Construction method Product List and Ranking from 1584 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Jun 10, 2026~Jul 07, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jun 10, 2026~Jul 07, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  3. 大建工業 Tokyo//Building materials, supplies and fixtures manufacturers
  4. 4 エコ・24 本社 Kanagawa//Other construction industries
  5. 5 昭石化工 Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Jun 10, 2026~Jul 07, 2026
This ranking is based on the number of page views on our site.

  1. 煙突に対するアスベスト封じ込め工法『CAS工法』 エコ・24 本社
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' SUIKEN Co., LTD
  3. D-Lite D Board Method ~ 3M × DAIKEN ~ 大建工業
  4. 4 For deep excavation work and cutting/removal of underground obstacles! Super Top Method. Taiyo Kisokogyo Co.,Ltd.
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

1531~1560 item / All 4309 items

Displayed results

TES method

Thoroughly decompose, clean, and disinfect dirt such as oil, resin, and wood stains, including those from industrial sources!

The "TES Method" is a technique that penetrates special cleaning agents into materials such as walls and wood to kill mold, remove it from the source, and eradicate it completely. It restores without damaging the building, discoloring the paint, or harming the wood. It decomposes mold and dirt inside and outside buildings from the root, maintaining aesthetics with antibacterial, antifungal, and waterproof effects. 【Features】 ■ Easy and speedy construction ■ No scaffolding required ■ Achieves low cost ■ Long-lasting effects ■ Safe and secure for both humans and nature *For more details, please download the PDF or feel free to contact us.

  • Housing structure technology/long-term superior housing technology
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil retaining member pull-out simultaneous filling method

A unique method for safely retrieving steel sheet piles and similar materials in proximity construction and levee work.

When performing temporary earth retention in soft ground, the extraction of steel sheet piles can significantly impact nearby houses and buried utilities, leading to many cases where they are left in place. Additionally, in the construction of reservoirs and river embankments, the risk of embankment failure during floods caused by water channels created during extraction is a concern. This method has accumulated approximately 200 successful cases as a solution to these issues. A new technology has been patented and registered with NETIS, which involves filling the voids created during extraction with a special filling material simultaneously as the steel sheet piles are pulled out. This helps prevent business losses and reduces costs.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hollow Slab "I.L.C. Void"

A specialist in slabs that support the foundation of buildings.

Our company has independently developed the hollow slab "I.L.C. Void," which satisfies high strength, sound insulation, workability, and all of these performance requirements. In addition to its performance, it has received high praise for its ease of construction, accumulating numerous achievements in large general contractors and developers' condominiums. We at I.L.C. will continue to work on new values as a trusted specialist in hollow slabs. *For more details, please download the PDF or feel free to contact us.*

  • Other wall materials
  • Soundproofing panels
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

OEM/ODM services for wooden products.

We accept original products related to wooden items!

At Juuei Art Co., Ltd., we accept OEM and ODM (original products) based on our customers' requests. Our sales and development staff accurately compile and propose plans based on customer needs. Additionally, regarding production, we respond to customer requests at both domestic factories and overseas partner factories. Furthermore, we can handle direct shipping of the produced products to our customers. 【Product Example】 ■ Educational Furniture 'KIDS FURNITURE' *For more details, please download the PDF or feel free to contact us.

  • Other furniture
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Puzzle construction method

Introduction to a long-term corrosion protection system for steel materials using room temperature metal thermal spraying.

The Puzzle Method is a super long-lasting corrosion protection technique that dramatically enhances the corrosion resistance of sacrificial anti-corrosion metal spraying (aluminum/zinc) combined with anti-corrosion coatings. Invented in Europe about a century ago and developed in Japan as a construction technology, it integrates the metal spraying technology with over 120 years of expertise from Nippon Paint's coating technology, established with the desire to "protect steel materials, the backbone of civil engineering and construction, across centuries." 【Goals of the Puzzle Method】 ■ Improvement of expected service life for corrosion resistance ■ Reduction of LCC (Life Cycle Cost) ■ Enhancement and generalization of maintenance technology ■ Gaining trust in steel materials *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil Retention Fence "GE-80T Series"

We have steel pipe piles available in sizes ranging from "H=400" to "H=1200"!

