Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

2386~2400 item / All 4237 items

Displayed results

Concrete drilling method - Diamond drill method

Concrete drilling method - Diamond drill method

Successfully drilled a hole with an inner diameter of 1 meter. We also support line cutting for larger holes. 【Features】 ○ Inner diameter of 1 meter, and horizontally oriented. We have successfully achieved this drilling, which has been considered difficult until now. We can drill concrete structures in all sizes, from a small diameter of 27 mm to a large diameter of 1 meter. ○ For larger inner diameter holes, we use the line cutting method. We can perforate concrete in all sizes, shapes, and lengths, including circular, oval, square, and polygonal shapes. ● For other functions and details, please contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Grooving method

Grooving method

Developed a dry method that does not use water. Achieved environmentally friendly groove cutting work. 【Features】 ○ In addition to the wet method, we have developed a machine that uses a dry method that does not generate wastewater. Since it does not use water, the amount of waste is reduced to about one-tenth, significantly improving the working environment. We are considerate of the environment. ○ Since roads, runways, factories, and gas stations are visible to the public, appearance is also important. From vibrant straight lines to subtly curved lines, experienced operators pay attention to beauty as well. ● For other functions and details, please contact us.

  • Dam construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Integrated building material wind and zero separation method 'DR0'

This is a solar mounting system for residential use that features an integrated building material design, capable of being installed on highly versatile metal roofs (standing seam) with one of the narrowest separation widths in the industry!

The integrated building material wind and zero spacing method 'DR0' is a mounting frame for solar modules that can be used on highly versatile metal standing seam roofs. Features: ■ The spacing width is among the narrowest in the industry. ■ Can be installed on highly versatile metal standing seam roofs. ■ Can be installed on both new and existing buildings. ■ Variations for eaves that accommodate drop beams. ■ By using a screw-fixing method, panel placement is not affected by the position or spacing of the seams. *For more details, please refer to the PDF document or feel free to contact us at the information below. 【Exhibition Information】 We will be exhibiting at the "PV EXPO - 18th [International] Solar Power Generation Exhibition [Spring] -", held at Tokyo Big Sight from February 28 to March 1. We sincerely look forward to your visit. ■ Booth Number: East Hall 1 E1-38 Solar and Eco Business Division Contact Information https://daidohant.com/contact/ 06-6190-9936 Tags: Solar, Solar Panels, Solar Power Generation Systems, Solar Panels, Solar Power, Decarbonization, Carbon Neutral, SDGs, Roofing Work, Renovation, EPC, PPA, Energy Saving, Renewable Energy, Storage Batteries

  • Solar mounting brackets and fittings (solar fittings and protective sheets)
  • Solar power generation equipment
  • Photovoltaic power generation system (solar system, energy-saving housing, electricity sales business)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Uniform thickness soil-cement continuous wall TRD method

Thickened Soil-Cement Continuous Wall TRD Method

The TRD method (Trench cutting & Re-mixing Deep wall method) involves moving a cutter installed underground horizontally to excavate, mixing and stirring the solidifying liquid with in-situ soil in a vertical direction, and creating a wall-like solidified body underground. 【Features】 ○ Outstanding stability ○ Continuous without discrepancies ○ Homogeneous wall quality in depth direction ○ Arbitrary setting of core material spacing is possible ○ Deep construction is possible ○ High-precision construction is possible ○ Construction on slopes is possible ○ Construction with low headroom is possible ○ Cost reduction achieved through shortened construction period ● For more details on other functionalities, please contact us.

  • Steel structure construction
  • Foundation construction
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Captain Pile Method

Captain Pile Method

A method for semi-fixed pile heads for cast-in-place piles, where a precast concrete ring (PC ring) is placed over the pile head to connect the pile and the foundation. 【Features】 ○ The arrangement of the pile head is simple, and there are no protruding rebar during installation, making the construction fast and easy. ○ The bending moment at the pile head can be reduced, resulting in less damage to the pile material compared to conventional methods, thus improving seismic resistance. ○ By reducing the pile head moment, the cross-section of the foundation beams and piles can be minimized, allowing for significant reductions in the amount of concrete and rebar used. ○ It is an environmentally friendly method that reduces the amount of excavated soil. ○ It can be applied to all cast-in-place piles (800-3000), including those with steel pipe wrapping. ● For other functions and details, please contact us.

