and inquiries, please contact us.

  • Tunnel construction
  • Bridge Construction
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We will carry out bridge repair and reinforcement work, including "investigation, proposal, management, and construction."

It has been 20 years since we started repairing bridges, tunnels, and rivers. As a subcontractor, we have managed and executed many projects. First, we will provide an estimate.

We have conducted numerous management and construction projects to date. List of Bridge Repair and Reinforcement Works Reinforcement ● Upper Side Carbon Fiber Sheets Lead Lines (CF Rebar) CFRP Plates (e-plates) ● Lower Side Carbon Fiber Sheets Lead Lines (CF Rebar) CFRP Plates (e-plates) Steel Plates ● Side (Girders) Out Plates Out Cables Additionally, we also undertake construction related to repairs. Please contact us for inquiries.

  • Bridge Construction
  • Renovation and repair methods
  • Tunnel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement work

Improving endurance and rigidity! We will conduct an investigation for seismic reinforcement work.

Our company handles seismic reinforcement construction. The brace method allows for the completion of seismic reinforcement work by attaching braces to the column-beam frame of reinforced concrete or steel-reinforced concrete buildings. The concrete wall seismic method improves strength and rigidity by increasing the thickness of existing walls or adding reinforced concrete walls to openings. 【Features】 ■ Brace Method ■ Concrete Wall Seismic Method *For more details, please refer to the related links or feel free to contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation reinforcement work using aramid fibers and carbon fiber sheets.

A worry-free home building that knows no cracks.

Construction Process 1. Current Condition Survey and Diagnosis Check for cracks, subsidence, and reduction in strength, and develop a reinforcement plan. 2. Surface Preparation Remove dirt and deteriorated areas from the concrete surface (grinding) and perform treatment (Teflon TW-1P) to improve adhesion. 3. Application of Aramid and Carbon Fiber Sheets Adhere the fiber sheets to the foundation using epoxy resin (New Teflon TC-4101). 4. Epoxy Resin Impregnation and Curing Allow the resin to penetrate, solidify the sheets, and promote integration with the concrete.

  • Residential foundations

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Must-see in the Tohoku Region! Construction Examples: Seismic Reinforcement and Cross-Section Restoration - Tohoku Region Construction Case Studies

- Achieving reduced construction costs and extending the lifespan of structures - We will introduce examples of seismic reinforcement and cross-section repair work in the Tohoku region!

At Tachi Construction Co., Ltd., we implement the "Dry Spray Seismic Reinforcement Method," which achieves high-speed and high-quality construction, and the "Polymer Cement Dry Spray Method," which is optimal for the repair of concrete structures. In the "Seismic Reinforcement and Cross-Section Repair Case Studies in the Tohoku Region," we introduce examples of our methods applied in the Tohoku area. [Case Studies] ■ Ohtani Bridge Old Bridge (Miyagi Prefecture Civil Engineering Heritage) - Completed in October 2013 - Dry spray cross-section repair work (NETIS method) - Total quantity: 2100m2, 432t - Tohoku Regional Development Bureau, Sendai River and National Highway Office, National Route 47 *We can respond quickly to inquiries from the six prefectures in the Tohoku area. (Aomori, Iwate, Miyagi, Akita, Yamagata, Fukushima) *For more details, please refer to our catalog or feel free to contact us.

  • Bridge Construction
  • Earthquake-resistant construction method
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Ground School】Session 5: Things to Be Careful About When Choosing Land Freely (1)

How to investigate land disaster risks and natural disaster risks! How to utilize the researched disaster risks?

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration between ground consultants (represented by Blue Sage Co., Ltd.) and Earth Relations. In the fifth session, we will clearly explain "Things to be careful about when choosing land freely (1)" through a PowerPoint video. We will introduce how to investigate land disaster risks and natural disaster risks. For more details, please refer to the related link. [Key Points] 1. Types of land disaster risks 2. How to investigate natural disaster risks 3. Liquefaction countermeasures *For more information, please check the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[ER Ground Improvement Seminar] Session 7: What is Ground Reinforcement Anyway?

Deepening understanding of ground reinforcement work! Tips for selecting construction methods (comparison estimates) will also be introduced!

The ER Ground Seminar is a ground course aimed at small-scale buildings, delivered in collaboration with a ground consultant (representative of Blue Sage) and Earth Relations. In the 7th session, we will clearly explain "What is ground reinforcement?" through a PowerPoint video. We will discuss "There are terrains and soils that are unsuitable for ground reinforcement methods" and "The unsuitable terrains and soils differ by method." [Key Points of the Discussion] 1. Ground reinforcement is not piling. 2. Types of methods. 3. Method selection based on terrain and soil (visualization). *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Foundation Seminar】Session 9: Selecting Reinforcement Methods to Prevent House Tilting

Learn about ground reinforcement methods based on land conditions! An explanation of land conditions that are prone to differential settlement accidents!

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration with a ground consultant (representative of Blue Sage Co., Ltd.) and Earth Relations. In the 9th session, we will clearly explain "Selecting Reinforcement Methods to Prevent House Tilting" through a PowerPoint video. We will discuss "Land Conditions Prone to Differential Settlement Accidents" and "Considerations for Selecting Methods Based on Each Land Condition." [Key Points of Discussion] 1. Land Conditions Prone to Differential Settlement Accidents - Confirming examples of causes of differential settlement 2. Considerations for Selecting Methods Based on Each Land Condition - Reasons why caution is needed for certain lands - Key points for method selection *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【ER Ground School】 Session 12: Summary of Residential Ground

Simple checkpoints to prevent sinking accidents! The priority in ground examination is "consideration to avoid tilting the house"!

The ER Ground School is a ground course for small-scale buildings, delivered in collaboration with a ground consultant (represented by Blue Sage Co., Ltd.) and Earth Relations. In the 12th session, we provide a clear explanation of "Summary of Residential Ground" through a PowerPoint video. We summarize simple checkpoints to prevent differential settlement accidents. [Key Points] ■1. Topography ■2. Ground investigation data ■3. Ground reinforcement estimates (selection of reinforcement methods) ■4. Ground insurance and guarantees *For more details, please refer to the related link page or feel free to contact us.

  • Ground foundation construction method
  • Site and ground investigation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration