Introducing a case study of underground obstacle removal using the MD250 and SR-45 multi-drill excavators!
We would like to introduce a case study of underground obstacle removal conducted by our company. In Taito Ward, Tokyo, we performed underground obstacle removal using the MD250 with a caterpillar width of 2990mm and the SR-45 multi-drill excavator. For the removal of underground obstacles with a casing diameter of Φ1000, construction machines with a caterpillar width of 3000mm or less are specialized and are effective in narrow spaces. 【Case Overview】 ■Project Name: Underground Obstacle Removal at Kuramae Building, Taito Ward ■Construction Date: September 4, 2019 ■Location: Kuramae, Taito Ward, Tokyo *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.