1~45 item / All 65 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online1~45 item / All 65 items
Our company has a wealth of experience in providing machinery and equipment, construction work, and parts processing primarily for the manufacturing industry and factories, centered in Yokkaichi, Mie Prefecture. We also conduct "infrared surveys" using infrared thermal imaging cameras (including handheld and drone-mounted types) to visually confirm issues such as floating and water leaks. In leak investigations, we accurately identify the damaged areas with infrared cameras and determine the cause of the leaks through various methods, including endoscopy and water spraying tests. Additionally, we offer "drone surveys" utilizing various types of drones. Please feel free to contact us when you need our services. 【Benefits】 ■ Surveys can be conducted in a short period ■ Surveys can be performed at a lower cost compared to temporary probing ■ No noise from probing sounds due to temperature data analysis ■ Non-contact, so it does not damage finishing materials ■ Leak investigations are also possible *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationOur company has a wealth of experience in providing machinery, equipment, maintenance construction, and parts processing services primarily in Yokkaichi, Mie Prefecture, focusing on the manufacturing industry and factories. We also conduct "infrared surveys" using infrared thermal imaging cameras (including handheld and drone-mounted types) to visually confirm issues such as leaks and water intrusion. In leak investigations, we accurately identify damaged areas with infrared cameras and determine the cause of leaks through various methods, including endoscopy and water testing. Additionally, we offer "drone surveys" utilizing various types of drones. Please feel free to contact us for inquiries. 【Benefits】 ■ Surveys can be conducted in a short period ■ Investigations can be performed at a lower cost compared to temporary probing ■ No noise from probing sounds due to temperature data analysis ■ Non-contact method prevents damage to finishing materials ■ Leak investigations are also possible *For more details, please download the PDF or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThis document explains seven points to check when selecting a pump. It provides detailed explanations about the characteristics and specifications of pumps, how to read performance curves, and the materials used in pumps. It's a helpful resource, so please take a moment to read it. 【Contents (excerpt)】 ■ Types of pumps ■ Principles of pumps ■ Confirmation of pump characteristics and specifications ■ Types and properties of fluids ■ How to read performance curves *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe "Assist Suit" is a product that significantly reduces the burden on the operator's lower back, especially during the lifting and transportation of heavy objects. The support system mounted on the lower back disperses the pressure on the back when lifting heavy loads, thereby reducing the risk of lower back pain. This is important for long-term workplace health management and supports operators in continuing their work in a healthy state. 【Features】 ■ Reduces the burden on the operator's lower back ■ Decreases fatigue during work, improving work quality ■ Suppresses the occurrence of work-related injuries *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationSakeju, which has a wealth of achievements in machinery and equipment, maintenance work, and parts processing for the manufacturing industry and factories, primarily centered in Yokkaichi, Mie Prefecture, is currently offering a collection of case studies summarizing 10 examples of maintenance achievements for machinery equipment such as conveyors and air conditioning! The collection includes a detailed list of available construction services and manufacturing achievements in industries such as food, textiles, and semiconductors. Additionally, Sakeju, with its extensive experience in machinery equipment construction, is also providing "7 Points to Check When Selecting a Pump" for your reference! Please leave your factory construction and repair maintenance needs to us. 【Excerpt from the Construction Factory Case Studies】 ■ Food Factory Conveyor Roof Installation Work ■ Semiconductor Factory Proximity Sensor Addition Work 【Excerpt from the 7 Points to Check When Selecting a Pump】 ■ Type of Pump ■ Replacement Cycle of Pump Parts *For more details, please refer to the PDF materials or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationIn this case study collection, we introduce examples of factory booth production. We provide detailed information on "Features of our factory partition installation work" and "Solutions to factory space challenges." Additionally, we also include case studies on factory booths and partitions/dividers, so please take a moment to read through them. [Contents (Excerpt)] ■ Common challenges in factory partitions ■ Features of our factory partition installation work ■ Business model: Planning, production, maintenance, modification, and removal of partitions ■ Solutions to factory space challenges ■ Modifications and special specifications ■ Examples of use *For more details, please refer to the PDF document or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from the customer stating, "During this time of year, operations will increase, so we are concerned about performance degradation and energy loss due to dirt. We would like to ask a professional for assistance." We checked the existing cooling tower and proposed a confirmation and cleaning operation to ensure there were no internal blockages. The customer had been conducting cleaning operations themselves, but we carried out a professional cleaning operation along with a visual inspection. They expressed, "It was great to be able to clean areas that we couldn't manage ourselves." 【Case Overview】 ■ Industry: Manufacturing ■ Subject: Maintenance Work ■ Request Details: Cooling Tower Cleaning ■ Construction Deadline: 1 Day ■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District ■ *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"We are currently using pumps from Kamino Manufacturing, and we are considering an update. However, the existing pumps are old, and there are no specifications or documentation left, and the manufacturer has gone out of business, so we are in trouble due to the lack of information," was the request we received. Based on comparative materials, we held discussions with pump replacement contractors, piping construction contractors, and insulation construction contractors to confirm the scope of work. We calculated the costs for each construction task and the total project and submitted the estimate to the customer. We were able to receive the order as our ability to handle everything from equipment selection to the entire construction (pump replacement, piping, insulation) was appreciated. [Case Overview] ■ Industry: Manufacturing ■ Subject: Pump Maintenance ■ Request: Pump Replacement Work ■ Construction Deadline: 1 Day ■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District ■ *For more details, please refer to the related links or feel free to contact us.*
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "For some time now, rain has been running down the wall and the floor is flooded. Can you handle repairs for the leak?" After checking all possible causes, we identified that multiple pipe brackets attached to the exterior wall were slightly rusted, creating small gaps that were the source of the problem. We proposed to the customer to reseal the area above the leak and apply waterproof treatment to the pipe brackets. We received feedback saying, "We were grateful for the prompt response from investigation to construction." 【Case Overview】 ■ Industry: Food Industry ■ Subject: Leak Repair ■ Request Details: Maintenance Work ■ Construction Deadline: 1 Day ■ Key Service Areas: Mie Prefecture, Hokusei District, Chusei District ■ *For more details, please refer to the related links or feel free to contact us.
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we manufactured equipment parts without drawings. We received a request to "update the arm for grabbing existing rolls." During production breaks, we researched the approximate sizes, processing details, and materials, and provided a quotation. We inquired about the intended use, and since the relationship between the bent claws that fit the inner diameter of the roll and the distance from the arm attachment to the claws could be misaligned, potentially causing issues when grabbing the product, we took measurements while confirming the specifications with the customer. 【Case Overview】 ■ Industry: Film Manufacturing ■ Target: Film Manufacturing Maintenance ■ Request Details: Manufacturing of equipment parts without drawings ■ Construction Duration: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request from a customer to improve a pressing machine that was previously manufactured at another factory. After contacting the customer and discussing the actual product, we confirmed that because there was only one support pillar in the center, while the liquid could be effectively pressed near the center support, other areas were not being fully pressed. Among the three improvement methods we proposed, it was decided to increase the number of support pillars to three. After submitting the estimate, we received the order, confirmed a schedule that would not interfere with on-site use, picked up the machine, and had the processing company make the improvements. 【Case Overview】 ■ Industry: Semiconductor ■ Subject: Chemical cloth pressing ■ Request Details: Product improvement ■ Implementation Duration: Approximately one week *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where a handbrake was installed on a wagon cart. We selected the J-type stopper "HST-J100," which is specifically designed for swivel casters and can be mounted on the customer's requested inclined wagon cart with dimensions W750 x D500 x H1300, along with an operating lever, and submitted a quote along with the documentation. We implemented proper safety measures and were able to manufacture the product according to the customer's specifications. Additionally, to accommodate requests for multiple units, we addressed the schedule for future orders and detailed requirements. [Case Overview] ■ Industry: Manufacturing ■ Subject: Wagon cart ■ Request: Handbrake installation ■ Construction period: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "The duplicate measuring table used in the inspection process is made of wood, but it has deteriorated, and I would like to know if we can create the same thing." Upon receiving the request, we confirmed the actual item and the drawings on-site. Manufacturing it in aluminum or wood would be expensive and did not match the customer's desired budget, so we decided to manufacture it in iron. We discussed the finer details with the customer, who requested that the handle be made of wood, and since items will be placed on top, they wanted a rubber sheet to be separately manufactured and attached to prevent slipping, along with a request for painting. We proceeded with the manufacturing according to these specifications. 