We would like to introduce the "GE-80T Series" of soil retaining fences that we handle. This is a steel pipe pile type. We offer a wide range of options including "H=400", "H=600", "H=800", "H=1000", and "H=1200". Please feel free to consult us when you need assistance. 【Partial Lineup】 ■H=400 ・GE-D8004W-20B ・GE-D8004E-20B ■H=600 ・GE-D8006W-20B ・GE-D8006E-20B *For more details, please refer to the PDF document or feel free to contact us.

  • Gates, walls and fences
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sewer cleaning service

For sewer cleaning, leave it to us.

Our company performs sewer pipe cleaning. Accumulated soil and grease that reduce flow capacity can sometimes produce unpleasant odors and toxic gases, negatively impacting the lives of citizens. Therefore, regular cleaning of sewer pipes is necessary. The cleaning is typically done using a combination of high-pressure cleaning vehicles, powerful suction vehicles, and water supply vehicles. Pressurized water is ejected from nozzles of the high-pressure cleaner to wash away soil and other debris, which is then vacuumed up by the suction vehicle. 【Business Activities】 1. Cleaning of sewer pipes and roadside ditches 2. TV inspection and repair work inside sewer pipes 3. Removal of foreign objects from sewer pipes and pipe rehabilitation work 4. Dredging of lakes and ponds 5. Cleaning of various building pits 6. Transportation of construction sludge water 7. Comprehensive management of water storage tanks 8. Water and sewage construction and air conditioning equipment installation 9. Civil engineering work 10. Interior finishing work 11. Telecommunications work 12. Comprehensive building maintenance 13. Collection and transportation of industrial waste 14. Environmental maintenance and conservation services *For more details, please download the PDF or feel free to contact us.

  • cleaning
  • Sewerage facilities
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TBH Hangong Method

It is possible to carry out large-diameter excavation quickly and easily under narrow and low space construction conditions!

The "TBH Piling Method" is a technique that enables large-diameter boring using "reverse circulation," in contrast to the BH method, which operates on a positive circulation basis. It also resolves the issue of slime sedimentation that occurs with positive circulation drilling methods, allowing for reliable management and construction. In recent years, it has been widely adopted for active geo-front construction, demonstrating its capabilities under conditions with low headroom, such as beneath existing structures. 【Features】 - The construction machinery is compact, making it suitable for construction on small sites. - It can be used even in low working height situations, such as under elevated structures or indoors. - It is lightweight and small, facilitating easy transportation even on narrow access roads. - No heavy machinery is required for the assembly and disassembly of the machine. - The noise and vibration levels during construction are extremely low, among other benefits. *For more details, please download the PDF or feel free to contact us.*

  • Ground foundation construction method
  • Foundation construction
  • Pile and foundation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seamless construction method, Shiroki Corporation Co., Ltd.

For roof, wall deterioration, leaks, collapses, and salt damage prevention! It adheres tightly when sprayed, making it lightweight and durable.

The "Seamless Construction Method" is a revolutionary covering technique that revitalizes roofs and walls. Through precise substrate treatment and the spraying of 100% pure polyurethane that has high strength and ultra-fast curing, it adheres to the substrate and forms a seamless waterproof coating that sufficiently follows cracks while maintaining excellent elongation performance and strength. The high-strength adhesive coating, which does not allow water to pass through and does not tear even if the roof breaks, resembles a new roof and prevents not only leaks but also repairs for deteriorated roofs, damage and falling of aging straight roofs, and the dispersion of asbestos. 【Features】 ■ Seamless coating with adhesive type ■ Leak prevention, deterioration repair, roof material reinforcement ■ Consistent responsibility in construction from substrate treatment to finishing ■ Measures against roof and wall collapse and soundproofing from rain noise *For more details, please refer to the PDF materials or feel free to contact us.

  • Heat-insulating paint for exterior walls (roofs, rooftops, etc.)
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seamless construction method <Responsible construction for peace of mind and safety> Shiroki Corporation

Seamless waterproof coating that adheres well for metal roofs, exposed waterproofing (flat roofs), parking lots, and more!