  • Concrete sheet piles and piles
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

RDS underground continuous wall method

RDS underground continuous wall method

Foundation construction methods with functions as permanent structures for underground facilities, including temporary retaining walls, underground outer walls, two-way slab lateral pressure walls, composite walls, seismic walls, and support piles. 【Features】 - Expansion of underground space through composite walls and two-way slab lateral pressure walls. - Simple joint structure providing excellent workability and water-tightness. - High-precision construction management through a unique system, including excavation machine management, excavation accuracy management, concrete placement management, and stabilizing fluid management. For other functions and details, please contact us.

  • Earthworks
  • Piles, caissons, sheet piles
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CK Roof Deck Type 88

CK Roof Deck Type 88

Roofing folding plates of type 88 suitable for factories, warehouses, garages, gas stations, etc. 【Features】 ○ Material thickness: 0.5mm to 0.8mm (using 914mm width coil) ○ Effective width: 600mm, 1.67m of formed plate covers 1 square meter ○ Beams: Usable with both wood and steel materials ○ Standard colors: Blue, Gray, Silver, New Tea ○ Eaves cut and both ends cut available ○ Uses non-combustible material (MN-8697) certified collectively by the Zinc Steel Plate Committee of the Japan Iron and Steel Federation from the Minister of Land, Infrastructure, Transport and Tourism ● For other functions and details, please contact us.

  • Metal roof
  • Waterproofing work
  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CK Folding Plate Type 2

CK Folding Plate Type 2

Roofing panels suitable for factories, warehouses, garages, and gas stations - Type 2 Hachi roof panels 【Features】 - By widening the effective width of Type 1 Hachi panels to 500mm, we have thoroughly pursued cost savings on materials and labor efficiency in construction. - The wide base width makes the cross-sectional shape of the panels appear larger, achieving a more dynamic design effect. - Material thickness: 0.8mm to 1.2mm (using 762mm width coils) - Effective width: 500mm, with a 2m formed panel covering 1 square meter - Beams: Can be constructed with steel materials - Standard colors: Blue, Gray, Silver, New Tea - Eaves cut and both ends cut are possible - Uses non-combustible material (MN-8697) that has been collectively certified by the Minister of Land, Infrastructure, Transport and Tourism and the Zinc Steel Plate Committee of the Japan Iron and Steel Federation. ● For other functions and details, please contact us.

  • Metal roof
  • Waterproofing work
  • Roof and gutter construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement using slurry injection method.

Ground improvement by slurry injection method

The Mad Mixer Method (M-II type) is a technique that involves injecting a slurry material, mixed with solidifying agents and water at a plant, into the ground while stirring and mixing it in place. It reliably forms a strong improved body according to the design strength. **Features** - Ground improvement depth can be precisely processed from 0.5 to 8.0 meters. - Strength settings can be adjusted to various conditions such as ground conditions, structures, and design strength. - There is no concern about dust dispersion, and it does not affect nearby residences. - Vibration is reduced by matching a ground improvement-specific attachment with an ultra-long backhoe. For more functions and details, please download the catalog.

  • Ground improvement
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground Improvement Method: Woody Force Method

Effective use of timber leads to forest management and regional revitalization! Construction methods targeting small-scale buildings.

The method is a ground reinforcement technique using unused thinned wood, aimed at small-scale buildings. The construction machinery is relatively small and does not take up much space, allowing for efficient execution, and the construction period can be shortened compared to conventional methods. Since it does not use water or cement, there is no dust generation, and the construction area remains clean. Unlike methods where structures themselves support the loads of buildings like piles, this technique uses relatively small components densely arranged in the ground to reinforce it. 【Features】 - Targeted at small-scale buildings - Utilizes unused thinned wood - Relatively small components densely arranged in the ground reinforce it - Construction machinery is relatively small and does not take up much space - Construction period can be shortened compared to conventional methods *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TG Type Multi-Natural Coastal Protection Series Ee Frame Method

This is a revetment method using high corrosion-resistant alloy coated steel plates and thinned timber logs.

