iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36493items
    • Facilities
      Facilities
      58408items
    • Lighting and Interior
      Lighting and Interior
      17615items
    • Common materials
      Common materials
      37190items
    • Civil Engineering Materials
      Civil Engineering Materials
      10252items
    • Construction, work and methods
      Construction, work and methods
      29172items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29620items
    • IT/Software
      IT/Software
      33717items
    • others
      others
      92099items
    • Store and facility supplies
      Store and facility supplies
      4632items
    • Office and commercial supplies
      Office and commercial supplies
      11759items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1059items
    • Logistics Equipment
      Logistics Equipment
      7382items
    • Energy and Resources
      Energy and Resources
      11963items
  • Search for companies by industry

    • Information and Communications
      7299
    • others
      7221
    • Building materials, supplies and fixtures manufacturers
      6661
    • Service Industry
      4787
    • Trading company/Wholesale
      3096
    • Other construction industries
      2456
    • Electrical equipment construction business
      748
    • Construction Consultant
      635
    • General contractors and subcontractors
      564
    • Interior Design
      520
    • Facility Design Office
      487
    • Housing manufacturers and construction companies
      414
    • Architectural design office
      364
    • retail
      363
    • Warehousing and transport related industries
      331
    • Building Management
      298
    • Electricity, Gas and Water Industry
      286
    • Interior construction business
      281
    • Medical and Welfare
      278
    • Educational and Research Institutions
      255
    • Renovation and home construction industry
      225
    • Water supply and drainage construction business
      202
    • Transportation
      178
    • Real Estate Developers
      168
    • Fisheries, Agriculture and Forestry
      136
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      33
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Property Owner
      9
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • General contractors and subcontractors
  • Interior Design
  • Facility Design Office
  • Housing manufacturers and construction companies
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Building Management
  • Electricity, Gas and Water Industry
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Property Owner
  • Store and building owners
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction Works
  5. Pile and foundation work
  6. Construction of narrow street piles on a simple pier using the 'SPACE21 Method'

Construction of narrow street piles on a simple pier using the 'SPACE21 Method'

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Jun 25, 2026

松村組 本社
松村組 本社
  • Special site
  • Official site

[Installation of cranes on the opposite bank not allowed] A compact machine moves autonomously on a simple pier. Four cases of safely driving steel pipe piles at a site with scaffold restrictions.

This is a case study of foundation pile construction from a temporary bridge in the urban planning road construction of the Keikai Line. Due to environmental restrictions around the site, it was impossible to set up a large crane on the opposite bank, so a temporary bridge was established over the water surface, and construction had to be carried out from there. In response to the scaffold constraints, the "SPACE21 method" was introduced. ■ Space-saving: With a lightweight and compact design starting at 5.1 tons, safe transportation and placement are possible even on a temporary bridge with limited load capacity. ■ Cost reduction: Since large pile-driving machinery is not required, the scale of the bridge itself and temporary costs for reinforcement can be minimized, thereby controlling costs. ■ Improved construction efficiency: Even on a narrow temporary bridge, the self-propelling function allows the machine to move smoothly between piles, shortening the work process. ■ Wide adaptability: For steel pipe piles with a diameter of 600mm and a length of 29.5m, reliable insertion is achieved through a three-piece splicing method tailored to the site conditions. ■ Proven track record: In street improvement projects commissioned by Ishikawa Prefecture, high-quality construction was completed while overcoming the scaffold challenges where large machinery could not enter. *For more details, please download the materials or feel free to contact us.

