iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      35537items
    • Facilities
      Facilities
      56660items
    • Lighting and Interior
      Lighting and Interior
      17273items
    • Common materials
      Common materials
      37011items
    • Civil Engineering Materials
      Civil Engineering Materials
      9533items
    • Construction, work and methods
      Construction, work and methods
      27653items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      30352items
    • IT/Software
      IT/Software
      31825items
    • others
      others
      84507items
    • Store and facility supplies
      Store and facility supplies
      4358items
    • Office and commercial supplies
      Office and commercial supplies
      11463items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      952items
    • Logistics Equipment
      Logistics Equipment
      7378items
    • Energy and Resources
      Energy and Resources
      11606items
  • Search for companies by industry

    • Information and Communications
      7198
    • others
      6979
    • Building materials, supplies and fixtures manufacturers
      6683
    • Service Industry
      4607
    • Trading company/Wholesale
      2996
    • Other construction industries
      2455
    • Electrical equipment construction business
      642
    • Interior Design
      528
    • Facility Design Office
      492
    • Construction Consultant
      464
    • Architectural design office
      361
    • retail
      345
    • Warehousing and transport related industries
      321
    • Electricity, Gas and Water Industry
      290
    • General contractors and subcontractors
      288
    • Interior construction business
      274
    • Medical and Welfare
      272
    • Educational and Research Institutions
      258
    • Building Management
      253
    • Renovation and home construction industry
      224
    • Water supply and drainage construction business
      204
    • Housing manufacturers and construction companies
      187
    • Transportation
      160
    • Real Estate Developers
      155
    • Fisheries, Agriculture and Forestry
      124
    • Structural Design Office
      66
    • Finance, securities and insurance
      35
    • Restaurants and accommodations
      29
    • self-employed
      29
    • Mining
      26
    • Public interest/special/independent administrative agency
      18
    • Police, Fire Department, Self-Defense Forces
      18
    • Store and building owners
      9
    • Property Owner
      8
    • Government
      8
    • Individual
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Interior Design
  • Facility Design Office
  • Construction Consultant
  • Architectural design office
  • retail
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • General contractors and subcontractors
  • Interior construction business
  • Medical and Welfare
  • Educational and Research Institutions
  • Building Management
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Housing manufacturers and construction companies
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Property Owner
  • Government
  • Individual
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. Facility Design Office
  3. 東京テクノ
  4. Product/Service List
Facility Design Office
  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

東京テクノ

EstablishmentMay 1997
capital1000Ten thousand
number of employees20
addressTokyo/Machida-shi/3731-6 Aihara Town
phone042-783-8353
  • Official site
last updated:Mar 10, 2025
東京テクノlogo
  • Contact this company

    Contact Us Online
  • Company information
  • Products/Services(54)
  • catalog(3)
  • news(0)

東京テクノ List of Products and Services

  • category

1~45 item / All 54 items

Displayed results

class="retina-image"

[Construction Example] Underground Obstacle Removal using Multi-Drill Method

Introduction of the original tool "Kachi Waku-kun"! Pile removal work using the multi-drilling method.

We would like to introduce a case study of underground obstacle removal conducted by our company. At a site in Honmoku, Yokohama City, an existing PHC pile with a depth of 28m and a diameter of 600mm broke during extraction, leading to a request for underground obstacle removal from our company. Using our original tool "Kachi-Wakukun," we performed the removal using a casing with a diameter of 1,000mm and the all-casing method with the SR-45 multi-drill excavator. 【Project Overview】 ■ Project Name: Introduction of "Kachi-Wakukun" and pile removal using the multi-drill method ■ Construction Date: September 27, 2023 ■ Location: Yokohama City, Kanagawa Prefecture *For more details, please refer to the related links or feel free to contact us.

  • Other civil engineering works
  • Other earthworks, foundation works, and exterior floors
  • Drilling Machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Sagamihara City, Midori Ward T Column Method (Deep Mixing Method)

There are original construction machines and unique construction methods! An example using a 30t silo with the T-column method.

We would like to introduce a case study of the ground improvement work we have conducted. In Midori Ward, Sagamihara City, we implemented our original T-column method (deep mixing method). This was carried out using a newly purchased 30t silo. Our company has original construction equipment and unique methods, and we have numerous achievements. You can find more details about the case in the related links. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Midori Ward, Sagamihara City ■ Construction Date: December 22, 2021 ■ Location: Midori Ward, Sagamihara City ■ Details: Φ1000 L=10.0m 173 pieces *For more information, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] T-Column Method (Deep Mixing Method) in Machida City, Tokyo

Leave your foundation construction work to us! Excavation length of 9.0m, with 120 construction sites as examples.

We would like to introduce a case study of the ground improvement work we conducted. In Machida City, Tokyo, we implemented our original T-column method (deep mixing method). The excavation depth was 9.0 meters, with 120 construction locations, and a silo for the solidifying agent was installed for the work. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Machida City, Tokyo ■ Construction Date: October 9, 2021 ■ Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-Column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of piles with a small diameter of Φ800mm and a large diameter of Φ1300mm *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] T Column Method, Odawara City, Kanagawa Prefecture

Introducing a case of ground improvement work conducted in Odawara City, Kanagawa Prefecture on September 30, 2021!

We would like to introduce a case study of ground improvement work conducted by our company. We performed our original deep mixing method, the T-column method (Construction Technology Examination Certification), on the site of a factory located in Odawara City, Kanagawa Prefecture. We have provided images along with this case study in the related links, so please take a look. 【Case Overview】 ■Project Name: T-column Method in Odawara City, Kanagawa Prefecture ■Construction Date: September 30, 2021 ■Location: Odawara City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Ground Improvement using Deep Mixing Method (T-Column Method)

Construction case of columnar improvement work at the ground with 170 piles of diameter Φ160 at 3 locations!

Here is an introduction to a case study of ground improvement work conducted by our company. In Machida City, Tokyo, the columnar improvement work for the newly created Tokiwa Ground within the Obirin Gakuen Machida Campus has begun, utilizing the original method "T-Column Method," which has obtained technical examination certification and is based on deep mixing treatment technology. This project involved columnar improvement work for the ground, special L-shaped retaining walls, and L-shaped retaining walls. 【Case Overview】 ■ Project Name: Ground Improvement using Deep Mixing Treatment (T-Column Method) ■ Construction Date: September 3, 2020 ■ Location: Tokiwa Town, Machida City, Tokyo ■ Details: Pile diameter Φ160, total of 170 piles *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Nihonbashi, Chuo Ward, Tokyo T-Column Method (Deep Mixing Method)

We will introduce a case where the T-column method was implemented in a strict and narrow area to improve φ1000.

We would like to introduce a case study of the ground improvement work we conducted. In Nihonbashi, Chuo Ward, Tokyo, we performed the T-column method (deep mixing method) using construction machine S-15. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Nihonbashi, Chuo Ward, Tokyo ■ Construction Date: June 5, 2021 ■ Location: Nihonbashi, Chuo Ward, Tokyo *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Atsugi City Surface Improvement Using Mixing Bucket

Introducing a case of surface improvement associated with new construction work conducted in Atsugi City, Kanagawa Prefecture!

We would like to introduce a case study of ground improvement work carried out by our company. In Atsugi City, Kanagawa Prefecture, we performed surface improvement work associated with the new construction of the Atsugi Fire Station South Mohri Branch. A mixing bucket was attached to a 0.7 backhoe, and we mixed 162 tons of solidifying agent for an area of 893 m². 【Case Overview】 ■ Project Name: Surface Improvement in Atsugi City Using a Mixing Bucket ■ Construction Date: October 14, 2020 ■ Location: Nagase, Atsugi City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Cast-in-Place Pile Construction Using Full Circle Rotating All-Casing Method

Efficient and smooth construction with unique ingenuity! A case study of site foundation pile construction conducted in Machida City.

