Construction method Product List and Ranking from 1598 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

541~555 item / All 4238 items

Displayed results

Temporary bridge temporary pier cable-stayed construction method "LIBRA Method"

Eliminating the need for high-altitude work while significantly shortening the construction process and improving safety.

The "LIBRA Method" is a temporary bridge and cantilever construction method that simplifies the securing of pile alignment by using upper steel panels as guides for pile driving, eliminating the need for scaffolding until the upper structure is erected, and streamlining the complex reinforcement of bridge piers on sloped terrain. Since high-altitude work is not required, it ensures safety while reducing work time. It is often adopted as part of national resilience initiatives and has a wealth of experience in construction access roads and work platforms for the expansion of highways to four lanes, as well as disaster recovery projects. 【Features】 - Enables parallel work on upper and lower structures, reducing waiting time and shortening processes. - The connection points of the newly installed panels to the pile bridge piers serve as guides for steel pipe installation, eliminating the need for dangerous guide material installation work. This improves safety while also reducing changes to the natural terrain and minimizing deforestation, thereby lessening the impact on the natural environment. - Drilling and installation can proceed simultaneously, allowing for stable construction from soft ground to hard ground. - Adaptable to various site conditions such as steep slopes in mountainous areas, rivers, dams, ports, and urban civil engineering. *For more details, please refer to the materials. Feel free to contact us with any inquiries.*

  • s1.png
  • s2.png
  • s3.jpg
  • 国道305号.jpg
  • 雄ノ山高架橋(s).jpg
  • LIBRA?.JPG
  • LIBRA?(s).jpg
  • LIBRA800(2).jpg
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Perfect Method High Ground Method

This is a construction method where a device similar to a gantry crane is assembled above a box girder or steel deck, allowing scaffolding to be lifted and moved while suspended.

Rails will not be dropped in order to lay them on box girders or steel decks.

  • Scaffolding and Support Materials
  • Other civil engineering works
  • Crane and others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wall saw method

Ideal for cutting walls that cannot be cut with a wire saw or creating slits!

The "Wall Saw Method" involves the installation of a dedicated rail, on which a special cutting machine moves to cut flat and sloped surfaces of concrete structures such as floors and walls. It is suitable for walls that cannot be cut with a wire saw and for creating slits. Please feel free to contact us if you have any requests. 【Features】 ■ Cutting work is performed along the rail, ensuring high precision of the cut surface. ■ Capable of cutting in vertical, horizontal, and diagonal directions. ■ Dry work is possible depending on the construction situation. ■ Easy to operate and highly maneuverable, making it versatile for various locations and angles. ■ Low noise, low vibration, and minimal dust, with no concerns about pollution. *For more details, please download the PDF or feel free to contact us.

  • Concrete construction
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete crushing method "Buster Method"

We will achieve dust-free, vibration-free, and low-noise concrete crushing work!

The "Buster Method" is a technique that involves inserting and operating a small high-output jack into a core drilling hole (φ160–200mm) to crush concrete. The crushing work can be carried out safely with no dust, no vibration, and low noise. It is a static crushing method that also takes the environment into consideration. Please feel free to contact us if you have any inquiries. 【Features】 ■ Safe construction with no dust, no vibration, and low noise during crushing work ■ Static crushing method that considers the environment ■ Enables planned crushing, allowing for a reduction in construction time *For more details, please download the PDF or feel free to contact us.

  • Concrete construction
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Crushing Method "Plate Jacking Method"

A concrete crushing method that can also destroy structures that cannot be partially cut!

The "Plate Jacking Method" is a concrete crushing technique that involves cutting approximately 3mm wide and 100mm deep with a cutter, inserting a jack, and expanding it using water pressure. It is mainly suitable for the demolition of concrete structures such as retaining walls and underground obstacles, as well as the dismantling of PC bridges, and for leveling PC columns and structures. 【Features】 ■ Prevents wire entanglement during horizontal cutting with wire saws, etc. ■ Capable of destroying structures that cannot be partially cut. *For more details, please download the PDF or feel free to contact us.

