This is a block divided into an L-shaped main body and a foundation block, to be installed on river levees.
The TG-style parapet wall features a structure divided into L-shaped main body blocks and beam-shaped foundation blocks, with the gap between the toe of the breast wall and the slope protection filled with cast-in-place concrete. This design enhances the waterproofing function to prevent damage to the embankment from water infiltration. When the blocks are integrated into a single structure, the complexity of the formwork leads to difficulties in concrete pouring and demolding, and the variety of slope types for the revetment increases formwork costs, resulting in a significant rise in product prices due to decreased turnover rates. Additionally, transporting and delivering the blocks, as well as installation and dimensional adjustments on-site, require considerable effort, hindering the efficiency of the laying work. Therefore, the TG-style parapet wall is designed to allow for adjustments in the cast-in-place concrete to accommodate changes in the slope of the toe section, making it a construction-friendly structure and dimension. This method of constructing parapet walls responds to the recent demands for cost reduction and high-quality construction. For more details, please contact us or refer to our catalog.
Inquire About This Product
basic information
【Features】 [Load Actions of TG Type Parapet Wall] ○ Self-weight ○ External water pressure ○ Earth pressure and superimposed load ○ Inertial force during an earthquake ○ Crowd load ○ Load from pedestrian and bicycle fall prevention fences ○ Wind and snow load ○ Collision load from vehicle protection fences [Construction Work Rate for TG Type Parapet Wall (per 10m)] ○ Caretaker: Foundation block: 0.15 persons, Main block: 0.15 persons ○ Block worker: Foundation block: 0.15 persons, Main block: 0.15 persons ○ General worker: Foundation block: 0.30 persons, Main block: 0.30 persons ○ Block products: Foundation block: 5 pieces, Main block: 5 pieces ○ Crane rental: Foundation block: 0.15 days, Main block: 0.15 days ○ Miscellaneous expenses: Foundation block: 11%, Main block: 10% ● For more details, please contact us or refer to the catalog.
Price information
Please contact us.
Delivery Time
※Please contact us.
Applications/Examples of results
For more details, please contact us or refer to the catalog.
catalog(1)
Download All CatalogsCompany information
Tohō Giken Co., Ltd. was established in July 1979 with the corporate philosophy of "Advanced Technology and Creativity," operating as a knowledge-intensive company. The main focus of the company's business is the development and dissemination of new methods and products for riverbank protection. We have developed numerous unique riverbank protection methods and products that are rare in the industry, accumulating a track record of construction and receiving recognition as innovative methods and products. In particular, in recent years, we have been promoting the "Multi-Natural River Creation" method, striving to develop new methods and materials that reduce labor and resources while also considering and improving environmental impacts, based on traditional river construction methods in our country. We are also promoting our business through active applications for industrial property rights and registration with NETIS, aiming for business expansion through licensing agreements with companies in various regions and partnerships with different industries. Recently, we have been developing and selling products aimed at individuals that consider the global environment, in addition to civil engineering construction materials.