We would like to introduce a case study of the ground improvement work we conducted. We performed the construction of foundation piles for a public works project in Machida City using the full rotary all-casing method. We strive for efficient and smooth construction by implementing unique ideas tailored to the site conditions. 【Case Overview】 ■Project Name: Site-cast pile construction using the full rotary all-casing method in Machida City ■Construction Date: July 24, 2020 ■Location: Machida City, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City, Midori Ward T Column New Construction and Renovation Work

290 construction locations, excavation length of about 10m! A case of columnar improvement work using the T-column method.

We would like to introduce a case study of ground improvement work carried out by our company. In a vast area in Tsukui, Sagamihara City, we performed columnar improvement work using our original deep mixing method and T-column method. Due to the project involving 290 locations and an excavation depth of approximately 10 meters, we installed a 30-ton silo and plant for the solidifying material. Solidifying material was delivered daily, and the work was successfully completed. 【Case Overview】 ■ Project Name: T-Column New Construction and Renovation Work in Midori Ward, Sagamihara City ■ Construction Date: March 16, 2020 ■ Location: Chigira, Midori Ward, Sagamihara City *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] New Warehouse Construction Using T-Column Method

Carefully planned and constructed to match the building! Introducing examples from the construction site of a new warehouse.

We would like to introduce a case study of the ground improvement work we conducted. At the site of a new warehouse construction in Chigasaki City, Kanagawa Prefecture, we implemented our original deep mixing method and T-column method. The improvement diameters varied widely, with the largest being Φ1400mm and the smallest Φ800mm, totaling five types. We carefully planned and executed the work to match the building requirements. 【Case Overview】 ■ Project Name: Warehouse New Construction T-Column Method ■ Construction Date: September 30, 2019 ■ Location: Chigasaki City, Kanagawa Prefecture *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Underground Obstacles at Kuramae Building, Taito Ward

Introducing a case study of underground obstacle removal using the MD250 and SR-45 multi-drill excavators!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Taito Ward, Tokyo, we performed underground obstacle removal using the MD250 with a caterpillar width of 2990mm and the SR-45 multi-drill excavator. For the removal of underground obstacles with a casing diameter of Φ1000, construction machines with a caterpillar width of 3000mm or less are specialized and are effective in narrow spaces. 【Case Overview】 ■Project Name: Underground Obstacle Removal at Kuramae Building, Taito Ward ■Construction Date: September 4, 2019 ■Location: Kuramae, Taito Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal Work of Existing Foundation Piles on an Extremely Narrow Site of Approximately 56m2 2

Numerous construction achievements in narrow spaces! Introducing construction examples using the SR-45 multi-drill machine.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Kojimachi, Chiyoda Ward, Tokyo, we carried out the removal of existing foundation piles on a super small site of approximately 56m². The machinery used was the SR-45, and the construction was carried out using the multi-drill method. 【Case Overview】 ■ Project Name: Removal of Existing Foundation Piles on a Super Small Site of Approximately 56m² ■ Construction Date: September 13, 2022 ■ Location: Kojimachi, Chiyoda Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (8)

In the multi-drilling method, tools are selected and constructed according to the situation! Original tools are also developed.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 8 of our series on removed underground obstacles. For more details, please refer to the related links. Our company has also developed original tools, achieving significant results in various field situations. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (6)

Track record of construction in various fields! Consistent in-house construction is possible from ground surveys to ground improvement work.

On our company website, we introduce examples of underground obstacle removal projects. This page features Part 6 of our series on removed underground obstacles. For more details, please refer to the related links. Our company offers a comprehensive in-house service from ground surveys to ground improvement work. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (5)

Removal of underground obstacles, ground improvement work, and site preparation piles! For foundation work, please contact our company.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 5 of our series on removed underground obstacles. For more details, please refer to the related links. For foundation work such as underground obstacle removal, ground improvement work, existing pile extraction work, site development piles, retaining wall construction, and installation and removal of construction platforms, please contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (4)

Sudden underground obstacles! Various construction methods suitable for the site allow for the cutting, removal, and backfilling of underground obstacles.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 4 of our special on removed underground obstacles. For more details, please refer to the related links. If underground obstacles suddenly appear, please contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (3)

We have published a feature on underground obstacles! For your foundation work needs, please feel free to contact us.

