We are conducting a wide range of foundation work! Here is an example of underground obstacle removal carried out in Chigasaki City.
We would like to introduce a case of underground obstacle removal work conducted by our company as part of a public project. This was carried out in Chigasaki City. An underground obstacle was encountered around 10 meters, making it impossible to proceed with the Avoron method, which led to our receiving the request and securing the contract. For more details about this case, please check the related link. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method 25m Underground Obstacle Removal ■ Construction Date: October 28, 2021 ■ Location: Chigasaki City, Underground Obstacle Removal ■ Details: Φ800 GL-25m *For more information, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.


![[Construction Case Studies] Special Feature on Removed Underground Obstacles (3)](https://image.www.ipros.com/public/product/image/707/2000934000/IPROS70484211785166564149.png?w=280&h=280)
![[Construction Case] Removal of Existing Foundation Piles in a Super-Narrow Site of Approximately 56m2](https://image.www.ipros.com/public/product/image/087/2000928464/IPROS19691711880302218476.png?w=280&h=280)

![[Construction Case] Chuo Ward, Tokyo - Underground Obstacle Removal Work](https://image.www.ipros.com/public/product/image/a24/2000933825/IPROS60347262816364260767.png?w=280&h=280)
![[Construction Case Studies] Special Feature on Removed Underground Obstacles (4)](https://image.www.ipros.com/public/product/image/0e0/2000934012/IPROS74461828820406738078.png?w=280&h=280)

![[Super Soil Construction Case Study] Examples of Soil Improvement and Greening in Planting Work](https://image.www.ipros.com/public/product/image/48b/2000247935/IPROS4680848456193593409.jpg?w=280&h=280)
![[Compass PLUS Implementation Case] Hokuriku Regional Development Bureau Coastal Beach Nourishment Project](https://image.www.ipros.com/public/product/image/831/2001058705/IPROS09984177461931622173.png?w=280&h=280)
![[Rental] Casing Tube (Double Pipe)](https://image.www.ipros.com/public/product/image/2044991/IPROS12429181703115499455.png?w=280&h=280)
![[Super Soil Utilization Case] Rain Garden](https://image.www.ipros.com/public/product/image/2046004/IPROS4275038699817686970.png?w=280&h=280)