The "Seamless Construction Method" is a revolutionary restoration cover method that revitalizes roofs and walls. The waterproofing material used in this method is 100% pure urethane, which is high-strength, cures very quickly, and has excellent toughness and abrasion resistance as a urethane rubber-based coating waterproofing material. It does not use solvents, so there is no volume shrinkage due to curing and drying, allowing for a stable waterproof layer to be formed without applying excessive force between the substrate and the wide area. 【Features】 ■ Seamless waterproof coating that adheres tightly ■ Strengthens roofing materials to prevent damage from deterioration and disasters ■ Easy repairs after construction ■ Consistent responsibility in construction from substrate treatment to finishing ■ Performance of high-strength ultra-fast curing urethane and rubber-asphalt composite coating waterproofing *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Rehabilitation of Sewer Manholes

Introducing case studies aimed at the rehabilitation of manholes affected by hydrogen sulfide corrosion.

We would like to introduce a case where "D-Hole (Docking Hole)" was implemented for the rehabilitation of sewer manholes. In the Water and Sewerage Department of the Yakage Town Hall in Okayama Prefecture, measures were being taken for areas where hydrogen sulfide corrosion was significantly advanced. This time, they adopted the D-Hole using the "Cassette Method," which is gaining attention as a new construction method. [Evaluation] ■ Although it was the first adoption, a certain level of effectiveness was confirmed in terms of method, construction period, and cost, so they expressed a positive intention to consider further adoption in the future. *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pulping method "ANCP method"

We provide the entire ANCP equipment capable of pulp production at the raw material generation site (on-site)!

The "ANCP method" is a pulping process that uses a new type of vertical special high-concentration pulper for cooking, achieving energy savings, cost reduction, and high efficiency compared to digesters and cooking vessels. Since it only uses two types of common industrial chemicals, pulp production can be done at the raw material generation site (on-site). 【Features】 ■ High efficiency ■ Compact ■ Wide adaptability of raw materials ■ High whiteness of unbleached pulp ■ Capable of producing high-purity DP *For more details, please download the PDF or feel free to contact us.

  • Other construction services
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP Special Coating Method (R)

We will achieve the long lifespan of factory structural components through coating.

Our company offers a special FRP coating method (R) that combines the strengths derived from GFRP material forms with the proven functionality of corrosion-resistant resins as a role of paint. By combining glass fibers and corrosion-resistant resins in an appropriate material composition, we achieve high corrosion resistance. Please feel free to contact us if you have any requests. 【Features】 ■ Sealing the "interface of fibers/resins near the surface" that is prone to acid penetration with a top coat ■ Suppression of acid penetration by glass fibers and improvement of the strength of the coating itself *For more details, please download the PDF or feel free to contact us.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of materials for removable insulation covers: heat-resistant fibers.

We will introduce the materials and components for removable thermal insulation covers, highlighting their heat resistance temperatures and characteristics.

We would like to introduce materials and substances for insulation covers. 【Features】 ■ Glass cloth products - Heat resistance temperature is approximately 300 to 500℃ - Possesses thermal properties, electrical insulation, and dimensional stability ■ Silica glass products (silica fiber) - Heat resistance temperature is 1000℃ - Capable of continuous use at high temperatures for long periods, even at 1000℃ - Excellent thermal durability, chemical stability, and electrical insulation ■ Alumina products - Heat resistance temperature is 1200℃ - Excellent heat resistance, maintaining strength and flexibility even after heating - Superior thermal insulation, flexibility, and electrical insulation *For more details, please refer to the PDF document or feel free to contact us.

  • Piping and insulation
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior Dry Construction Method "Remule®"

A simple construction dry method for exterior walls composed of thin, lightweight tiles and aluminum rails.

Remule® is a simple dry construction method that involves attaching aluminum rails to the exterior walls of a building and fitting tiles into them. 【Features】 ● Easy Maintenance Remule® uses fired tiles and highly corrosion-resistant aluminum. Since it has almost no water absorption, you can maintain its cleanliness for a long time by simply removing dirt that adheres to the surface (depending on specific installation locations and conditions). ● Lightweight Material We have developed tiles that are made of very lightweight aluminum and are about half the thickness of standard floor tiles (10mm thick), measuring "5.5mm thick." Despite this, they meet JIS strength standards. The overall weight is light, reducing the weight burden on the building. ● Easy Installation The aluminum rails are screwed to the studs. The tiles are simply inserted into the rails with adhesive applied in parts. This leads to shortened construction periods and a relative reduction in waste, which also contributes to cost reduction. ● Safe Design Developed using the know-how we have cultivated with aluminum handrails, it can flexibly follow significant deformations of buildings due to earthquakes and has been confirmed through our own tests to withstand wind pressure from super typhoons, allowing you to use it with confidence.