【Case Overview】 ■ Industry: Automotive Parts Manufacturing ■ Target: Manufacturing Industry ■ Request Details: Processed Product ■ Construction Duration: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we manufactured a wooden stamp holder. We received a rough image from the customer and conducted interviews to understand their usage environment and operational methods. Based on that information, we held discussions with our partner company. We focused on usability, considering the hole diameter for storing the stamps, the pitch of the storage holes, the depth of the storage holes, and even the angle of the holes for insertion, confirming each detail with the customer during production. Initially, we planned to carve the holder in the shape of the alphabet to designate the fixed positions for the stamps. However, due to increased costs and limited durability, we proposed using label tape for position designation, which also helped keep costs down. [Case Overview] ■ Industry: Steel Industry ■ Subject: Stamp Holder ■ Request: Production of Stamp Holder ■ Construction Duration: 7 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitase District, Nakuse District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is an example of a request we received from a customer for the proposal and production of a testing jig. We reviewed the current testing methods and looked at photos taken during work when visiting other business locations, and we discussed the product to be tested. Considering the need to minimize the gap between the product being tested and the jig for better workability, we proposed a butt-joint type jig. Additionally, we suggested creating a plate to serve as a base, allowing for height adjustments. We produced one unit as a trial, and since it met the customer's expectations, we were able to receive an additional order for two more units. [Case Overview] ■ Industry: Manufacturing ■ Request Details: Proposal and production request for testing jig ■ Implementation Duration: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request from a customer to improve the cart so that the gas cylinder does not fall while moving a liquid-filled cylinder on a cart to the storage shelf from the site. After discussing with the customer, we proposed adding rollers to the cart and storage shelf to eliminate the need for two people to lift it. Later, we revisited the site with the processing contractor and suggested installing a frame and safety bar on the cart to prevent falling. By adding rollers, it became possible to move the cart to the storage shelf by simply rolling it, allowing one person to perform the task. 【Case Overview】 ■ Industry: Semiconductor ■ Subject: Cart modification ■ Request: Safety measures for transportation ■ Implementation period: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of parts processing for air conditioning ducts that we conducted. In the field, there were instances where two people were working together, but the current air conditioning system only provided airflow to one person, leaving the other completely without airflow. Therefore, we visited the site to first assess the situation. We proposed a method to create and install a Y-branch duct to ensure that both individuals receive airflow. Since the dimensions were outside standard specifications, we took measurements of the actual air conditioning duct. The main duct was 250mm in diameter, and the Y-branch part was 125mm x 2. To prevent the possibility of the material falling due to its weight, we chose galvanized steel. [Case Overview] ■ Industry: Automotive parts manufacturing ■ Subject: Duct ■ Request: Split the air conditioning duct into two branches ■ Construction duration: Approximately 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei and Chusei regions (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case requested by a customer regarding a funnel used to transfer liquids into a container. Due to its tapered shape, the mouth part tends to become sealed, making it difficult to solve the problem, so we proposed to manufacture a solution. Since machining from the raw material would result in significantly high material and processing costs, we combined existing products and welded them together to keep costs down. The customer has expressed, "I was able to work comfortably without creating a vacuum, and I will continue to use it as is." [Case Overview] ■ Industry: Manufacturing ■ Subject: PTFE processed products ■ Request: Custom funnel manufacturing ■ Construction period: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of duct repair work that we conducted. We confirmed the installation location of the chiller on-site. Ducts were installed on the chiller for exhaust, and valve installation work was carried out. This allows for adjustment of the exhaust direction, enabling seasonal adaptation. We received feedback from the customer stating, "The request was to prevent the summer heat, but the work also successfully addressed the winter cold at the same time." [Case Overview] ■ Industry: Automotive Parts ■ Subject: Duct ■ Request Details: Duct repair work ■ Construction Duration: 1 day *For more details, please refer to the PDF materials or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case study of regular maintenance for a valve used daily. Immediately after receiving the request, we conducted a verification process on-site. We performed cleaning of the main casing and checked for any damaged areas. As rust had progressed, we applied anti-rust paint. Additionally, due to wear from aging, we replaced the gland packing and valve bolts, and prepared a report. 【Case Overview】 ■ Industry: Chemical Plant ■ Subject: Valve ■ Request Details: Valve Maintenance ■ Work Duration: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of anchor fixing work carried out to prevent the tipping of equipment and machinery within the factory. Immediately after receiving the request, we conducted a site inspection. First, we checked the condition of the space under the floor, as the length of the anchors varies depending on the underfloor conditions. Additionally, since the legs of the anchors can break, we calculated the load-bearing capacity of the floor and proceeded with the installation. 【Case Overview】 ■ Industry: Automotive Parts ■ Subject: Anchors ■ Request Details: Anchor fixing work ■ Work Details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we undertook maintenance work on dampers for a chemical manufacturer. We received three dampers and disassembled them for a condition check. Upon inspection after disassembly, it was determined that the blades and shafts needed to be replaced, so we proceeded with the replacements. The assembly, including the replacements, was completed after 10 days, and we submitted it along with the drawings. We received feedback stating, "We are very grateful for the maintenance completed in such a short period of 10 days, and for the submission of the drawings." [Case Overview] ■ Industry: Chemical Manufacturer ■ Subject: Dampers ■ Request Details: Maintenance work on dampers ■ Construction Duration: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received maintenance work for a blower from a chemical manufacturer. To confirm the work on-site, the blower was disassembled. The actual inspection and cleaning were performed on seven areas: bearings, motor, casing, impeller, shaft, V-belt, and others. We received feedback from the customer stating, "The hazard prediction was thorough, and I felt very secure in placing the order." [Case Overview] ■ Industry: Chemical Manufacturer ■ Subject: Blower ■ Request Details: Blower Maintenance ■ Work Duration: 2 Days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a message from a beverage manufacturer stating, "The cyclone for raw material storage and supply has become clogged." They expressed a desire to remove the blockage as soon as possible. As it was an urgent matter, we visited the site the same day to investigate and address the issue. We emptied the cyclone and the associated piping to investigate the cause of the blockage. It was speculated that the raw material powder had adhered due to humidity because the line had not been operational for a certain period, which led to difficulties in proper discharge. In this response, we were able to confirm normal operation by removing the adhered raw material, and we also verified that there were no significant issues with the cyclone itself, completing the task. 【Case Overview】 ■ Industry: Beverage Manufacturer ■ Subject: Cyclone ■ Request Details: Cyclone Clogging ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThere is a process for transporting gas cylinders in the waste disposal building, and we received a request to consult about the installation of a chain block there. To install the chain block near the ceiling inside the building, high-altitude work is required. Considering the construction period, using a crane for the work would be the smoothest option, but taking into account the layout of the factory and the delivery space, we decided to set up a rolling tower this time. We safely set up the chain block and trolley from Kito, which was purchased by Sakashige. This made it possible to carry out the transportation of gas cylinders smoothly. 【Case Overview】 ■ Industry: Waste disposal facility ■ Request: Chain block installation work ■ Construction details: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "The dust collector's filter gets clogged with dirt and dust, so I would like to request regular maintenance." First, we conducted a flow processing at the site and cleaned the dust collector's filter to remove the clogging. The filter itself is in good condition, and by removing the accumulated dust and adhering dirt, it is possible to restore its suction power. By resolving the filter clogging, we were able to return the dust collector to one that has suction power again. The dust collector varies depending on the installation environment and the materials being collected, but regular cleaning of the filter contributes to environmental conservation at the site. For maintenance of the dust collector's filter, please feel free to consult with us at Sakashige. 【Case Overview】 ■ Industry: Waste treatment facility ■ Request details: Filter regular maintenance ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationTo enhance the safety of the mixer and prevent operators from accidentally putting their hands inside, we would like to introduce a case where the entire mixer was covered with a vinyl sheet. To cover the entire mixer, we first used pipes around the mixer to support the sheet. This way, even when the mixer is in operation, the vinyl draped over the steel pipes prevents operators from easily inserting their hands. Additionally, by placing the cover from a higher position than the mixer, we have filled the gaps that previously existed at the top. [Case Summary] ■ Industry: Electrical Equipment Manufacturer ■ Subject: Mixer ■ Request: Safety Measures ■ Implementation Duration: 1 Week *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request from a customer stating, "The bird damage in the factory has become serious, so we would like you to implement bird control measures." We confirmed the locations where pigeons were perching in advance and implemented deterrent measures by placing repellent agents primarily in areas favored by the pigeons. Even if we address some areas, pigeons are intelligent and can avoid the treated spots, so we physically prevented their entry by covering other locations with spike strips and glass wool. The customer has expressed, "Since the professionals took care of it, the bird damage has decreased." 【Case Overview】 ■ Industry: Equipment Parts Manufacturer ■ Target: Factory Roof ■ Request Details: Safety Measures ■ Implementation Duration: 1 Week *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where virus infection control measures were implemented throughout the factory. In the past, there were instances of infections occurring within the factory, leading to several close contacts being identified. We received inquiries about wanting to implement measures immediately. As a solution for air purification, we proposed the installation of the NACK Air System air conditioner filter "NEOZONE." Since there was an urgent need for action, we ordered the products and carried out the installation ourselves. The installation itself took about 5 minutes per unit, and there were approximately 100 air conditioners in total. We divided the work and completed it in half a day, finishing everything by the day after we received the request. [Case Overview] ■ Industry: Manufacturing ■ Target: Air conditioners throughout the factory, primarily in the office ■ Request Details: Installation of air conditioner filters (100 units total) ■ Installation Duration: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request stating, "The undergrowth on the property is likely to come into contact with the power lines of the railway running next door, so we would like you to take some action." We immediately conducted a site survey of three logging areas and discussed the logging methods with the lumberjack. On the day of the operation, we informed the railway company about the logging work and proceeded while confirming the operation status. Additionally, we logged the trees to prevent them from falling onto the neighboring company's side, and we also carried out land leveling with the fallen trees to allow for future growth of trees on the property. [Case Overview] ■ Industry: Steel processing manufacturer ■ Subject: Underbrush ■ Request Details: Logging work for the underbrush around the property ■ Execution Details: 5 days (2 weeks after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "Recently, there has been a leak in the factory, and when it rains, the floor becomes flooded. We can't figure out the cause ourselves, so we would like to ask for an investigation into the cause and repairs for the leak." We promptly visited the site and began our investigation in the attic. By tracing the water droplet marks, we discovered that the leak was coming from the ventilation fan area. We focused our investigation on that area and identified that the deterioration of the caulking on the roof side was the cause. We received feedback saying, "After the repairs, it rained continuously for several days, but there were no leaks at all. Thanks to your prompt response, we were able to minimize the damage from the leaks." 【Case Overview】 ■ Industry: Parts Manufacturing ■ Target: Factory Roof ■ Request Details: Roof Leak Repair ■ Work Details: Half a day (3 days after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer asking, "Could you please install blinds on the windows of the office and meeting room for the new building setup?" At the time of the request, we proposed products based on a sample book of the blinds. After selecting the desired blinds and surveying the installation site, we conducted a detailed confirmation of the installation location and method, and aligned on the image post-installation. During the on-site work, with the new building setup and other contractors working in the same building, we ensured thorough safety management while carrying out the installation. [Case Overview] ■ Industry: Residential materials manufacturing ■ Target: Windows and sashes ■ Request: Blind installation ■ Work details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request from a customer stating, "The changing room of the large public bath on the premises has deteriorated over time, and the floor is rotting and feels rough. At this rate, we don't know when the floor might collapse, so we want to repair it urgently." Immediately after receiving the request, we visited the site with our partner company to assess the situation. Although the working hours were limited to 9:30 AM to 3:30 PM, the on-site work was completed in three days. Additionally, during the construction, it was discovered that other areas were also corroded, so with the customer's consent, we took similar measures to repair those areas as well. 