On our company website, we introduce examples of underground obstacle removal projects. This page features Part 3 of our series on removed underground obstacles. For more details, please refer to the related links. For inquiries regarding foundation work, including underground obstacle removal, ground improvement work, existing pile extraction work, site preparation piles, earth retention work, and the installation and removal of construction platforms, please feel free to contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (2)

Many achievements in various situational sites! For underground obstacle removal work, please contact our company.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 2 of our special on removed underground obstacles. For more details, please refer to the related links. Please contact us for underground obstacle removal work. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles

For inquiries and requests regarding foundation work, please contact us! We feature underground obstacles that have been removed using our developed tools.

On our company website, we introduce case studies of underground obstacle removal. On this page, we feature underground obstacles that were removed using tools developed by our company. For more details, please check the related links. Additionally, we have included images of the removal status from January 2022, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] SR45 Multi-Drill Method 25m Underground Obstacle Removal

We are conducting a wide range of foundation work! Here is an example of underground obstacle removal carried out in Chigasaki City.

We would like to introduce a case of underground obstacle removal work conducted by our company as part of a public project. This was carried out in Chigasaki City. An underground obstacle was encountered around 10 meters, making it impossible to proceed with the Avoron method, which led to our receiving the request and securing the contract. For more details about this case, please check the related link. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method 25m Underground Obstacle Removal ■ Construction Date: October 28, 2021 ■ Location: Chigasaki City, Underground Obstacle Removal ■ Details: Φ800 GL-25m *For more information, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] SR45 Multi-Drill Method Underground Obstacle Removal

Introducing examples of smooth removal made possible by using our independently developed tools!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, where the Shinkansen runs nearby, we used the SR45 multi-drill to remove a site construction pile with a diameter of 1200 mm and a depth of 22 m. The removal of the site construction pile in a narrow area was extremely challenging, but by utilizing our uniquely developed Kelly grab, 3D bucket, and lightweight power jack, we were able to achieve a smooth removal. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method - Underground Obstacle Removal ■ Construction Date: September 11, 2021 ■ Location: Hon-Ishicho, Nihonbashi, Chuo-ku, Tokyo ■ Details: Diameter 1200 mm, Depth 22 m *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Inagi Enokido Underground Water Pipe Removal Work

The leader length can be freely changed depending on the height above ground! Here is an example using the MD250.

We would like to introduce a case of underground obstacle removal conducted by our company. In Inagi City, Tokyo, we carried out underground obstacle removal work due to low overhead clearance. The removal work is being performed using the MD250. By changing the length of the leader, it becomes possible to carry out underground obstacle removal work even under such low power lines. 【Case Overview】 ■ Project Name: Inagi Enokido Underground Water Pipe Removal Work ■ Construction Date: August 17, 2021 ■ Location: Inagi City, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Underground Obstacle Removal Work Using a Full Rotation Machine Φ2500

Maximum depth of 39m! Here is a case study of the removal of Φ400-600 PC piles that were present throughout the site.

We would like to introduce a case of underground obstacle removal that we conducted. The removal of existing piles was carried out using a Φ2500 full rotation machine on a vast site in Saiwaicho, Kanazawa Ward, Yokohama City. The removal of Φ400-600 PC piles, with a maximum depth of 39m and located throughout the site, was carried out over approximately two months using a 150t crane. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work using Φ2500 Full Rotation Machine ■ Construction Date: June 4, 2021 ■ Location: Kanagawa Prefecture, Yokohama City, Kanazawa Ward *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Chuo Ward, Tokyo, Nihonbashi - Underground Obstacle Removal Work in a Narrow Site

Achievements in responding to diverse site conditions! Here is an example of removing obstacles such as sleepers located 10 cm from the wall.

