Support the important house with pillars of improvement.
A method of injecting and mixing cement milk (a mixture of cement-based solidifying material and water) into soft ground to create columnar improved piles underground. This method is applicable when the soft layer extends from GL-2.0m to approximately GL-8.0m. However, it is not applicable in cases where most of the soft layer consists of humus soil, where industrial or household waste is accumulated, where there is groundwater, or where buildings are constructed immediately after earthworks on former marshland. Good ground for determining the improvement depth is defined as a continuous layer of cohesive soil with an N value greater than 3, or granular soil with an N value greater than 4.
Inquire About This Product
basic information
The construction period is usually 1 to 2 days. Low noise and low vibration construction will not disturb the neighbors. The cement-based solidifying material is inorganic and non-polluting.
Price range
Delivery Time
Applications/Examples of results
It is widely used for foundation reinforcement in detached houses.
Detailed information
-

Ground reinforcement work can be broadly classified into ground improvement, which solidifies the weak ground itself, and methods that involve driving pre-made piles.
catalog(1)
Download All CatalogsCompany information
-


![Ultra Column Method NEO [A Ground Improvement Method Realizing Low Residual Soil]](https://image.www.ipros.com/public/product/image/c3f/2000374163/IPROS74433517026733368557.jpeg?w=280&h=280)
![Ground reinforcement work [Performance certification method] Cross-wing column method](https://image.www.ipros.com/public/product/image/321794/IPROS4293062677374440758.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] Pure pile method](https://image.www.ipros.com/public/product/image/321794/IPROS13021923202802504447.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] DM method](https://image.www.ipros.com/public/product/image/321794/IPROS7365441545588568100.png?w=280&h=280)
![Ground reinforcement work [Performance certification method] Σ-i method](https://image.www.ipros.com/public/product/image/321794/IPROS17689074750660876182.png?w=280&h=280)
![Ground reinforcement construction [Performance certification method] RES-P method](https://image.www.ipros.com/public/product/image/321794/IPROS6263428337976322716.png?w=280&h=280)