Milling Mall Method Construction Case: Sanjiyachishima Main Line Diversion Pipe Construction Project
Cutting at three locations in Matsuhang! Responding with forward exploration using electromagnetic waves and excavation management with a data logger.
This document introduces the construction achievements of the construction work for the Sangenya Chishima main line diversion pipe in Osaka City. Due to the presence of obstacles in the form of wooden piles, forward exploration using electromagnetic waves and excavation management using data loggers were conducted. Since the obstacles were wooden piles, no increase in excavation torque or thrust was observed, and the presence or absence of obstacle cutting was confirmed by the discharge of wood chips. 【Construction Case】 ■ Project Name: Sangenya Chishima Main Line Diversion Pipe Construction (Part 1) ■ Client: Osaka City Construction Bureau ■ Contractor: Kitabume Corporation ■ Pipe Diameter: 800 ■ Pushing Length: 127.61m ■ Soil Type: Sand and Silt ■ N Value/Gravel Ratio/Maximum Gravel Diameter: N=7 G=0% φmax=0mm ■ Construction Period: July 2, 2013 – August 10, 2013 (1 month) ■ Type of Obstacle: Wooden Piles φ150×3 pieces *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Milling Mall Method: Four Special Functions】 ◎ Exploration: Detecting metal obstacles ahead while advancing the excavation. ◎ Improvement: Ground improvement from inside the tunneling machine before and after the obstacles. ◎ Cutting: Crushing and discharging metal obstacles into pieces. ◎ Guidance: Guiding the tunneling machine to the designated position of the vertical pile. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
Discarded wire pieces (φ16) and gravel
catalog(2)
Download All CatalogsCompany information
Yasuda Engineering Co., Ltd. has been a specialized company in public sewer construction, contributing to the environmental development of the local community since its establishment in 1975. We have pursued sound management and advanced technical capabilities, continuing to make steady progress. In 2001, we acquired the international standard "ISO9001" and expanded into the field of general civil engineering. We aim to be a corporate group capable of continuous innovation as a comprehensive construction company, including building construction. "Honing our technology with rich sensibility, we evaluate from a fair perspective to enhance the vitality of the company in order to meet our customers' needs." This is the management policy of Yasuda Engineering Co., Ltd. We, Yasuda Engineering Co., Ltd., are committed to uniting all employees to refine our technical skills and create a new future.