【Case Overview】 ■ Industry: Steel manufacturing ■ Subject: Floor replacement ■ Request details: Replacement of the changing room floor in the large public bath ■ Construction details: 3 days (one week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request from a customer stating, "Since the contracted process will be used, we want to ensure it is pleasant for everyone, and we would like to improve the atmosphere in the office by making the break room more beautiful, so we want to redo the interior design." After discussing the budget and image, we held meetings based on the proposal to arrange the furniture. We conducted thorough discussions multiple times to decide on the colors of the walls and ceiling and the arrangement of the furniture to ensure there was no discrepancy in the image, leading to the placement of the order. We were able to complete the construction on schedule, and we received feedback saying, "The finish of the interior was just as we envisioned, thanks to the numerous meetings we had." 【Case Summary】 ■ Industry: Manufacturing ■ Subject: Interior Design ■ Request: Interior Construction ■ Construction Duration: 8 Days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "The artificial grass laid in the aisle has become discolored due to aging and oil stains from shoes, and in some places, the underlying flooring is peeling up, so we would like to repair and replace it." In response, we first brought three types of artificial grass samples for the customer to choose from while discussing the prices. After removing the existing artificial grass and adhesive tape to create a flat surface, we repaired the raised flooring and then applied the new artificial grass. The customer commented, "As expected from a professional, the finish is beautiful and has transformed the space." 【Case Overview】 ■ Industry: Manufacturing ■ Area of Focus: Flooring ■ Request Details: Artificial grass replacement work ■ Construction Duration: 3 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationI received a request from a customer saying, 'The air conditioner currently installed has been around for a long time, and it seems to be quite ineffective for heating, which has led to a bad reputation among the office staff. I would like to take this opportunity to replace it, so could you please provide a quote?' I visited the site and conducted an on-site survey. I also selected the air conditioner myself, providing a consistent estimate that included the selection of a new unit, replacement, refrigerant recovery and disposal, and removal work. On the day of the work, since it was an office, I took precautions to prevent dirt and scratches by covering the steel boards installed on the walls before proceeding with the installation. [Case Overview] ■ Industry: Retail ■ Subject: Air conditioning unit ■ Request: Air conditioner replacement work ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationI received a request stating, 'When I tried to turn on the lights in the changing room by switching on the switch, the lights did not turn on and automatically returned to the off position. Is it possible to have this repaired before employees use this changing room at the end of the workday in the evening?' I received a call from the customer and immediately went to the site to check the situation. I removed the electrical cover from the affected area and confirmed the model number of the switch. Since there was stock of the corresponding switch at a nearby home center, I purchased it, and the restoration was completed about an hour after the initial inquiry from the customer. [Case Overview] ■ Industry: Automotive Parts ■ Subject: Electricity ■ Request Details: Urgent replacement of electrical switch ■ Work Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where a customer requested to convert the current restroom into a women's restroom and create a separate men's restroom. First, we investigated whether it was feasible to install a restroom in this location, including checking the drainage pipe installation up to the septic tank and the possibility of installing a water supply pipe. The structure inside the restroom was constructed using lightweight steel frames. Additionally, the western-style toilet area was designed as a complete private room rather than using panels. We discussed and decided on each element, such as the exterior walls and interior finishes, while reviewing samples with the customer. [Case Overview] ■ Industry: Manufacturing ■ Subject: Restroom ■ Request: New restroom installation ■ Construction Duration: 3 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request stating, "There are several holes in the outer road within the factory, and the areas where trucks pass are uneven, so we would like to have them repaired." We immediately contacted our partner company, conducted a site survey, and submitted an estimate. On the day of construction, when we actually removed the asphalt, we found that the ground was worse than expected, and the nearby drainage pit was also cracked, so we reported this to the customer. On another day, we removed 8m² of asphalt again and repaired the concrete of the drainage pit with mortar. After that, we filled the area where the asphalt was removed with crushed stone, compacted it, laid the asphalt, and marked the lines, completing the work. [Case Overview] ■ Industry: Manufacturing ■ Subject: Customer's internal road ■ Request Details: Asphalt paving ■ Construction Duration: 4 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "There is an employee parking lot within the factory, but several areas of the road are uneven, and when it rains or snows, puddles form and the road becomes muddy, so we would like to have it repaired." In response, we contacted a partner company and later accompanied them to the site for an on-site investigation. After the investigation, we submitted a quotation to the customer based on the measurements. Following that, we received an order for the construction and coordinated the schedule for the work. On the day of the work, we used two 10-ton dump trucks to spread crushed stone in the designated areas, successfully completing the task. 【Case Overview】 ■ Industry: Manufacturing ■ Target: Customer's parking lot ■ Request: Parking lot repair ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from the customer stating, "The vinyl curtain outside the factory has deteriorated over time and has torn, and it has also come off the rail, so we would like to request the replacement of the curtain." After measuring the size of the curtain and checking other areas that needed repair, we found not only the deterioration of the curtain but also deformation of the curtain rail and missing pins. We explained these repair points during the estimate and received a request for arrangements. Unfortunately, the construction day was rainy, but the work was completed in about four hours after starting. We received feedback saying, "The repairs were done beautifully, and the appearance has improved significantly." 【Case Summary】 ■ Industry: Automotive Parts Manufacturing ■ Target: Manufacturing Industry ■ Request: Curtain Replacement ■ Work Duration: Approximately 4 hours *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "The window of the sheet shutter has deteriorated over time and is dirty, making it difficult to see through, which is not good for safety. However, due to budget constraints, we cannot fully replace the sheet shutter and would like to only replace the sheet." Therefore, we decided to utilize the existing body and frame and only replace the sheet. Measuring and creating each sheet took time, but due to high traffic, it was difficult to work during operation hours. After consulting with the customer, we managed to split the work into the lunch break when the factory was stopped. [Case Overview] ■ Industry: Manufacturing ■ Subject: Sheet Shutter ■ Request: Replacement of Sheet Shutter ■ Construction Duration: 3 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "Due to pigeon droppings and feathers, our products and packaging boxes are being damaged, and we would like you to respond urgently. We would like the installation of the scaffolding to be considered at the minimum necessary locations." We visited the site with a specialized bird damage control contractor and conducted a hearing on the site conditions. We confirmed the timing and locations of the pigeon damage and proposed two plans on the spot that matched the budget and construction period. The customer expressed, "This time, the budget was limited, and your suitable proposal that matched the budget and schedule was very helpful." 【Case Overview】 ■ Industry: Residential Equipment Manufacturer ■ Subject: Building Repair ■ Request: Pigeon Control ■ Construction Details: Construction period of 2 weeks (2 days for scaffolding installation, approximately 10 days for construction, 1 day for scaffolding dismantling) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "For some time now, rain has been running down the walls and the floor is soaked. Can you handle repairs for the leak?" After consulting with the customer, we went to the site with a craftsman to check the situation. We identified that several pipe brackets attached to the exterior wall were slightly rusted, creating small gaps that were the cause of the leak. We proposed to the customer to replace the seal above the leaking area and to waterproof the pipe brackets. We received feedback saying, "I appreciate your prompt response from investigation to repair." 【Case Overview】 ■ Industry: Food Industry ■ Subject: Leak Repair ■ Request: Maintenance Work ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationAsphalt depression at the truck stop (for unloading work with a lift). When we carried out repair work, we noticed that the concrete cover of the drainage ditch had noticeable cracks. Upon removing the cover for inspection, we found that the edges were significantly chipped as well. When we reported this to the customer, they consulted us, saying, "Since trucks and lifts pass through here every day, we want to take measures to ensure safety, but is there a cost-effective solution?" Initially, we planned to replace only three severely damaged areas, but it turned out to be more cost-effective to address the entire area, so we integrated the drainage ditches for the entire truck parking space. Additionally, we installed a grating in the center for drainage during rainy weather. 【Case Summary】 ■ Industry: Manufacturing ■ Request: Repair of drainage ditches ■ Work Details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration