Cutting examples of ultra-soft soil! Use of connectable synthetic pipes, equipped with a meandering correction device for the tunneling machine.
This is an introduction to the construction achievements of the Shinagawa Ward Kitashinagawa MAKP750A main construction project (Sankyo Bridge Phase III). Initially, there was a possibility of steel sheet piles Type III and H-400 existing in the push pipe section, and it was also a river crossing push construction. It was difficult to remove obstacles from the ground, and due to the construction of ultra-soft soil, careful consideration was required. All push pipes used were synthetic pipes that could be connected, and the tunneling machine was equipped with two meandering correction devices for construction. As a result of the construction, there were no steel sheet piles Type III or H-400, and two wooden piles of approximately 250mm were cut. 【Construction Case】 ■ Project Name: Shinagawa Ward Kitashinagawa MAKP750A Main Construction Project (Sankyo Bridge Phase III) ■ Client: Tokyo Gas Co., Ltd. ■ Contractor: Nippon Steel & Sumitomo Metal P&E Corp. ■ Pipe Diameter: 900 ■ Push Length: 40.966m ■ Soil Type: Sandy silt ■ N Value/Gravel Rate/Maximum Gravel Diameter: N=0 G=0% φmax=0mm ■ Construction Period: May 2015 to July 2015 (1.5 months) ■ Type of Obstacles: Wooden piles approximately φ250mm × 2 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Milling Mall Method 4 Special Functions】 ◎ Exploration: Detecting metal obstacles ahead while advancing the excavation ◎ Improvement: Ground improvement from within the excavation machine before and after the obstacles ◎ Cutting: Crushing and discharging metal obstacles ◎ Guidance: Guiding the excavation machine to the designated position of the vertical pile *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.