  • tile
  • Other wall materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry Exterior Insulation Method "LLH Exterior Insulation Ventilation Layer System"

You can choose "Neoma Foam," the insulation material from Asahi Kasei Construction Materials, which boasts top-class thermal insulation performance! You can also choose the exterior materials.

The "LLH External Insulation Ventilation Layer System" is a dry external insulation method designed to accommodate heavy exterior materials with high stability and strength. It minimizes thermal bridges and allows for unevenness adjustments, enabling smooth construction. Exterior materials can be selected from dry tiles, aluminum panels, spandrels, Galvalume steel sheets, wooden boards, and stone. Additionally, we have newly introduced Asahi Kasei's insulation material "Neoma Foam," which boasts top-class insulation performance of 0.020 W/(m·K). Neoma Foam is made of flame-resistant phenolic resin and maintains its insulation performance over the long term. 【Features】 ■ Option to choose insulation material "Neoma Foam" with top-class insulation performance ■ Less affected by outdoor temperatures and easy unevenness adjustments ■ Numerous construction achievements in apartments, universities, hospitals, office buildings, etc. *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Heat insulation and heat shielding methods
  • Insulation work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[NETIS Registration] Integrated Method for Expansion Devices and Deck Waterproofing (AOS Method)

Improving economic efficiency in small bridges under 20 meters.

The "Integrated Method of Expansion Device and Deck Waterproofing (ARCHIST ONEPIECE-GEL SYSTEM®)" achieves a reduction in construction time and high economic efficiency by using the same asphalt emulsion-based expansion material and waterproofing material for the installation of embedded expansion devices and membrane-type deck waterproofing. This method maintains both the expansion device function and waterproofing function in bridges. *Note: ONEPIECE-GEL JOINT and ONEPIECE-GEL PROOF must be used simultaneously.* 【Features】 ■ More than 15% reduction in construction costs compared to conventional methods ■ Easy to construct at room temperature, allowing for shortened construction time ■ Passes performance verification tests for 15 years *For more details, please contact us or download the PDF to view.*

  • Renovation and repair methods
  • Bridge Materials
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We support repair design work "AOS method (NETIS registered)"

Improvement of cost-effectiveness in small bridges under 20 meters.

The "Integrated Method of Expansion Devices and Deck Waterproofing (ARCHIST ONEPIECE-GEL SYSTEM®)" achieves a reduction in construction time and high cost-effectiveness by using the same asphalt emulsion-based expansion material and waterproofing material for the installation of embedded expansion devices and membrane-type deck waterproofing. This method maintains both the expansion device function and waterproofing function in bridges. *Note: It is necessary to use ONEPIECE-GEL JOINT and ONEPIECE-GEL PROOF simultaneously. 【Features】 ■ More than 15% reduction in construction costs compared to conventional methods ■ Easy to construct at normal temperatures, allowing for shortened construction periods ■ Passes performance verification tests for 15 years *For more details, please contact us or download the PDF for further information.

  • Renovation and repair methods
  • Bridge Construction
  • Bridge Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Restoration method

Repair and regenerate damaged materials without replacing them, and reuse!

The restoration method is a technique that regenerates existing materials such as flooring and tiles without replacing them, and protects and strengthens them through special processing with coatings. Since it regenerates damaged materials without replacement, there is no waste generated. Additionally, the coating enhances protection, resulting in a longer lifespan, making it an environmentally friendly [eco] method. 【Features】 ■ Repairs and regenerates damaged materials without replacement, allowing for reuse ■ Easy maintenance, can be wiped clean with water, and is hygienic ■ No waxing required. The protective effect lasts longer than new floors *For more details, please download the PDF or contact us.

  • Flooring deterioration prevention agents (wax, etc.)
  • Housing structure technology/long-term superior housing technology
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A-class joint natural gas pressure welding "Eco Well Method"

Applied as A-class certified joints! Environmentally friendly next-generation natural gas pressure welding method.

