List of Ground foundation construction method products
- classification:Ground foundation construction method
136~180 item / All 753 items
You won't have time to evacuate from the earthquake to the tsunami's arrival! This is a "tsunami shelter" that dramatically increases survival rates against the tsunami approaching at a tremendous spe...
- Basement unit/disaster prevention shelter
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
A foundation pile method that enables construction under harsh conditions with a lightweight and compact machine!
- Ground foundation construction method
Partial dismantling of the base top! Only the structure above the foundation is leveled and restored using jacks.
- Ground foundation construction method
After excavating the sunken foundation, install the steel plates! Apply pressure with a hydraulic jack to create a stable ground.
- Ground foundation construction method
Expert in settlement correction! A construction method with minimal risk of re-settlement, ensuring safety for the future.
- Ground foundation construction method
Low vibration, low noise, casing drilling! Enables various pile construction in confined spaces!
- Ground foundation construction method
Acquisition of construction technology review certification! Directly driving steel pipe sheet piles into bedrock.
- Ground foundation construction method
Achieving rapid construction of temporary piers in low headroom! Suitable for work platforms in low headroom situations such as road construction and railway bridges.
- Ground foundation construction method
Birth of a multi-driver compatible with hard rock formations! High-speed drilling with a hydraulic casing pipe drilling device!
- Ground foundation construction method
A system and construction that can be optimized according to site conditions using down-the-hole drilling!
- Ground foundation construction method
We can secure heavy machinery scaffolding such as cranes necessary for water construction in inland areas like dam lakes, rivers, and ponds!
- Ground foundation construction method
It is also used in construction to protect cities from flooding caused by guerrilla rainstorms! It is utilized in the construction of vertical shafts for access tunnels.
- Ground foundation construction method
Huh! Are you going to leave that steel plate behind? What a waste!
- Ground foundation construction method
[NETIS Registration] Introducing the main construction achievements of the mini-wall method!
- Ground foundation construction method
- Civil Engineering Method
[NETIS Registration] Compatible with narrow sites! A construction method that allows for a maximum depth of 20m using compact machinery!
- Ground foundation construction method
- Civil Engineering Method
Basic information on the mini wall construction method and various case studies are included! It can accommodate narrow sites and can achieve a maximum depth of 20m with small machinery!
- Ground foundation construction method
- Other earthworks, foundation works, and exterior floors
A ground continuous wall method that can accommodate narrow sites and allows for construction at a maximum depth of 20 meters with small machinery. It can also be adapted for permanent retaining walls...
- Ground foundation construction method
- Other earthworks, foundation works, and exterior floors
Don't you think it's natural to leave steel sheet piles in place during construction near sewer pipes? With this method, you can safely extract the steel sheet piles and suppress subsidence.
- Ground foundation construction method
"Over 850 construction achievements" The 'GEOTETS method' ensures no underground obstacles are left due to abandonment (burial)! It minimizes impact on the surrounding area and also addresses soil con...
- Ground foundation construction method
Announcement of Participation in the Railway Technology Exhibition 2021 [GEOTETS Method]
We will be exhibiting at the Railway Technology Exhibition 2021 held at Makuhari Messe. [Over 400 construction achievements] This is an opportunity to learn more about the 'GEOTETS method' that leaves no underground obstacles due to abandonment (burial)! We look forward to your visit!
No underground obstacles will be left behind due to abandonment (entombment)! The 'GEOTETS method' is effective in such areas.
- Ground foundation construction method
- Civil Engineering Method
- Earth retaining wall/foundation reinforcement
A technology that allows for the safe extraction of steel sheet piles even in locations close to railways: "GEOTETS Method."
The "GEOTETS Method" is a construction technique that allows for simultaneous filling while pulling out from pre-installed filling pipes into the voids created by the extraction process. It highly suppresses ground displacement, enabling safe extraction of retaining materials. In recent years, due to the frequent occurrence of major disasters caused by heavy rain, this method has seen an increase in usage as a countermeasure that does not create water channels in retaining works for rivers and reservoir embankments, and it can also be implemented underwater. In soil contamination countermeasure projects, a two-year groundwater monitoring period is required after the completion of the work, which prevents the extraction of retaining materials. By adopting this method, which has the function of a waterproof wall, retaining materials can be removed early, leading to cost reductions. Additionally, we will be exhibiting at the "Sewerage Exhibition '21 Osaka" to be held at Intex Osaka from August 17 (Tuesday) to August 20 (Friday), 2021. We sincerely look forward to your visit.
The recycled and reused steel sheet piles exceed 86,000 tons. It is a construction method that prevents loosening of the surrounding ground when extracting steel sheet piles!
- Ground foundation construction method
- Civil Engineering Method
- Earth retaining wall/foundation reinforcement
A new method that changes the common understanding of existing pile extraction (pile pulling) construction!
- Ground foundation construction method
By constructing the foundations of various pillars with EPS, we achieve lightweight design and significant reduction in construction time!
- Ground foundation construction method
Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Even if the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Renovation and repair methods
- Ground foundation construction method
- Road construction
An example of quickly correcting the unevenness in the concrete pavement slab of a highway toll booth!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Performed correction of the toll booth subsidence! Partial corrections were also carried out in areas where there was a step difference with the U-shaped drainage ditch.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Conducted resin injection work while managing levels! A case completed in 4 days.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Repairing the apron step and gaps without removing the apron! A case where our method was adopted.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Correction of road surface irregularities in a short construction period! Introducing examples of port facility repair work.
- Renovation and repair methods
- Harbor Construction
- Ground foundation construction method
Maximum settlement of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
The ground floor slab has sunk due to the earthquake! A case study of improvements made to the gaps between the floor and walls, and between the walls and ceiling.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Our method, which raises the CO pavement slab using the foaming pressure of rigid urethane resin, has been adopted!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Settlement correction while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Forklift operation is possible immediately after construction completion! The unevenness caused by the earthquake has been corrected in a short period.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
It is possible to correct subsidence in a short period without damaging the floor! Here are examples of corrections made without moving the cargo.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method
Correction during nighttime while business is suspended! A case of correcting floor sag due to ground subsidence in a short construction period.
- Renovation and repair methods
- Ground foundation construction method
- Civil Engineering Method