Construction method Product List and Ranking from 35 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. 桐井製作所 Tokyo//Building materials, supplies and fixtures manufacturers
  2. null/null
  3. null/null
  4. 4 室岡林業 Niigata//Building materials, supplies and fixtures manufacturers
  5. 5 ワイビーテクノ Tokyo//Building materials, supplies and fixtures manufacturers 東京事務所

Construction method Product ranking

Last Updated: Aggregation Period:Jul 16, 2025~Aug 12, 2025
This ranking is based on the number of page views on our site.

  1. SQ method 桐井製作所
  2. A-CR Method (Absolute Crushing Method)
  3. Construction method "Ladder Frame Method" 室岡林業
  4. 4 Construction method "Two-Line Welding Method (Two-Line Mesh Method)" ワイビーテクノ 東京事務所
  5. 5 TSC method

Construction method Product List

166~180 item / All 195 items

Displayed results

Construction method "Nano-Mente SB Method"

It is a highly safe cleaning system that takes the environment into consideration!

The "Nano-Mente SB Method" is a technique that penetrates special cleaning agents into materials such as walls and wood to remove mold and eradicate it from the source. It decomposes mold and dirt inside and outside buildings from the root, maintaining aesthetics with antibacterial, antifungal, and waterproof effects. It restores without damaging the building, discoloring the paint, or harming the wood. 【Features】 ■ Easy and speedy construction ■ No scaffolding required ■ Achieves low cost ■ Long-lasting effects ■ Safe and secure for both humans and nature *For more details, please download the PDF or feel free to contact us.

  • Rust Inhibitor

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "CLT method"

Due to the orthogonal lamination, the expansion and contraction of the wood can be suppressed, resulting in high dimensional stability.

The "CLT method" is an abbreviation for Cross Laminated Timber, which is a construction method using large engineered wood panels called "cross-laminated panels" developed by Austrian timber manufacturers in the 1990s. It is widely used in various applications, from single-family homes to large facilities and nine-story apartment buildings, and demand has rapidly expanded in recent years, with standardization efforts progressing in Canada and the United States. 【Features】 ■ Achieves high dimensional stability ■ Exhibits excellent thermal insulation, soundproofing, and fire resistance ■ Increases energy efficiency ■ Ensures high seismic resistance ■ Significantly shortens construction time *For more details, please feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced Soil Construction Method Series

Creating a better social space. Hirose always proposes the best proposals.

Hirose's long-cultivated know-how regarding soil has contributed significantly to the safety, economic efficiency, and aesthetic quality of civil engineering structures, from urban civil works to large-scale projects in suburban areas, enhancing social infrastructure. We will continue to propose suitable construction methods while considering harmony with the natural terrain, geology, and surrounding environment.

  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Kezuru Method"

Can be applied to asphalt surfaces! Existing surface and existing pavement ring-type anti-slip construction method.

The "Kezuru Method" is a technique that creates circular grooves on existing asphalt and concrete surfaces using a Kezuru bit to provide anti-slip features. Generally, it is attached to a standard motor engine core machine, and while applying cooling water, circular grooves are constructed at a specified rotation speed. Since it is applied to existing surfaces, it can be executed at any time, and there is no curing period after construction, allowing for immediate reopening. 【Features】 ■ Can be applied to asphalt surfaces ■ Can be executed at any time since it is applied to existing surfaces ■ No curing period after construction, allowing for immediate reopening *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

MUS (Make-Up System) construction method

Reinforcement is definitely possible with just one tile! No extra waste materials will be generated.

This technology is a method for preventing the detachment of exterior wall finishing materials (tiles and stone cladding). It involves directly drilling into the exterior finishing materials and attaching a finishing material (makeup) that has been fired to a color closely resembling the existing finishing materials. The construction marks are hardly noticeable, and durability and aesthetics can be maintained for a long time. Additionally, by drilling from the surface of the tiles, it eliminates noise, vibration, and dust when removing the current finishing materials. 【Features】 ■ Reliable durability ■ Quiet workability ■ Aesthetic quality closely resembling the existing materials ■ Environmental considerations for the future *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

S・MC (Masking Cap with Stainless Steel Pin) Method

Can be finished with an extremely low burden, limited to the degraded area! Work can be done in just 3 steps.

This technology is a suitable repair method for the deteriorated areas (lifted sections) of tiles used as finishing materials in buildings and similar structures. Using a super drill similar to the "MUS method" that our company also employs, and finishing with a dedicated stainless steel pin masking cap, it offers advantages such as improved workability, aesthetic finish, reduced noise for residents and neighbors, and consideration for the environment. 【Features】 ■ Quiet workability ■ Beautiful finish ■ Aesthetic quality closely resembling the existing materials ■ Environmental considerations looking towards the future ■ Suitable for the deteriorated areas of tiles used as finishing materials in buildings and similar structures *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Super MC Method

Depth adjustment is easy with the dedicated adjuster! Simple installation by just tapping with a plastic hammer.