Here is an introduction to a case of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, we received a request for the removal of underground obstacles located 10 cm from an adjacent wall. It was a site with limited space for wall construction, but we used the multi-purpose pile driving and extraction machine MD250 to remove old obstacles such as railway sleepers. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project in Limited Space, Nihonbashi, Chuo-ku, Tokyo ■ Construction Date: May 15, 2021 ■ Location: Nihonbashi, Chuo-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Chuo Ward, Tokyo - Underground Obstacle Removal Work

Lifted using the multi-drill method! A case of removing obstacles made of hard random stones.

We would like to introduce a case of underground obstacle removal that we conducted. In a site adjacent to the Shuto Expressway in Chuo Ward, Tokyo, we removed hard "machishi" stones that were left under the old revetment. Using the multi-drill excavator SR-45, which has the capability to remove obstacles even in adjacent areas, we lifted the "machishi" stones using the multi-drill method. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Project, Chuo Ward, Tokyo ■ Construction Date: October 12, 2020 ■ Location: Nihonbashi Hamacho, Chuo Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal Work of Underground Continuous Walls in Niiza City, Saitama Prefecture

Using our original special gloves! A case of underground continuous wall removal in an underground space.

We would like to introduce a case of underground obstacle removal that we conducted. In Niiza City, Saitama Prefecture, we lowered the main machine, the SR-45 multi-drill, to the second basement level and carried out the removal of the underground continuous wall in the underground space. Using our original special grab, we removed the soil cement of the continuous wall and the core material of H steel measuring 400×200 using the multi-drill method. Finally, we divided the site construction piles into four parts for removal. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal Project in Niiza City, Saitama Prefecture ■ Construction Date: August 11, 2020 ■ Location: Niiza City, Saitama Prefecture *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Hamamatsu City, Shizuoka Prefecture - Removal of Columnar Improvement Piles

Leave your foundation construction work to us! A case of removing underground obstacles after the removal of 65 columnar improvement piles.

We would like to introduce a case of underground obstacle removal that we conducted. In a project in Hamamatsu City, Shizuoka Prefecture, we used the multi-drill excavator SR-45 to remove 65 columnar improvement piles with a diameter of 1200 mm using the multi-drill method. We have introduced this case with images in the related link, so please take a look. 【Case Overview】 ■ Project Name: Columnar Improvement Pile Removal Project in Hamamatsu City, Shizuoka Prefecture ■ Construction Date: June 19, 2020 ■ Location: Nishi Ward, Hamamatsu City, Shizuoka Prefecture *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Removal of Underground Obstacles in Minato Ward & 30m Foundation Pile Driving Work

Feel free to consult us if you are in trouble! Here is an example of a case where we encountered underground obstacles and received a removal request.

We would like to introduce a case of underground obstacle removal conducted by our company in Takanawa, Minato-ku, Tokyo. During the construction using the Aboron method, we encountered an underground obstacle at a depth of 18 meters, which made it impossible to continue the work, leading to a request for removal from our company. Using the multi-drill excavator SR-45, we performed the underground obstacle removal with the multi-drill method, and after the obstacle was removed, we also carried out the installation of the foundation piles for the tower crane, measuring 350×350H. [Case Overview] ■ Project Name: Underground Obstacle Removal & 30m Foundation Pile Installation in Minato-ku ■ Construction Date: March 11, 2020 ■ Location: Takanawa, Minato-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Inzai City, Chiba Prefecture - Removal Work of Underground Continuous Walls at New Construction Site

Please leave the ground improvement work and ground surveys to us! An example of underground continuous wall removal.

We would like to introduce a case of underground obstacle removal that we conducted. This was carried out at a new construction site in Inzai City, Chiba Prefecture. Using the SR-45 multi-drill drilling machine, we performed the removal of a cement milk and H-steel underground continuous wall using the multi-drill method. For more details about the case, please check the related link. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal at New Construction Site in Inzai City, Chiba Prefecture ■ Construction Date: February 8, 2020 ■ Location: Inzai City, Chiba Prefecture ■ Details: Core material H400×200, GL-16.0m *For more information, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Removal of Underground Obstacles in Soundproof House

Strong performance in narrow and low sites! Case study using the multi-drill rig MD250.

We would like to introduce a case of underground obstacle removal conducted by our company. In Jujo, Kita-ku, Tokyo, we carried out underground obstacle removal work using the multi-drill method inside an existing soundproof house with a ceiling height of 11.6m. We used the multi-drill excavator MD250 to perform the removal at a low headroom. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work Inside Soundproof House ■ Construction Date: December 9, 2019 ■ Location: Jujo, Kita-ku, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Work (Low-Headroom Slide Method)

Introducing a case of underground obstacle removal work using the low-altitude slide construction method!

We would like to introduce a case study of underground obstacle removal work carried out by our company. In Edogawa Ward, Tokyo, we successfully completed the removal of underground obstacles using the low headroom slide method, with a diameter of 1200 mm and a length of 48 m, under a height restriction of 5.8 m. This method allows for the removal of underground obstacles both under beams and within buildings. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work (Low Headroom Slide Method) ■ Construction Date: March 29, 2022 ■ Location: Edogawa Ward, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us with your requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Subsurface Obstacles March Part 2

Introducing actual underground obstacles! We have a proven track record in various situational sites.

On our website, we introduce case studies of underground obstacle removal. This page features the second installment of our special on underground obstacles removed in March 2022. For more details, please check the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size

Introducing a case of underground obstacle removal conducted on April 1, 2022!

On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools based on the situation and carries out the construction accordingly. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Full Rotation (Equivalent to BG) Underground Obstacle Removal

A case of removing various underground obstacles while protecting the wall of the hole!

We would like to introduce a case of underground obstacle removal that we conducted. In Atsugi City, Kanagawa Prefecture, we carried out underground obstacle removal work using a full-circle rotary all-casing method (equivalent to BG method). We removed various underground obstacles while protecting the borehole walls. We have introduced this case with images in the related links, so please take a look. 【Case Overview】 ■ Project Name: Full-Circle Rotary (BG Equivalent) Underground Obstacle Removal ■ Construction Date: April 2, 2022 ■ Location: Atsugi City, Kanagawa Prefecture ■ Details: φ1000 to φ1800, L=11 to 21m (68 pipes) *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we carried out the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly commenced work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Method in Tokyo (Equivalent to BG Method)

Original tools developed! Examples of removal using the all-casing crushing method.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nakano Ward, Tokyo, using an underground obstacle removal method equivalent to the BG method. It features the SR-45 standard mast specification. Piles that could not be removed using the pull-out method were taken out using the all-casing crushing method. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Method (Equivalent to BG Method) ■ Construction Date: May 19, 2022 ■ Location: Nakano Ward, Tokyo ■ Details: SR-45 standard mast specification, depth of 16m *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Multi-Drill Method Equivalent to BG Method

Select from various construction machines!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Tokyo, we carried out construction using a multi-drill method equivalent to the BG method. We removed PHC piles and pine piles with a diameter of 1500 mm and a length of 22 m. We have provided images of this case study in the related link, so please take a look. 【Case Overview】 ■ Project Name: Multi-drill Method Equivalent to BG Method ■ Construction Date: June 10, 2022 ■ Location: Tokyo ■ Details: Diameter 1500 mm, Length 22 m *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Work in an Extremely Narrow Site

Using MD250! We would like to introduce examples of successful construction achieved through our technology and track record.

