Construction method Product List and Ranking from 29 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. Off-site construction method for air conditioning equipment "Vispaire Frame"
  2. Reinforcement of existing beam after hole cutting: "Redouble Method"
  3. Leave the drainage repair work to us! "Neplus Method Construction Achievement Case Collection" 高橋土建
  4. 4 Rigid urethane coating waterproofing HU-B method 化研マテリアル
  5. 5 Special foundation roller painting method for interior and exterior finishes "Fine FR Method" エスケー化研

Construction method Product List

526~540 item / All 3137 items

Displayed results

A booklet titled "Ground Handbook" that clearly explains various ground reinforcement methods.

Attention those troubled by ground improvement work! We have a wealth of information on selection methods for surface improvement work, friction piles, columnar improvement methods, and the characteristics of each method. *Materials are currently being distributed.

The "Ground Handbook" is a booklet that introduces methods for ground surveys and ground reinforcement work conducted when constructing new buildings. It provides clear explanations of two commonly used ground survey methods and the ground reinforcement techniques that our company can implement. This can serve as a reference when selecting ground reinforcement methods and can be used as explanatory material for clients. 【Featured Methods】 ■ Surface Improvement Work: Rising W/D Method ■ Friction Piles: Ultra Wood Column Method, Economic Base Method ■ Columnar Improvement Methods: Ultra Column Method, Ultra Pile Method, Ultra Pillar Method *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

液状化対策・軟弱地盤対策スーパージオ工法 【免震・地盤改良】

杭不要!敷き詰めるだけの低コスト免震・地盤改良工法 【免震保証付き】【特許取得済み】

建物の重量と同等の地盤を取り除き、かわりにスーパージオ材を敷き詰めて地盤を軽くし、建物の支持力を確保する置換工法です。 地震時に発生した過剰間隙水を一時的に保水でき、液状化対策としても効果を発揮します。 土地の鑑定時には「土壌汚染」や「埋設物」の有無もチェックされます。 柱状改良や鋼管杭は産業廃棄物なので費用がかさみ不動産価格を下げてしまいます。 スーパージオ工法は、杭を打たない工法のため、原状回復には部材を取り除くだけで多大なコストをかけず簡単にできます。 【特徴】 ○従来の改良工法と比較して大幅なCO2削減が可能 ○耐酸性・耐アルカリ性に優れ、微生物による劣化もない ○重機や特殊技術、機器が不要 ○メンテナンスフリー ○雨水利用・地熱利用も可能 ★同工法が2015年2月1日、テレビ朝日系「大改造!!劇的ビフォーアフター」で紹介されました。大反響につき現在、販売代理店も募集中です。 詳しくはお問い合わせ、またはカタログをダウンロードしてください。

  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Replacement construction method "Super Geo Method"

Protect buildings from earthquakes, liquefaction, and weak ground!

The Super Geo Method reduces load by using Super Geo material as a replacement material, thereby alleviating consolidation settlement of the underlying ground. Additionally, during an earthquake, it incorporates pore water within the Super Geo material to prevent sand boiling due to water pressure and stabilizes the ground during liquefaction. 【Features】 ○ Provides seismic mitigation ○ Offers liquefaction countermeasures ○ Can be installed on any type of land For more details, please contact us or download the catalog.

  • Earthworks
  • Pile and foundation work
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Construction report fraud is a fatal injury" - A solution! Visually detectable ground reinforcement SG method.

The "Super Geo Method" is a seismic isolation and ground improvement technique that allows the construction process to be visually understood.

Due to the bearing capacity of the ground, we remove the amount of soil that can support the weight of the building and lay down "Super Geo Material" made from recycled plastic, which prevents settlement through its load reduction effect. * *A strong guarantee backed by confidence* * ❍ "Ground Guarantee" up to 300 million yen; "Seismic Isolation Guarantee" up to 100 million yen Since Super Geo Material acts as a cushioning material, it becomes a seismic reduction method and is covered by major insurance companies! ❍ "Liquefaction Guarantee" up to 100 million yen! During liquefaction, only water is absorbed into the Super Geo Material to prevent it from gushing to the surface. When the earthquake subsides, the water returns to the soil, maintaining stability during liquefaction. ■====【Features】====================■ ■ The construction process can be visually confirmed because it is done manually. ■ Can be installed on any land or soil type, including soft ground. ■ Can be assembled without special technology or equipment (reassurance through an inspector system). ■ Only the components need to be removed during dismantling! Does not lower the land's asset value. ■ Comes with a 10-year seismic isolation and liquefaction guarantee (renewable every 10 years, up to a maximum of 30 years). ■============================■

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement work - Wet method of columnar improvement.

Reinforcing weak or unbalanced ground with ground improvement work! It will also become more resilient to disasters!

The wet column improvement method involves mixing soil and cement milk to create columnar bodies with a diameter of 400mm to 800mm within the soil. These thick and large columns support the house due to their friction resistance. If the soil and cement milk are mixed carelessly, a proper columnar body cannot be formed. Columnar improvement relies on careful mixing. ↓↓ For more details, please contact us. ↓↓

  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Environmentally friendly new ground reinforcement "GRR Sheet Method"

Can be used in cultural property buried sites! Ground reinforcement method that can be implemented at shallow construction depths.

The "GRR sheet method" is a ground reinforcement technique that involves laying "geotextiles" within a crushed stone base that has a specified thickness. By utilizing the "rigidity reinforcement effect near the surface due to the crushed stone base" and the "deformation constraint effect of the crushed stone layer provided by the sheet," it reduces differential settlement and enables stable support for structures over time. 【Features】 ◆ All processes are visually observable, ensuring reliable construction management ◆ No curing period required, allowing for reduced construction time ◆ Can be implemented in narrow spaces as it does not require the use of specialized construction machinery 【For more details, please feel free to contact us】

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement "Pure Pile Method" high strength, short construction period, no residual soil!

Presentation of Detailed Information: A new form of columnar improvement method that does not mix soil with cement! Ensuring safe and secure single-family homes! Pile foundation reinforcement method for single-family houses.

The Pure Pile Method is an advanced ground reinforcement technique that enhances traditional columnar improvement methods, providing a safe and high-quality pile foundation with three times the strength, even in humus soil. Since piles are constructed using only cement milk without soil contamination, it achieves uniform and stable high strength regardless of the type of ground. Furthermore, a special excavation rod expands the ground laterally while digging to the support depth, allowing for the construction of the pile body by replacing it with cement milk. 【Features】 - The strength of each pile is approximately three times that of columnar improvement. - Construction time is about half that of columnar improvement. - Minimal residual soil contributes to a cleaner site, demonstrating environmental consideration. For more details, please contact us or download the catalog.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Improvement in Kyoto Prefecture: Ground Reinforcement Method 'Woody Force Method'

Applicable to sandy and clayey soil in the Kyoto area! This is an ecological and environmentally friendly method that utilizes small-diameter thinned timber as ground reinforcement material for houses!

The Woody Force method is a ground reinforcement technique aimed at small-scale buildings, utilizing unused thinned wood. This method uses thin-diameter thinned wood from "sugi" (cedar) or "hinoki" (cypress), which is somewhat too slender for use as house pillars and has been largely underutilized, as ground reinforcement material for houses, making it eco-friendly. By applying anti-corrosion and anti-termite treatment that complies with AQ certification (certification for quality wood building materials, etc.) B-3 (outdoor product components) to the wood used as ground reinforcement material, we aim to further enhance durability. 【Features】 ■ CO2 Reduction - Does not use cement or steel, which emit large amounts of CO2 during the manufacturing process - Contributes to energy conservation and reduction of greenhouse gases ■ Durability - By applying anti-corrosion and anti-termite treatment that complies with AQ certification B-3 to the wood used as ground reinforcement material, we aim to further enhance durability. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Improvement in Osaka Prefecture: Ground Reinforcement Method 'Woody Force Method'

Applicable to sandy and clayey ground in Osaka Prefecture! This is an ecological and environmentally friendly method that utilizes small-diameter thinned timber as ground reinforcement material for housing!

The Woody Force method is a ground reinforcement technique aimed at small-scale buildings, utilizing unused thinned timber. This method uses thin-diameter thinned timber of "sugi" (Japanese cedar) or "hinoki" (Japanese cypress), which is somewhat too slender for use as house pillars and has been largely underutilized, as ground reinforcement material for houses, making it eco-friendly. By applying anti-corrosion and anti-termite treatments that comply with AQ certification (certification for quality wood building materials, etc.) B-3 (outdoor product components) to the wood used as ground reinforcement material, we aim to further enhance durability. 【Features】 ■ CO2 Reduction - Does not use cement or steel, which emit large amounts of CO2 during the manufacturing process - Contributes to energy conservation and reduction of greenhouse gases ■ Durability - By applying anti-corrosion and anti-termite treatments that comply with AQ certification B-3 to the wood used as ground reinforcement material, we aim to further enhance durability. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ultra Column Method [Ground improvement with over 3,800 achievements in 6 years]

Quality inspection shortened from one week to same day! A new soil column method for constructing high-quality columns.

