Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!
We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-Column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of piles with a small diameter of Φ800mm and a large diameter of Φ1300mm *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.