The "Super MC Method" allows you to maintain the value of a building without compromising its appearance through a simple construction method. There is no need to replace tiles as the masking cap fits any exterior wall. Additionally, it eliminates any visual discomfort, allowing you to keep a beautiful exterior. [Features] - No need to replace tiles - Compatible with any manufacturer for quarter anchors - No restrictions on anchor depth during installation - Easy construction by simply tapping with a plastic hammer - Excellent weather resistance paint *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Piled Wooden Hybrid Ground Improvement Method"

Ground improvement method using pile-like improvement materials covered with concrete and made of wood!

The "Piled Wooden Hybrid Ground Improvement Method" is a composite material ground improvement technique that enhances the durability of wooden pile improvement materials by covering the wood (mainly cedar lumber) with concrete and shaping the cross-section into a regular octagonal pencil-like form, thereby shutting out the supply of moisture and oxygen necessary for the growth of wood-decaying fungi. It can be constructed at a cost equivalent to existing soft ground improvement methods. *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

LL-Fp method

Shortened construction time and reduced costs with Drill Jumbo construction. No need for specialized drilling machines or personnel.

The technology allows for the installation of φ139.8mm large-diameter steel pipes over long distances using a drill jumbo, which is a general-purpose excavation machine for mountain tunnels, without the need for specialized machinery. Traditionally, it was considered difficult to install such large-diameter steel pipes into the ground using a drill jumbo, but various innovations and the development of specialized tools have made this possible. 【Features】 ■ Improved workability ■ Enhanced settlement suppression effect ■ High construction precision ■ Reduction in process and costs ■ The bending rigidity of the steel pipe is about three times that of AGF (in the case of double-pipe specifications) *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CB method

It can be easily done even in narrow spaces! We will introduce the standard method for welding reinforced concrete joints.

The "CB Method" refers to an enclosed welding technique that uses ceramic backing materials. After the welding operation, the backing can be removed, allowing for visual inspection of the weld's appearance. This method was jointly developed by Osaka Prefecture and Aichi Institute of Technology, focusing on stable quality. It is utilized in various construction projects, both in architecture and civil engineering, particularly for large diameters (D35 and above), with an annual achievement of approximately 500,000 locations. 【Features】 ■ High reliability of joint performance ■ Good workability of joint shape ■ Reliable quality control ■ Speedy welding operations ■ Expanding possibilities for construction methods ■ Market area: Hokuriku only *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Other construction services
  • Fittings

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

2×4 construction method

We aim for a consistent manufacturing process in a well-equipped 2x4 factory!

The "2×4 method" eliminates complex joints and connections, and through a simplified construction method, it is less dependent on the skill of the contractor, ensuring quality and performance. Our company designs buildings using the 2×4 method and processes and sells panels and precut materials. Please feel free to contact us if you have any inquiries. *For more details, please do not hesitate to reach out to us.*

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "CWS Method"

Autonomous operation requires no operator! It enables significant reductions in construction time and personnel.

The "CWS Method" is a construction technique that enables long-distance transportation of materials in projects addressing steep slopes and maximum inclines. It achieves the objective at a cost far lower than introducing large cranes. Additionally, the method of extending rails horizontally does not require scaffolding. 【Features】 ■ Achieves significant cost reduction without the need for large crane operations ■ Allows transportation of materials without restrictions on slope angle or distance ■ Reduces the need for scaffolding work ■ Can be installed in narrow workspaces, even on single-lane roads ■ Most materials can be covered with rental items *For more details, please download the PDF or feel free to contact us.

  • Erosion control works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Aqua jet method

Effectively peel, grind, and remove! Considerate of the environment, we finish the treatment surface beautifully.

Using the power of water to peel, grind, and remove. The "Aqua Jet Method," which utilizes ultra-high-pressure water jets, is a processing system that is environmentally conscious and possesses both delicate operational performance and robust power. The wastewater and debris generated during work are collected by a vacuum device and separated into water and solid components by a turbidity treatment system. The extracted water is discharged after treatment. This system not only advances work functionally but is also highly considerate of the environment. 【Features】 ■ Effectively peels, grinds, and removes treatment surfaces by spraying ultra-high-pressure water ■ Collects wastewater and debris generated during work with powerful suction vacuum ■ Separates collected materials into water and solid components using a turbidity treatment system ■ Discharges water after treatment ■ Advances work functionally while being highly considerate of the environment *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration