This is a construction method where a device similar to a gantry crane is assembled above a box girder or steel deck, allowing scaffolding to be lifted and moved while suspended.
Rails will not be dropped in order to lay them on box girders or steel decks.
Inquire About This Product
basic information
【Features】 ○ The equipment is very large ○ Suitable for long spans of over 70m ○ A construction method that can be used on the floor slab only ● For more details, please contact us or download the catalog.
Price information
Please feel free to contact us.
Delivery Time
※Please feel free to contact us.
Applications/Examples of results
For more details, please contact us.
catalog(1)
Download All CatalogsCompany information
To eliminate the risks associated with the assembly and disassembly of suspended scaffolding required for tasks such as bridge installation and painting, a construction technique for suspended scaffolding that simplifies assembly and disassembly work at heights has been certified by the National Institute for Land and Infrastructure Management as "General Civil Engineering Method - Publicly Solicited Technical Review Certificate" No. 404, in March 1993.