Milling Mall Method Construction Case: Edogawa Left Bank Area Sewer Pipe Construction Work
All-rounder in construction work! A case study of soil cutting for an inserted caisson.
This is an introduction to the construction achievements of the Edo River Left Bank Drainage Area Sewer Pipe Construction Project. During the construction of the lower section (φ1350mm mud water method, executed by another company), there was a hard soil-like obstacle that caused damage to the bit, leading to a design change at the site. To safely carry out the launch and arrival, a pressure-in caisson wall (originally planned to be unreinforced, but actually contained some reinforcement) was cut to L=0.9m on the launch side and L=0.3m on the arrival side. 【Construction Case】 ■ Project Name: Edo River Left Bank Drainage Area Sewer Pipe Construction (Ichikawa Main Line Section 502-2) ■ Client: Chiba Prefecture Edo River Sewer Office ■ Contractor: Hodota Corporation ■ Pipe Diameter: 1350mm ■ Pushing Length: 142.921m ■ Soil Type: Sandy soil and clayey soil ■ N Value/Gravel Ratio/Maximum Gravel Diameter: N=Average 18.5 ■ Construction Period: Daytime construction (8h) (10h during cutting) 2.5 months (2014.12.01 – 2015.2.13) ■ Type of Obstacle: Soil of the pressure-in caisson (Launch side L=0.9m, Arrival side L=0.3m) (Not detected this time, assumed to be H steel of SMW) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Milling Mall Method: Four Special Functions】 ◎ Exploration: Detecting metal obstacles ahead while advancing the excavation. ◎ Improvement: Ground improvement from within the excavation machine before and after the obstacles. ◎ Cutting: Crushing and discharging metal obstacles into fragments. ◎ Guidance: Guiding the excavation machine to the designated position of the vertical pile. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.