    Pile and foundation work
13.png

Construction of narrow street piles on a simple pier using the 'SPACE21 Method'

13.png
13.png
  • Related Link - https://www.matsumura-gumi.co.jp/technology/kiso_j…
  • Special site - Product/service details - https://pr.www.ipros.com/matsumura-gumi/product/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

For more details, please download the materials or feel free to contact us.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

For more details, please download the materials or feel free to contact us.

catalog(3)

Download All Catalogs
SPACE21 Design and Construction Manual

SPACE21 Design and Construction Manual

MANUAL
  • E-book viewing
  • Catalog download

Contact this catalog

Hydraulic Full Rotation Prefabricated Pile Boring Method "SPACE21 Method"

Hydraulic Full Rotation Prefabricated Pile Boring Method "SPACE21 Method"

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Application examples of the 'SPACE21 method' for the construction of prefabricated piles under conditions such as low space and narrow locations.

Application examples of the 'SPACE21 method' for the construction of prefabricated piles under conditions such as low space and narrow locations.

TECHNICAL
  • E-book viewing
  • Catalog download

Contact this catalog

Company information

松村組

松村組 本社

General contractors and subcontractors

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

Matsumura Corporation is a general contractor under Prime Life Technologies, Inc., which was established through the business integration of Panasonic and Toyota Motor Corporation in the housing and construction sector. With the motto of "Changing the Norms of Construction," we aim for future-oriented urban development. We engage in a wide range of business activities, including contracting construction work, planning, design, supervision, and construction consulting services. We will continue to strive for further technical refinement, quality improvement, and enhanced after-sales service, working company-wide to meet the increasingly diverse and sophisticated needs of our customers. For any construction planning inquiries, please feel free to consult with us. Prime Life Technologies, Inc. was established in January 2020 as a company aiming for future-oriented urban development through the "fusion of lifestyle and technology." *Subsidiaries of Prime Life Technologies, Inc. include: Panasonic Homes, Toyota Home, Misawa Homes, Panasonic Construction Engineering, and Matsumura Corporation.

Product/Service List (18)

Popular products in related categories

Construction of narrow street piles on a simple pier using the 'SPACE21 Method'
Construction, work and methods
Construction of narrow street piles on a simple pier using the 'SPACE21 Method'
松村組 本社
Solar panel mounting and pile installation [*Integrated manufacturing and construction system*]
Facilities
Solar panel mounting and pile installation [*Integrated manufacturing and construction system*]
大津鉄工
Construction of temporary platform piles for the Dotonbori River promenade using the "SPACE21 method."
Construction, work and methods
Construction of temporary platform piles for the Dotonbori River promenade using the "SPACE21 method."
松村組 本社
Piling construction on the closure beam under the elevated bridge using the "SPACE21 method."
Construction, work and methods
Piling construction on the closure beam under the elevated bridge using the "SPACE21 method."
松村組 本社
Pile construction under the restriction of optical cable air head 'SPACE21 Method'
Construction, work and methods
Pile construction under the restriction of optical cable air head 'SPACE21 Method'
松村組 本社

Related New Products

Ground reinforcement Category A (ground improvement, ground foundation, pile foundation)
Construction, work and methods
Ground reinforcement Category A (ground improvement, ground foundation, pile foundation)
ジオテック
Ground reinforcement work | Building environmentally friendly foundations using DM method with recycled materials.
Construction, work and methods
Ground reinforcement work | Building environmentally friendly foundations using DM method with recycled materials.
ジオテック
Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.
Construction, work and methods
Ground reinforcement work | Optimizing the entire construction process with the DM method to achieve a shortened construction period.
ジオテック
Ground reinforcement work | A reliable structure that prevents differential settlement accidents of buildings using the high-support capacity DM method.
Construction, work and methods
Ground reinforcement work | A reliable structure that prevents differential settlement accidents of buildings using the high-support capacity DM method.
ジオテック
Ground reinforcement work | Preventing nearby site troubles with low-noise, no-dumping DM method.
Construction, work and methods
Ground reinforcement work | Preventing nearby site troubles with low-noise, no-dumping DM method.
ジオテック

The related categories of Pile and foundation work

  • Construction, work and methods
  • Construction Works
  • Pile and foundation work
Find products and companies by related keywords
  • #Construction
  • #Pile construction
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.