  • Concrete construction
  • Civil Engineering Method
  • Dismantling and moving

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Low-pollution crushing method "Electric Discharge Crushing Method"

It is a low-pollution type crushing method that has a higher crushing effect compared to crushing caused by cement expansion pressure and does not fall under explosives!

The "Electric Discharge Crushing Method" is a crushing technique that utilizes expansion from electrical energy. It excels in pollution characteristics such as noise, vibration, and dust, with a crushing efficiency of 5 to 25 m³ per day. The crushing force can be adjusted from a minimum of approximately 10 cm x 10 cm (concrete). Please feel free to contact us if you have any requests. 【Features】 ■ Control of crushing force allows for control of noise and vibration ■ Applicable to hard rock (uniaxial compressive strength of 350 MPa) and reinforced concrete ■ Easy handling of equipment and cartridges ■ If there is a gap between the adjacent structure, it will not have an impact ■ No legal regulations apply, so no qualifications or notifications are required during construction *For more details, please download the PDF or feel free to contact us.

  • Concrete construction
  • Civil Engineering Method
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Chimney Asbestos Removal Hi-jet ARC Method

Is the chimney currently in use okay?

The Hi-jet ARC method involves suspending the Hi-jet ARC removal device from the top of the chimney, allowing for a removal process that uses ultra-high pressure water while keeping the interior of the chimney unmanned. The device is lowered and raised as needed by an operator remotely, facilitating the removal process. 【Features】 - Unmanned remote water pressure cutting removal inside the chimney - Minimal dispersion of asbestos dust due to water removal - The water used is limited to the minimum necessary, similar to household tap water - Removal of not only liner-equipped chimney insulation but also hard lining materials such as asbestos cement cylinders in a single process - Cutting, washing, and removal of deteriorated areas such as asbestos fibers embedded in the concrete inner surface of the chimney and honeycombing - Maintains a negative pressure ventilation rate of 40 times/hour, countering chimney draft (updraft) - The work floor in the isolation area is waterproofed with construction-grade waterproofing materials, preventing leaks - Capable of removing chimneys that have collapsed and deformed during construction, as well as those with bends - Vibration is almost nonexistent compared to mechanical cutting removal, preventing damage to the chimney and buildings - The time required for removal is short, significantly reducing the construction period - Accommodates a wide range of chimney diameters from 130 mm to 3,500 mm *For more details, please feel free to contact us.

  • Concrete Machinery
  • Special Construction Method
  • maintenance

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filling materials utilizing air bubbles: "Air Milk" and "Air Mortar"

Usable regardless of location or condition. Filling materials 'Air Milk' and 'Air Mortar' effectively utilizing bubble AquaTuff HD(R).

The effective use of air bubbles is the origin of our ideas. In recent years, the characteristics of air milk and air mortar, which excel in lightweight and fluidity, have been recognized, leading to various research efforts and a gradual expansion of their applications. In addition to their adoption for reducing settlement on soft ground, alleviating loads on landslide-prone areas, or decreasing earth pressure on structures, as well as considering their impact on structures and buried objects in urban areas, they are also suitable as fill material in places where compaction is difficult or where transportation is restricted. This has drawn attention as a "new material" from a fresh perspective, and its usefulness has been highly evaluated. *For more details, please download the PDF or feel free to contact us.*

  • Bridge Construction
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

PCW Method

This is a new construction method that makes it possible to carry out work in areas that were previously difficult to access!

The "PCW method" is a technique that allows for the construction of embankment structures with minimal excavation of the existing road or terrain. By minimizing the regulations on the back side and allowing construction without the removal of existing structures, it leads to cost savings. Additionally, the width of the foundation bottom can be constructed at approximately 1 meter, allowing for minimal excavation and floor digging. 【Features】 ■ Minimal on-site construction ■ No need for unnecessary work ■ Foundation bottom width can be constructed at approximately 1 meter ■ Material that can be used in various locations ■ Material that reduces construction time *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks
  • Pile and foundation work
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ace Soil Method (Fluidized Treatment Soil)

For filling, backfilling, and compaction! This method allows for quick work.