The "EcoWell Method" is a rebar gas pressure welding technique that uses clean natural gas, contributing to reduced environmental impact and improved work safety. The gas flow adjustment and hydraulic operation of the welding process are automated, allowing for excellent quality without variations in construction. Additionally, construction data for each welding point is recorded as electronic data, which can be used for quality and construction management after the work is completed. 【Features】 ■ Environmentally friendly ■ Excellent workability and quality ■ Construction management enabled with traceability ■ Construction by certified companies ■ Management of the quality of the EcoWell gas and specialized equipment used *For more details, please contact us.

  • Fittings
  • Special Construction Method
  • Other construction services
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco-Speed Construction Method

High polymer natural gas pressure welding joint! Environmentally friendly and allows for manual operation of the rebar gas pressure welding method.

The polymer natural gas pressure welding joint "Eco Speed Method" is a new gas pressure welding method that replaces traditional gas pressure welding using a reducing flame with a polymer reducing agent called "PS Ring." By using natural gas, it reduces environmental impact and improves the reliability of the pressure welding work. 【Features】 ■ The PS Ring is sandwiched between the ends of the rebar before welding, preventing oxidation with the decomposition gas generated by heating. ■ The PS Ring is composed of polystyrene and a steel ring, achieving A-class joints at -2. ■ It has passed the "Gas Pressure Welding Performance Evaluation Criteria" and obtained method certification. ■ The performance has been confirmed as an A-class joint in terms of joint performance type. ■ It is environmentally friendly. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Other construction services
  • Fittings
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

DB head fixation method

A construction method with significant economic benefits and consideration for the environment! The economic effects, such as shortened construction time and during transportation and unloading, are overwhelming.

We would like to introduce Hokuriku Gas Pressure Welding Co., Ltd.'s "DB Head Fixation Method." In recent years, the increasing strength and larger diameters of rebar work have led to problems in rebar construction with traditional bending anchor methods, such as difficulties in bending processing and longer fixation lengths. The "DB Head Fixation Method" addresses these issues. 【Features】 - No anchors, significantly improving on-site workability - Compatible with rebar from almost all domestic manufacturers - Simple distribution routes allow for immediate delivery - Capable of handling small lots - Significant economic benefits in terms of shortened construction periods and during transportation and unloading - High reliability due to the absence of joint surfaces and weld surfaces, with the visible product shape indicating its functionality *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Other construction services
  • Steel bar construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "SEN Method"

A next-generation energy-saving method that creates a "still air layer" by blowing air into the floor, walls, and ceiling.

The "SEN Method" is a next-generation energy-saving construction technique that uses the environmentally friendly natural wood-based insulation material "Eco Fiber." By blowing it into the floor, walls, and ceiling, it creates a "still air layer," which acts as a shock absorber, alleviating heat, cold, and noise. [Construction Examples] ■ Ceiling Work ■ Floor Work ■ Wall Work *For more details, please download the PDF or feel free to contact us.

  • Heat insulation and heat shielding methods
  • Special Construction Method
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete anti-corrosion coating method "Master Seal 7000 CR"

Achieving both performance and workability! Provides 360° protection from harsh corrosive environments such as wastewater treatment facilities and industrial effluents.

"Master Seal 7000 CR" is a new corrosion protection coating and concrete protection system that combines excellent corrosion resistance, chemical resistance, workability, and construction speed. It solves various problems in wastewater environments such as highly corrosive sewage treatment facilities, sewage pipelines, building pits, and factory drainage systems. Its performance has been demonstrated in rigorous concrete corrosion environment promotion tests, and these properties help protect concrete structures over long periods, contributing to an extended lifecycle. 【Features】 ■ Early equipment recovery ■ Chemical resistance ■ Crack-following ability ■ Adaptability to wet substrates ■ Improved construction environment *For more details, please refer to the PDF document or feel free to contact us.

  • Anti-rot, anti-termite, anti-mold material
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforcement Method "Fabric Foundation Reinforcement Material SRC"

Since construction can be carried out without using heavy machinery, it is possible to reinforce the foundation even in residential buildings with narrow gaps between adjacent structures.

The "Fabric Foundation Reinforcement Material SRC" is a foundation reinforcement method that involves attaching carbon fiber reinforcement material to one or both sides of a residential foundation to prevent collapse during earthquakes and other shaking. Since it can be installed without the use of heavy machinery, it is possible to reinforce foundations even in homes with narrow spacing between buildings. Carbon fiber has ten times the tensile strength of steel. 【Features】 ■ Weighs one-fourth of steel ■ Strength (tensile strength) is ten times that of steel ■ Does not rust *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Preparation Reinforcement Unit Construction Method

A construction method aimed at improving the workability of rebar construction, reducing labor, and shortening the construction period.

