46~65 item / All 65 items
Displayed results
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationContact this company
Contact Us Online46~65 item / All 65 items
We would like to introduce a case from a customer who plans to paint the walls of the packaging area in their factory within the half-year budget. Immediately after receiving the request, we visited the site with a painting contractor to conduct an on-site survey to determine the extent of the painting, checking for repair areas and cracks. We submitted a quotation for painting an area of 300m2 with two coats, along with repairs for holes and cracks. Additionally, at the customer's request to change the wall color, we mixed the desired color from the color sample book and carried out the work. 【Case Overview】 ■ Industry: Medical Manufacturer ■ Target: Factory Interior Walls ■ Request Details: Wall Painting and Repairs ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from the customer stating, "There is currently one noren curtain installed in the factory, but we would like to install another noren curtain at a different entrance." First, we will ask the customer for more details and confirm the location where they want to install the new noren curtain, as well as the existing one. After providing a quotation, we received feedback that the estimated cost was lower than expected, leading to the order being placed. The installation of the corner pipe for the net, the attachment of the stainless steel net, the installation of the noren curtain, and the final confirmation took approximately just over 4 hours to complete. 【Case Overview】 ■ Industry: Chemical Manufacturing ■ Request Details: Installation of noren curtains and SUS screens ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where a customer, who felt that "efficiency seems to be declining," requested maintenance for their cooling tower. Our company, along with a sales representative from Kuken Industrial, the manufacturer of the cooling tower, visited the site to inspect the actual equipment. It was observed that dirt had accumulated on the cooling tower, which was believed to be the cause of the declining efficiency. Subsequently, we collaborated with the construction team to carry out cleaning. We successfully removed the dirt and completed the work. 【Case Overview】 ■ Industry: Manufacturing ■ Request Details: Cooling Tower Cleaning Request ■ Work Duration: Approximately 2 weeks *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer who was concerned about heat dissipation from the exposed pump section, even though the piping was insulated. After discussing the customer's needs, we proposed insulation using a fine jacket and confirmed that it could be installed without any issues at the desired location. The customer also appreciated that the installation method using Velcro would allow for easy removal and reattachment during maintenance, which met their requirements. [Case Overview] ■ Industry: Chemical Manufacturing ■ Subject: Piping Work ■ Request: Insulation of the Pump Section ■ Work Details: Measurement 0.5 days, Installation 0.5 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, North and Central Kisei regions (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request for cleaning work from a customer who said, "The U-shaped drainage on the premises has become difficult to pass due to increased water levels from recent heavy rain, and it's causing problems." We visited the site with our partner company, removed the covers of the drainage channels to investigate where leaves and other debris were causing the water to rise, and confirmed the range of cleaning work to be performed. On the day of the work, we removed all the covers and grates of the drainage channels within the designated area and removed the soil that was clogged in the gaps of the covers. The area we worked on was approximately 13 meters, and the work was completed in about 2 hours. [Case Overview] ■ Industry: Manufacturing ■ Subject: Drainage channels on the premises ■ Request: Cleaning work ■ Work details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request for leak prevention from a customer who is troubled by rainwater leaking through the factory windows. The customer requested, "We would like you to come for an on-site inspection since we are planning to apply caulking." We immediately contacted a construction contractor and had them come to the site. Due to the complex shape of the factory, there are areas where high-altitude work vehicles are difficult to access, and there is a possibility that other construction work may be ongoing simultaneously. Therefore, we had detailed discussions with the customer to coordinate the schedule and determine how to proceed with the construction. [Case Overview] ■ Industry: Food Factory ■ Target: Maintenance Construction ■ Request Details: Leak Prevention ■ Construction Duration: Approximately 4 days *For more details, please refer to the PDF materials or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer who is concerned that 'we have introduced a new baking furnace, but there is equipment handling nitric acid next to it, and if no measures are taken, the baking furnace will corrode.' We confirmed the situation and dimensions on-site and discussed with the customer to verify the installation location and specifications. As a response, since there were pipes running through the installation area, we processed the piping to ensure it would not be affected by the partition installation. Additionally, we implemented slit processing on the partition at the points of contact. [Case Overview] ■ Industry: Automotive parts manufacturing ■ Subject: Maintenance construction ■ Request: Installation of a partition ■ Construction details: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration"We had been applying layers ourselves until now, but they quickly started to peel off, and no matter how much we painted, it seemed never-ending." This is a case where we received a request for floor renovation from a customer facing such issues. We addressed the unevenness with putty and leveling, finishing with a thick layer of epoxy resin. Additionally, by applying a UV coating, the surface becomes less prone to dirt and easier to clean, making it suitable for maintaining aesthetics. This time, we finished with a non-slip matte surface, ensuring safety measures by providing slip resistance even in the presence of oil and moisture. 【Case Overview】 ■ Industry: Metal processing ■ Subject: Floor renovation and aesthetic maintenance ■ Request details: Floor renovation and aesthetic maintenance ■ Construction details: 2 days for floor coating, 1 day for UV coating *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer to install a foreign matter intrusion prevention cover on the conveyor for product containers. Immediately after receiving the request, we conducted a verification process on-site. We measured the dimensions of the product container and the receiving outlet in advance and began the construction. By surrounding the conveyor with acrylic panels on all sides, we prevent foreign matter intrusion from all directions while also allowing for visual confirmation of foreign matter through the use of acrylic panels. [Case Summary] ■ Industry: Automotive parts ■ Target: Conveyor ■ Request Details: Installation of foreign matter intrusion prevention cover ■ Construction Duration: 1 day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei region, Chusei region (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationDust generated during work is causing issues, and we received a request from a customer to "install a dust cover to allow the dust collector to suck up the dust." Immediately after receiving the request, we conducted a site inspection. We introduced past construction examples, selected the framework and sheets, and submitted the completed design along with the corresponding estimate. Subsequently, we carried out the installation work on-site according to the completed design. [Case Overview] ■ Industry: Parts processing ■ Subject: Dust collector ■ Request details: Installation of a cover around the dust collector ■ Construction details: 1 day (3 weeks after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of repairing a foreign-made compressor that we were commissioned to handle. The customer was facing difficulties due to the inability to perform maintenance on the compressor from a foreign manufacturer outside of the manufacturer's service, as well as the slow response and high costs. In response, our partner company took on the maintenance, proceeding with confirmation alongside the customer based on the manual. Additionally, we obtained a supervisor license to conduct work on-site, ensuring a thorough safety protocol. 【Case Overview】 ■ Industry: Semiconductor ■ Subject: Foreign-made compressor ■ Request: Repair of foreign-made compressor ■ Construction Duration: 3 to 5 days *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case where we received a request for repairs to equipment used to crush one-gallon cans for raw material storage at a chemical manufacturer. The customer expressed that "the hydraulic cylinder is likely broken and is in a dangerous condition, so we need it fixed urgently." Our representative visited the site to confirm the situation. The manufacturer that produced the original cylinder is no longer in production and cannot perform repairs, so we took on the task of restoring the original functionality. Based on the maximum output and operational stroke of the hydraulic cylinder that had been used, we selected a new hydraulic cylinder. 【Case Overview】 ■ Industry: Chemical Manufacturer ■ Subject: Hydraulic Cylinder ■ Request: Hydraulic Cylinder Repair ■ Work Details: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe customer was planning to introduce new equipment in the factory to respond to increased production, and was considering measures to establish a system that could handle any troubles that might arise. Their request was, "Currently, we are using separate pipes, and we want to connect them into one so that even if one stops, we can supply water from the other pipe, allowing us to keep the equipment running." To connect the respective pipes, we used flanges to connect the PVC and white pipes at the junction points. Additionally, considering future applications, we installed ball valves to ensure that each pipe could be used independently, and carried out the work to consolidate the piping. 【Case Overview】 ■ Industry: Electronic Components Manufacturing ■ Subject: Piping ■ Request: Piping Construction ■ Construction Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case study of additional work involving proximity sensors for a cleaning device. The customer was considering installing a sensor that would prevent operation when the door is open while the device is powered on, as a safety measure, or whether it could be configured to emit a sound. We discussed the customer's requests and budget, and based on that information, we visited with a partner company to select the appropriate sensors. We secured the order within the customer's budget. It took about three weeks from receiving the order to the arrival of the product, and the work on the day of installation was completed without any issues in approximately four hours. 