Ground reinforcement using low-noise ETP-G method for urban development | Geotech
Ground reinforcement work
Safe construction with low noise and low vibration even in narrow and densely populated areas. ETP-G method.
In urban development, ground reinforcement work requires consideration of limited sites and surrounding environments, with an emphasis on noise and vibration suppression and ensuring safety for adjacent buildings. GeoTech's ETP-G method is a rotary driven steel pipe pile method equipped with a disc-shaped enlarged wing and drilling assist bit at the tip, achieving high-quality construction without impacting the neighboring environment even in narrow or deformed sites. Since it does not use cement milk, there is no generation of dust or mud splashes, keeping the site clean. With a compact and powerful dedicated construction machine, low-noise and low-vibration construction is possible even in areas where heavy machinery is difficult to access. It can accommodate a wide range of applications, such as small buildings with three stories or less and a height of 13 meters or less, as well as retaining walls, allowing for optimal specifications to be selected. GeoTech provides peace of mind to all parties involved through a consistent management system from preliminary surveys to construction and quality assurance. 【Usage Scenarios】 - Construction of buildings on small urban lots - Ground improvement in densely populated residential areas - Retaining wall installation work - Ground reinforcement associated with the expansion of existing buildings 【Benefits of Implementation】 - Reduces noise and vibration impact on neighbors - Maintains a clean site without dust or mud splashes - Enables construction in areas where heavy machinery is difficult to access - Ensures high-quality bearing capacity, improving building safety - Contributes to shortening construction periods
Inquire About This Product
basic information
【Features】 - Compatible with narrow sites and densely populated residential areas using compact construction machinery and low noise/low vibration technology. - Achieves smooth propulsion through a special structure that prevents axis wobble during rotary penetration. - No concerns about dust or mud splashes as it does not use cement milk. - Utilizes a compact and powerful dedicated construction machine. - Applicable to small-scale buildings and retaining walls up to 3 stories and 13 meters in height. 【Our Strengths】 Geotech provides "total ground services," offering a one-stop solution for all ground-related tasks, including ground surveys, reinforcement design, and construction during new building projects, as well as settlement correction for existing buildings and soil contamination investigations. With extensive experience and reliable technology, we create the future of cities from the ground up.
Price information
Delivery Time
Applications/Examples of results
This construction method is ideal for small-scale buildings such as single-family homes and apartments that are three stories or less (under 13 meters in height and under 1,500 square meters in total floor area), as well as for ground reinforcement of retaining walls and structures under 3.5 meters in height. It is particularly effective in narrow sites or irregularly shaped land where the transport of large machinery is difficult, and in urban areas where residential buildings are adjacent during reconstruction work. Additionally, since it is a no-excavation method that does not use cement solidifiers, it is widely utilized in construction sites that want to maintain cleanliness around the site, avoid noise and vibration complaints from nearby residents, and minimize environmental impact in environmentally conscious building projects.
catalog(3)
Download All Catalogs
Company information
-


![Ground reinforcement work ETP method [Certified method]](https://image.www.ipros.com/public/default/object/noimage_l.gif?w=280&h=280)


![Ground reinforcement work [Performance certification method] Σ-i method](https://image.www.ipros.com/public/product/image/321794/IPROS17689074750660876182.png?w=280&h=280)




![[Cart Customization Support] Blind spot confirmation that can be installed on any bridge inspection cart.](https://image.www.ipros.com/public/product/image/2101191/IPROS10664339049652487136.png?w=280&h=280)