We would like to introduce a case study of underground obstacle removal work that our company has conducted. In Bunkyo Ward, Tokyo, we carried out underground obstacle removal work on an extremely narrow site. Using the MD250, we worked in a challenging area with a site area of approximately 82m². Thanks to our multi-drill and the technology and achievements we have cultivated so far, the work was successfully completed. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work on an Extremely Narrow Site ■ Construction Date: June 28, 2022 ■ Location: Bunkyo Ward, Tokyo ■ Site Piling: Φ800, 13m, 6 pieces *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Underground Obstacle Removal Work for Pressure-resistant Slab

Introducing a case of underground obstacle removal conducted in Hachioji City, Tokyo on July 20, 2022!

We would like to introduce a case where we removed underground obstacles from a pressure-resistant slab in Hachioji City, Tokyo, using the multi-drill method (equivalent to BG method). During the construction, we used the "SR-45 multifunctional drilling machine multi-drill" manufactured by SoilMec, Italy. In the related link, we have introduced this case with images, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work for Pressure-Resistant Slab ■ Construction Date: July 20, 2022 ■ Location: Hachioji City, Tokyo *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Existing Foundation Piles in a Super-Narrow Site of Approximately 56m2

Numerous achievements in construction on narrow sites and along walls! Here are examples of construction using the multi-drill method.

We would like to introduce a case study of underground obstacle removal conducted by our company. In Kojimachi, Chiyoda-ku, Tokyo, we carried out the removal of existing foundation piles on a site of approximately 56m², which is extremely small. The machinery used was the SR-45, and the construction was performed using the multi-drill method. The multi-drill can be used for construction in extremely narrow sites where buildings are densely packed. For more details about this case, please check the related links. 【Case Overview】 ■ Project Name: Removal of existing foundation piles on a site of approximately 56m² ■ Construction Date: September 5, 2022 ■ Location: Kojimachi, Chiyoda-ku, Tokyo ■ Details: Φ1000 L=19.0m at 3 locations *For more information, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Wall Installation Using SR-45 Original Kelly Grab

We will introduce a case study using our original in-house developed tool, the special Kelly grab.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nihonbashi Bakurocho, Tokyo, involving wall-side construction. The site conditions were in a narrow area within the city. Using the SR-45 multi-drill excavator, we carried out the removal of the existing structure, employing our original tool, the special Kelly grab. 【Case Overview】 ■ Project Name: Wall-side construction using the SR-45 original Kelly grab ■ Construction Date: December 14, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Φ1000 L=3.5m at 15 locations *For more details, please download the PDF from the related link or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Underground structure removed with in-house developed Kelly grab.

We can handle wall-side construction in the city! Examples of efficient and safe removal are possible.

We would like to introduce a case study of underground obstacle removal conducted by our company. This involves the removal of a Φ1000 underground structure in Nihonbashi Bakurocho, Tokyo. Using our original Kelly grab developed in-house, we can achieve efficient and safe removal. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Removal of underground structure using our in-house developed Kelly grab ■ Construction Date: December 21, 2022 ■ Location: Nihonbashi Bakurocho, Tokyo ■ Details: Removal of Φ1000 underground structure *For more details, please download the PDF from the related links or contact us.

  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
Prev 12 Next
  • イプロスがリアル展示会を主催します! AI/DX 営業・マーケティング展 出展社募集中 リード数・商談数が止まらない!新しいリアル展示会を提供 会期 2026年3月24日(火)~25日(水) 会場 東京ビッグサイト東4ホール 出展概要資料を進呈!
    • Contact this company

      Contact Us Online

    Products

    • Search for Products

    Company

    • Search for Companies

    Special Features

    • Special Features

    Ranking

    • Overall Products Ranking
    • Overall Company Ranking

    support

    • site map
    IPROS
    • privacy policy Regarding external transmission of information
    • terms of service
    • About Us
    • Careers
    • Advertising
    COPYRIGHT © 2001-2025 IPROS CORPORATION ALL RIGHTS RESERVED.
    Please note that the English text on this page is automatically translated and may contain inaccuracies.