The "Ultra Column Method" is a mechanical mixing deep mixing treatment method that uses cement-based solidifying material slurry. By measuring the resistivity of the column with a mixing tester immediately after construction and confirming the mixing conditions, high-quality columns can be constructed quickly. This is a new soil column method that has achieved over 3,800 cases in just six years. 【Features】 ◆ Quality inspection that usually takes about a week can be done on the same day ◆ Improved mixing efficiency with proprietary technology ◆ Suitable for small-scale buildings ◆ Low noise and low vibration 【For more details, please download the catalog or feel free to contact us】

  • Ground improvement materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor construction: Re-vibration and high-density concrete method

High-density 200-year concrete, highly regarded for factories, warehouses, logistics facilities, and roads.

The re-vibration and high-density concrete method removes voids and water channels that cause cracking, utilizing the compaction effect of re-vibration to form a dense structure within the concrete and improve its density. It aims to enhance durability, wear resistance, and impact resistance, delay carbonation, suppress cracking, and shorten construction time through simultaneous execution, ultimately extending the service life for various social infrastructure developments such as factories, warehouses, logistics facilities, and roads, as well as contributing to national resilience policies. 【Features】 - Increased service life - Significant crack suppression - Reduction in construction man-hours - Increased asset value - Total cost reduction For more details, please contact us or download the catalog.

  • Dam construction
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vacuum concrete construction method

Removal of excess water enables improved durability and shortened construction time! Vacuum concrete method.

The vacuum concrete method is a technique for removing excess water (extra water) and entrained air (air contained in fresh concrete) from within the concrete. This method primarily consists of a vacuum mat and a vacuum pump, and it is applied immediately after pouring. 【Features】 ○ Increased durability ○ Significant crack reduction ○ Freeze prevention ○ Reduced work time For more details, please contact us or download the catalog.

  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Re-vibration construction method: "Benefits of Re-vibration and High-Density Method"

Ideal for factories, warehouses, and roads! 7 benefits of high-density 200-year concrete.

The re-vibration and high-density concrete method is a construction technique that removes voids and water pathways that cause cracking, forming a dense effective structure within the concrete to improve its density. This construction method has seven advantages: "high density," "smooth floor level," "reduction in material costs," "significant suppression of cracking," "reduction in repair costs," "enhancement of the delay effect of neutralization," and "increase in real estate value." 【Seven Advantages】 1. High density 2. Smooth floor level 3. Reduction in material costs 4. Suppression of cracking 5. Reduction in repair costs 6. Enhancement of the delay effect of neutralization 7. Increase in real estate value *For more details, please refer to the catalog or feel free to contact us.

  • Dam construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Basic external insulation method "TB Board Method"

Complete external insulation from the foundation to the roof! It is a foundation external insulation method with termite resistance.

As a weakness of the conventional external insulation method for wooden house foundations, the insulation material buried underground is prone to termite damage, and in fact, the damage is expanding. Therefore, in areas where termite damage is anticipated, it is common to use "internal insulation" construction, where the installation position of the foundation insulation material is on the inside, despite being an external insulation method. However, in terms of promoting the durability of the foundation, preventing thermal bridges, or creating a good thermal environment under the floor, "external foundation insulation" construction, where the installation position of the insulation material is on the outside, is desired to improve the fire resistance of the house. Recently, a foundation external insulation method that can be efficiently constructed using the 'TB Board,' which excels in termite resistance, insulation, moisture resistance, waterproofing, and fire resistance, has been realized. 【Features】 ○ Increased durability of the foundation ○ Improved thermal environment under the floor ○ Labor-saving construction ○ Certified product by the Japan Wood Preservation Association, Certification No. C-4028 ○ Termite insurance (product liability insurance) for 10 years For more details, please contact us or download the catalog.

  • Heat insulation and heat shielding methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration