Serviced 3 dampers! The assembly, including the replacement, was completed 10 days later and submitted along with the drawings.
We would like to introduce a case where we undertook maintenance work on dampers for a chemical manufacturer. We received three dampers and disassembled them for a condition check. Upon inspection after disassembly, it was determined that the blades and shafts needed to be replaced, so we proceeded with the replacements. The assembly, including the replacements, was completed after 10 days, and we submitted it along with the drawings. We received feedback stating, "We are very grateful for the maintenance completed in such a short period of 10 days, and for the submission of the drawings." [Case Overview] ■ Industry: Chemical Manufacturer ■ Subject: Dampers ■ Request Details: Maintenance work on dampers ■ Construction Duration: 10 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Inquire About This Product
basic information
【Response Details】 ■ Three dampers were received and disassembled for current condition verification. ■ Inspections were conducted, and the blades and shafts were replaced. ■ Assembly, including the replacements, will be completed in 10 days and submitted along with the drawings. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
An unwavering "spirit of service" to thoroughly support businesses in Mie. By upholding the "three promises" in business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■