【Case Overview】 ■ Industry: Semiconductor ■ Target: Cleaning Device ■ Request: Implement safety measures ■ Construction Details: 1 day (3 weeks after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationHere is a case where we received a consultation regarding the maintenance of a blower attached to production equipment. "We hadn't used the equipment for a while, so to be safe, we turned on the power early the next morning to use it, but we heard an unusual noise coming from the blower. We are concerned that it might be dangerous to use it as is, and we would like you to check it immediately," was the inquiry we received by phone. Since there was no spare equipment available and production would be delayed without this blower, they urgently requested our assistance. We rushed to the site to check the blower. The blower itself was light enough to be removed, so we took it to a cooperating contractor's factory for inspection. It was determined that there was an issue with the motor bearing, and we replaced the motor bearing. [Case Summary] ■ Industry: Manufacturing ■ Subject: Turbo Blower ■ Request: Blower Maintenance ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from a customer stating, "When we received the pump manufactured by Ebara Corporation that we purchased recently, we rearranged the existing pumps and installed the new pump ourselves, but we are experiencing vibrations and would like to improve this urgently." To determine whether we can conduct maintenance promptly, we first called the contractor to explain the pump's manufacturer, model, serial number, the symptoms occurring, and the installation conditions, in order to identify the cause of the malfunction and the defective parts. After confirming that maintenance could be scheduled for the weekend, we provided a cost estimate and proceeded with the replacement of the coupling and coupling bolts. [Case Overview] ■ Industry: Residential Equipment Industry ■ Subject: Pump Maintenance ■ Request Details: Resolution of pump vibration issues ■ Work Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of conveyor belt replacement work that we were commissioned to undertake. The customer requested, "I don't know what we are currently using, so I would like assistance with selection," and "Since we cannot stop the conveyor all day on the day of work, I would like to request work starting in the afternoon." As soon as we received the request, we promptly sent craftsmen to the site to confirm and make proposals. Although time was limited, we were able to respond smoothly by having a pre-meeting, and we completed the work within the time requested by the customer. 【Case Overview】 ■ Industry: Food Manufacturing ■ Subject: Conveyor ■ Request Details: Belt Replacement Work ■ Construction Details: 1 day (1 week after order) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Nakasei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe would like to introduce a case of jacket tank repair work that we were commissioned to undertake. We received a message from the customer stating, "This is the same tank that was repaired before, but there is a pinhole in a different location causing a water leak, so I would like it fixed." We immediately contacted a contractor who could perform welding work. The contractor was able to come to the site on the same day, so we coordinated a time with the customer for a site inspection. We discussed the plan to weld putty over the pinhole to prevent water leakage. After the work was completed, the customer confirmed the repaired welding area, and the job was finished. 【Case Overview】 ■ Industry: Food Factory ■ Subject: Jacket Tank ■ Request Details: Tank Welding Repair Work ■ Work Duration: 1 Day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationWe received a request from the customer to install a simple roof to prevent physical water droplets from falling on the manufacturing line as a condensation countermeasure. Additionally, there were requests such as "I would like the installation to be done without drilling holes and securing with bolts or making any modifications to the equipment." Therefore, we conducted a site survey with the design and construction company and held meetings with the customer to brainstorm ideas on-site. We proposed a custom socket with a shape that would not easily come off when installed, and by fitting that socket, we suggested creating a support structure to attach the roof, and we received the request. [Case Overview] ■ Industry: Food ■ Subject: Conveyor ■ Request Details: Installation of a roof for the conveyor ■ Construction Duration: 14 days *For more details, please refer to the PDF materials or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registrationThe customer regularly performed high-pressure cleaning of the heat exchanger panels, but they wanted their employees to focus on the crucial manufacturing line and did not want them to work overtime for cleaning tasks. Therefore, our company arranged for the cleaning work to be observed by the contractor on the days when employees were involved, confirming that the work could be carried out, and submitted a quotation. After cleaning 32 panels, we opened the valves to check for any water leaks before concluding the work. [Case Overview] ■ Industry: Textiles ■ Subject: Heat Exchanger ■ Request: Cleaning of heat exchanger panels ■ Work Details: Half a day *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Added to bookmarks
Bookmarks listBookmark has been removed
Bookmarks listYou can't add any more bookmarks
By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.
Free membership registration