Construction method Product List and Ranking from 1593 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. ナカムラ Hyogo//Other construction industries
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries

Construction method Product ranking

Last Updated: Aggregation Period:Dec 10, 2025~Jan 06, 2026
This ranking is based on the number of page views on our site.

  1. Construction method for achieving large wooden structures: "NK Method" ナカムラ
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  4. 4 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部
  5. 5 [Disaster Measures] A must-see for those who want to reduce the amount of leftover soil! Liter Method 吉光組

Construction method Product List

136~150 item / All 4252 items

Displayed results

Construction method (bellows unit method)

Construction method (bellows unit method)

The construction period for rebar assembly work can be shortened. (About half of the usual on-site assembly time) Assembly in the factory improves work efficiency and leads to a reduction in personnel. Since pre-assembly can be done, installation on-site can be carried out by a small number of people. By folding the components, efficiency during transportation can be improved compared to traditional factory pre-assembly methods.

  • Reinforcement and repair materials
  • Unit and other construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Balcony Roof Deck (Non-Screw Staggered Layout)

A wood deck that achieves insulation and lightweight design! Suitable for rooftops and balconies!

The non-bis method and staggered layout have made it possible to feel the texture of the colored wood even more. The wood deck, which provides insulation when laid down, is ideal for balconies and rooftops. Since it uses polyurethane as insulation material, it also has insulating effects on rooftops. Additionally, it is a lightweight wood deck that places less burden on buildings, making it effective for earthquake resistance.

  • Company:MINO
  • Price:Other
  • Wood deck (synthetic wood/resin)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

If you are going to repair the circular waterway inside the tunnel | Top Shield Method

A method for efficiently repairing circular water channels! Circular gutters with pedestrian and vehicle blocks are also acceptable.

Is there a place you would like to regenerate or extend the lifespan of? - Circular water channels in highway tunnels - Circular water channels with pedestrian and vehicle road blocks on top - Elevated circular water channels - Locations where replacing ditches is difficult - Areas where construction affects underground structures - Urban ditches located at sidewalk boundaries, etc. Product Overview The optimal repair method for aging circular water channels "Top Shield Method" The Top Shield Method is a repair technique that uses formwork to repair existing circular water channels (pipe-type ditches). It involves vertically cutting the deteriorated parts of the circular water channel and repairing them with a dedicated formwork (high-tensile steel residual formwork) and jet concrete. The formwork integrates with the structure without being removed. Advantages Environmental: Reduces the generation of construction waste Durability: Resistant to rust with standard specifications of molten zinc coating Workability: Shortens construction time (construction volume: approximately 20 meters per day, self-calculated) Safety: Uses high-strength high-tensile steel (high-strength steel)

  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Yoshino Fireproof Column ZC-1 ZC-2 ZC-3 Fireproof Coating Method for Steel Columns (H-shaped Steel) Using Reinforced Gypsum Board

Yoshino Fireproof Column ZC-1 ZC-2 ZC-3 Fireproof Coating Method for Steel Columns (H-shaped Steel) Using Reinforced Gypsum Board

**Features** - Simple Structure: Reinforced gypsum board "Tiger Board Type Z" is screwed onto a steel frame. - Excellent Workability: The covering of columns and interior wall construction can be done by the same contractor. The dry construction method ensures stable quality, keeps the site clean, and shortens the construction period. Painting and wallpaper finishing are possible, leading to reduced total costs. - Minimization of Sound Insulation Reduction: When connecting with soundproof walls, it is possible to minimize sound insulation reduction. *For more details, please contact us.*

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

MM Drill System

Opening up the possibilities of 'construction while living'! A low-noise, low-vibration drilling system.

The "MM Drill System" is a low-noise, low-vibration drilling system. It allows for sharp drilling into concrete with a rotary drill, eliminating the need for a hammer drill. The MM shank, equipped with patented technology, generates only a slight pulse, achieving low vibration. 【Features】 ■ No need for a hammer drill, resulting in low noise ■ Low vibration ■ 3-blade MM drill capable of drilling without water ■ Comes with a tool box *For more details, please refer to the PDF materials or feel free to contact us.

  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry Floating Bed Finishing Method "PF System" [Enabling Free Design!]

A dry floating floor finishing method that allows for adjustable heights on rooftops, balconies, terraces, etc.! It enables flexible designs such as barrier-free layouts!

This is a dry floating floor finishing method composed of support legs that can be adjusted to any height, such as on rooftops, balconies, and terraces, along with a variety of finishing materials. It allows for flexible designs, including barrier-free designs. 【Features】 ■ Barrier-free design and flexible design ■ Variety of finishing materials and load reduction ■ Temperature reduction effect ■ Materials are made from recycled materials ■ Can be recycled after use *For more details, please request materials or view the PDF data available for download.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration