The leader length can be freely changed depending on the height above ground! Here is an example using the MD250.
We would like to introduce a case of underground obstacle removal conducted by our company. In Inagi City, Tokyo, we carried out underground obstacle removal work due to low overhead clearance. The removal work is being performed using the MD250. By changing the length of the leader, it becomes possible to carry out underground obstacle removal work even under such low power lines. 【Case Overview】 ■ Project Name: Inagi Enokido Underground Water Pipe Removal Work ■ Construction Date: August 17, 2021 ■ Location: Inagi City, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.


![[Construction Example] Underground structure removed with in-house developed Kelly grab.](https://image.www.ipros.com/public/product/image/324/2000928425/IPROS78541156820012753111.png?w=280&h=280)
![[Construction Case Studies] Special Feature on Removed Underground Obstacles (4)](https://image.www.ipros.com/public/product/image/0e0/2000934012/IPROS74461828820406738078.png?w=280&h=280)

![[Construction Case] Underground Obstacle Removal Work for Pressure-resistant Slab](https://image.www.ipros.com/public/product/image/4fe/2000928494/IPROS40408392079743249980.png?w=280&h=280)
![[Construction Case] Chuo Ward, Tokyo - Underground Obstacle Removal Work](https://image.www.ipros.com/public/product/image/a24/2000933825/IPROS60347262816364260767.png?w=280&h=280)

![[Super Soil Construction Case Study] Examples of Soil Improvement and Greening in Planting Work](https://image.www.ipros.com/public/product/image/48b/2000247935/IPROS4680848456193593409.jpg?w=280&h=280)
![[Compass PLUS Implementation Case] Hokuriku Regional Development Bureau Coastal Beach Nourishment Project](https://image.www.ipros.com/public/product/image/831/2001058705/IPROS09984177461931622173.png?w=280&h=280)
![[Rental] Casing Tube (Double Pipe)](https://image.www.ipros.com/public/product/image/2044991/IPROS12429181703115499455.png?w=280&h=280)
![[Super Soil Utilization Case] Rain Garden](https://image.www.ipros.com/public/product/image/2046004/IPROS4275038699817686970.png?w=280&h=280)