The "Ace Soil Method (Fluidized Treatment Soil)" mixes construction-generated soil with water and air bubbles to fluidize it, adds a solidifying agent, and pumps it in large quantities to solidify to any desired strength. This method can be applied in any location without causing consolidation settlement, and it does not require compaction or heavy machinery work, ensuring safety during construction. Additionally, compact mobile plant operations can be carried out efficiently. 【Features】 ■ Adds a solidifying agent and pumps it in large quantities to solidify to any desired strength ■ Applicable in various locations ■ Simple system for cost reduction ■ Environmentally friendly due to fewer vehicles used, allowing for smooth operations ■ Efficient compact mobile plant operations *For more details, please refer to the PDF document or feel free to contact us.

  • Earthworks

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Refleet method

Refresh deteriorated concrete structures! Prevent the intrusion of water and carbon dioxide.

The "Refleet Method" is a structural repair technique developed to prevent deterioration and improve the durability of reinforced concrete structures. By applying a special penetrating alkaline agent "RF-100," it imparts alkalinity to the deteriorated structure while simultaneously reinforcing the surface, chemically and physically refreshing the concrete. To enhance the aesthetics, ensure safety, increase asset value, and improve durability of important social infrastructure such as reinforced concrete structures, we encourage you to utilize this method for longer service life. 【Features】 ■ Structural repairs tailored to the causes of deterioration ■ Polymer cement mortars with excellent properties ■ Cross-section repair methods based on deterioration symptoms ■ Abundant experience and construction track record *For more details, please refer to the PDF document or feel free to contact us.

  • リフリート工法2.JPG
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Panel-type square basket "Setron Panel Basket"

Wide range of applications such as disaster prevention and water purification! Environmentally friendly due to being a collection of stones!

The "Setoron Panel Cage" is a panel-type rectangular cage standardized according to JIS standards. With our high-performance machinery, we can process wire material known as "H type," which has high tensile strength, resulting in a cage with excellent shape retention. This has significantly reduced the bulging of the side mesh. Additionally, by using a special wire material with a high amount of coating adhesion, we guarantee outstanding gloss and long lifespan. It is also gaining attention as a civil engineering material required for permanent construction methods. 【Features】 ■ General-purpose cage ■ Capable of processing high-tensile wire material known as "H type" ■ Excellent shape retention ■ Very little bulging of the side mesh ■ Uses special wire material with a high amount of coating adhesion *For more details, please refer to the PDF document or feel free to contact us.

  • Baskets and futon baskets
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Crack low-pressure injection dedicated nozzle TS injection nozzle a-1

An item that leads the tip of crack injection.

This is a dedicated low-pressure injection nozzle for cracks that can reliably demonstrate filling capability from the cracked surface without damaging the construction surface, improving workability and allowing anyone to easily perform injection work.

  • Work tools
  • Equipment leasing and rental

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vertical Drain Method, Geo Drain Method

Vertical drain method without using sand mat.

The vertical drain method (plastic board drain method) is an economical soft ground improvement technique.

  • Earthworks
  • Ground improvement
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair method for fire water tanks against aging deterioration.

Save from the crisis of leaks and collapses! A method for repairing aging water tanks from the inside.

The "Aging Deterioration Prevention Fire Water Tank Repair Method" is a technique that saves aging concrete water storage tanks from the risks of leakage and collapse through special coating treatment and repairs from the inside. We will extract and propose the optimal method based on the current conditions of the installed water tanks and the surrounding environment (residential areas, roads, lifelines). 【Features】 〔Coating〕 ■ Epoxy Coating: Deterioration suppression and internal corrosion prevention ■ Urethane Coating: Leakage prevention and internal corrosion prevention 〔Repair Methods〕 ■ H-Type Frame Method: Leakage prevention and seismic reinforcement ■ Water Tank In Method: Installation of a new tank within the existing tank *For more details, please refer to the catalog or feel free to contact us.

  • Flood prevention facilities, fire tanks, and flood control ponds
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration