Submit a completion report after the work! We propose the installation of the scaffolding in two designated locations as requested.
We received a request from a customer stating, "Due to pigeon droppings and feathers, our products and packaging boxes are being damaged, and we would like you to respond urgently. We would like the installation of the scaffolding to be considered at the minimum necessary locations." We visited the site with a specialized bird damage control contractor and conducted a hearing on the site conditions. We confirmed the timing and locations of the pigeon damage and proposed two plans on the spot that matched the budget and construction period. The customer expressed, "This time, the budget was limited, and your suitable proposal that matched the budget and schedule was very helpful." 【Case Overview】 ■ Industry: Residential Equipment Manufacturer ■ Subject: Building Repair ■ Request: Pigeon Control ■ Construction Details: Construction period of 2 weeks (2 days for scaffolding installation, approximately 10 days for construction, 1 day for scaffolding dismantling) *For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Hokusei District, Chusei District (surrounding Mie).
Inquire About This Product
basic information
【Response Details】 ■ Based on the pigeon damage situation, we will propose two plans: (1) installation of bird nets at the roof openings on the outside of the building and inside, and (2) a plan for the roof openings on the outside of the building only, along with a proposal document and estimate to be provided later. ■ Regarding the installation of scaffolding for elevation during construction, we will limit the installation locations to two places to also serve as temporary storage, and we will propose according to your preferences. ■ Work will commence approximately one week after the request, with a schedule submitted before the work starts and a completion report submitted after the work is finished. * For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
An unwavering "spirit of service" to thoroughly support businesses in Mie. By upholding the "three promises" in business, all employees strive to face our customers and respond to their needs. ■□■ Key Area: Mie Prefecture, Hokusei and Chusei Regions ■□■