Milling Mall Method Construction Case: Reconstruction near Kasumigaseki 2-chome Part 2 Project
Cutting unexpected H-beams in six locations! A case study of construction work for thrusting on a heavily trafficked main road.
This is an introduction to the construction achievements of the reconstruction project near Nagatacho 1-chome and Kasumigaseki 2-chome, Chiyoda Ward, Phase 2. Initially, there was a possibility of two locations with reinforced concrete in the thrust pipeline section, and the thrust construction was conducted on a heavily trafficked main road. As a result of the construction, after cutting the reinforced concrete at two locations, we encountered unexpected obstacles. The unexpected obstacles were H-beams measuring H250 to H350, and we subsequently cut through six unexpected H-beams. 【Construction Case】 ■ Project Name: Reconstruction Project near Nagatacho 1-chome and Kasumigaseki 2-chome, Chiyoda Ward, Phase 2 ■ Client: Tokyo Metropolitan Sewerage Bureau ■ Contractor: Muramoto Construction Co., Ltd. Tokyo Branch ■ Pipe Diameter: 1500 ■ Thrust Length: 94.700 m ■ Soil Type: Clay ■ N Value/Gravel Ratio/Maximum Gravel Diameter: N=1-2 G=0% φmax=0mm ■ Construction Period: April 2015 to August 2015 (3.5 months) ■ Type of Obstacles: Reinforced concrete 2m thick at 2 locations Unexpected obstacles H-beams H-250 to H-350 at 6 locations *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
"Milling Mall Method: Four Special Functions" ◎ Exploration: Detecting metal obstacles ahead while advancing the excavation ◎ Improvement: Ground improvement from inside the tunneling machine before and after the obstacles ◎ Cutting: Crushing and discharging metal obstacles ◎ Guidance: Guiding the tunneling machine to the designated position of the vertical pile *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.