Introducing a case of underground obstacle removal conducted in Hachioji City, Tokyo on July 20, 2022!
We would like to introduce a case where we removed underground obstacles from a pressure-resistant slab in Hachioji City, Tokyo, using the multi-drill method (equivalent to BG method). During the construction, we used the "SR-45 multifunctional drilling machine multi-drill" manufactured by SoilMec, Italy. In the related link, we have introduced this case with images, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Work for Pressure-Resistant Slab ■ Construction Date: July 20, 2022 ■ Location: Hachioji City, Tokyo *For more details, please download the PDF from the related link or contact us.
Inquire About This Product
basic information
For more details, please download the PDF from the related link or contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF from the related link or contact us.
catalog(1)
Download All CatalogsCompany information
Our company conducts construction work related to building foundations, including the removal of underground obstacles using the multi-drill method, ground improvement work for single-family residential sites, pile driving for low to mid-rise apartment buildings, retaining wall support pile installation, excavation support work, and ground surveys. We have a system in place to propose appropriate methods based on usage and construction conditions, providing a comprehensive range of support from design to municipal coordination, construction, and management. We have developed numerous original methods and obtained patents, NETIS registrations, and utility model certificates. Please feel free to consult us even for projects that have been declined by other companies. In collaboration with our group company, Tomi Crane Co., Ltd., we respond with a wealth of machinery, years of experience and trust, and high-level technology.