Tōō Kingiken Co., Ltd. has developed the "Ee Frame," a revetment method that excels in economy, construction, and functionality, utilizing high corrosion-resistant alloy-coated steel plates (Nippon Steel's Super Dima) and thinned timber logs as alternatives to traditional river construction methods such as willow branch work, chestnut stone rough wood work, soil cover block work, and cage mat methods. This method contributes to cost reduction, the utilization of domestic thinned timber, the recycling of construction by-products, and resource and energy conservation through reduced coating amounts on steel plates, thus helping to prevent global warming. It is also suitable for the preservation and regeneration of our beautiful natural environment and the maintenance of flood control functions, making it a "multi-natural river construction method." For more details, please contact us or refer to the catalog.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TG Type Multi-Natural Coastal Protection Series Environmental Coastal Protection Sheet Block Jun Rock

It is an environmentally friendly block for coastal protection made of natural stone composites that harmonize with the natural environment.

Concerns about the deterioration of the natural environment and considerations for economic conditions have led to a demand for high-quality techniques in the execution of future public works, including environmental conservation and cost-effectiveness. In order to protect our country's "beautiful mountains and rivers," various bank protection methods and materials have been developed to preserve and create rich and vibrant natural landscapes and ecosystems. To this end, Tōō Giken Co., Ltd. has been working on the development and dissemination of numerous products and methods for bank protection. Recently, we have developed the "Jun Rock," a natural stone composite TG-type environmentally friendly block that harmonizes with the natural environment while maintaining safe flood control functions. The "Jun Rock" features approximately 12% void area per block, providing space for plants and small organisms to thrive, thus contributing to the preservation and creation of ecological environments. Additionally, the surface of the block is covered with natural granite finished with a protruding texture, offering a calm and rich appearance and landscape that only genuine materials can provide, unlike artificial stone blocks. For more details, please contact us or refer to our catalog.

  • Airport facilities
  • River construction
  • Tile work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TG-type wooden plate frame MACS-II

Creating a gentle habitat for rich nature and living beings by the waterside.

Due to the growing awareness of waterfront environments, riverbank construction methods that use natural materials such as wood and stone have been re-evaluated with consideration for natural ecosystems. To this end, Toho Giken Co., Ltd. has developed various products, including the wooden sunken bed "Biocross," the wooden formwork "Bels," the wooden composite block "Bioplus," and the multifunctional fish nest "Max," which have been successfully implemented in rivers across the country. We have now developed and proposed a new TG-style single-sided formwork construction method called "MACS-II" (Max II), which is effective for ensuring the safety of riverbank flood control functions and creating ecological environments. For more details, please contact us or refer to our catalog.

  • Airport facilities
  • River construction
  • Wood panel and frame wall construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TG Method Parapet Wall Construction

This is a block divided into an L-shaped main body and a foundation block, to be installed on river levees.

The TG-style parapet wall features a structure divided into L-shaped main body blocks and beam-shaped foundation blocks, with the gap between the toe of the breast wall and the slope protection filled with cast-in-place concrete. This design enhances the waterproofing function to prevent damage to the embankment from water infiltration. When the blocks are integrated into a single structure, the complexity of the formwork leads to difficulties in concrete pouring and demolding, and the variety of slope types for the revetment increases formwork costs, resulting in a significant rise in product prices due to decreased turnover rates. Additionally, transporting and delivering the blocks, as well as installation and dimensional adjustments on-site, require considerable effort, hindering the efficiency of the laying work. Therefore, the TG-style parapet wall is designed to allow for adjustments in the cast-in-place concrete to accommodate changes in the slope of the toe section, making it a construction-friendly structure and dimension. This method of constructing parapet walls responds to the recent demands for cost reduction and high-quality construction. For more details, please contact us or refer to our catalog.

  • Protective fence
  • River construction
  • Crane and others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration