Milling Mall Method Construction Case: Supply Work for the Nishishinbashi 1-Chome Project
All-rounder for construction work! Cutting 8 pieces of obstacle H300 at 4 locations!
This is an introduction to the achievements of the new construction work for the Hibiya Route tunnel as part of the Nishishinbashi 1-chome project supply work. After starting, we cut the first obstacle H300 at about 10 meters, and then continued to cut the second and third H300 obstacles at intervals of about 2 meters. We planned to cut the remaining three H300 obstacles before reaching the destination. However, in reality, we only cut up to the third obstacle from the beginning, and we did not encounter the remaining three obstacles (H300). 【Construction Case】 ■ Project Name: New construction work for the Hibiya Route tunnel as part of the Nishishinbashi 1-chome project supply work (Part 1) ■ Client: Marunouchi Thermal Supply Co., Ltd. ■ Contractor: Takeuchi Civil Engineering Co., Ltd. ■ Pipe Diameter: 2000 ■ Pushed Length: 78.30 m ■ Soil Type: Sandy Silt ■ N Value/Gravel Rate/Maximum Gravel Diameter: N=2 G=0% φmax=0mm ■ Construction Period: 2011.12.11 to 2012.2.8 (2 months) ■ Type of Obstacles: H-300, 4 locations, 8 pieces * For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Milling Mall Method: 4 Special Functions】 ◎ Exploration: Detecting metal obstacles ahead while advancing the excavation ◎ Improvement: Ground improvement from inside the excavation machine before and after the obstacles ◎ Cutting: Crushing and discharging metal obstacles ◎ Guidance: Guiding the excavation machine to the designated position of the vertical pile *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
Metal fragments that were discharged and attached to a circular magnet.
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.