This technology involves the unitization of shear reinforcement bars, slab and wall insert bars (hereinafter referred to as rebar), and non-structural arrangement rebar for reinforced concrete, prestressed concrete, precast concrete, and reinforced concrete structures by spot welding them together in a factory. *For more details, please feel free to contact us.*

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Thin-layer BK tiles (Thin-layer KC method)

By reducing the thickness, material costs are lowered! Cost reduction is achieved compared to the typical KC method.

The "Thin Layer BK Tile (Thin Layer KC Method)" is a formwork-type colored tile method that incorporates functions required for sidewalks, such as improved aesthetics and enhanced safety. The height difference between the joints and the surface layer is reduced, allowing for safer walking. Additionally, by reducing the height difference between the joints and the surface layer, the vibration noise from casters and similar items has been minimized. 【Features】 ■ The use of formwork allows for the design of curved patterns. ■ Installation can be completed in a short time from the last train to the first train. ■ Excellent durability, including weather resistance, impact resistance, and wear resistance. ■ The anti-slip finish helps to reduce slipping on wet surfaces. ■ Suitable for use in areas where it is necessary to minimize the load on structural parts such as bridges. *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

BK Tile Spray Method (KC-S Method)

For landscape and anti-slip measures! By using fast-curing resin, construction can be completed in a short time.

The "BK Tile Spray Method (KC-S Method)" is a formwork color spray technique that achieves a variety of patterns on permeable asphalt pavement surfaces without significantly compromising their permeability function. Using formwork for tile-like and patterned designs, resin mortar is sprayed onto permeable asphalt pavement to create a comfortable urban space. Additionally, due to its thin layer, there are no height differences, making it barrier-free. 【Features】 ■ Does not compromise permeability function ■ No height differences ■ Mitigates the heat island effect ■ Quick application and early opening ■ Improved durability of the pavement *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Seminar] Air Water Inc.: Current Situation Surrounding Carbon Dioxide Production

Latest Trends in CO2 Separation, Recovery, and Utilization Technologies

Our company will hold a seminar titled "Air Water Co., Ltd.: Current Situation Surrounding Carbon Dioxide Production." As a manufacturer of liquefied carbon dioxide/dry ice, we are required to adapt to the decreasing supply of high-concentration carbon sources from domestic chemical plants and to engage in efforts toward decarbonization. This seminar will provide a detailed explanation of the current situation surrounding carbon dioxide production, as well as CO2 separation and recovery technologies from low-concentration CO2 exhaust gases emitted from woody biomass power plants and waste incineration facilities, in conjunction with the applications of carbon dioxide. 【Seminar Details】 ■ Date and Time: August 22 (Thursday) 13:30 - 15:30 (Doors open at 13:00) ■ Venue: JPI Conference Square ■ Address: 5-2-32 Minamiazabu, Minato-ku, Tokyo, Kowa Hiroo Building ■ Participation Method: In-person, live streaming, archive streaming ■ Speaker: Takaki Kaigawa Air Water Co., Ltd. Global & Engineering Group Plant and Equipment Development Center Process Development Group Leader *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Backfill injection work, rear cavity filling work, set form method (rigid polyurethane)

High-performance backing injection material with excellent safety and durability, constructed with 40 times expanded polyurethane!

- The set foam is a rapid foaming hardening type that cures in about 60 seconds. - The set foam reaches almost final strength in about 30 minutes, allowing the tunnel to be used immediately. - After curing, there is almost no volume change such as expansion or contraction. - Foaming starts about 12 seconds after mixing, resulting in minimal penetration into the ground behind the lining concrete and leaks from cracks, leading to less waste. - Due to its rapid foaming hardening type, there is little escape, allowing for complete filling of cavities. - It foams and hardens even underwater, and its independent bubbles provide excellent water-stopping properties. - The cured material has a low density, resulting in a smaller load acting on the lining concrete surface. - Analysis results and numerous achievements confirm that it does not cause water quality pollution and is safe.

  • Tunnel construction
  • Renovation and repair methods
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration