Site Investigation | Optimizing Pile Length through Data Comparison and On-Site Survey in Narrow Areas where Large Machinery Cannot Access
We will conduct on-site sounding surveys using small machinery and compare them with neighboring data in the construction of a steel frame building on a narrow site, to determine the optimal pile length and prevent piling troubles.
In urban dense areas and on narrow sites, the construction of steel frame buildings faces challenges such as the difficulty of bringing in large survey equipment, ensuring sufficient support layer data, and planning smooth pile driving operations. GeoTech's on-site responsive solutions introduce a compact, mobile automatic ram-sounding testing machine to the site, enabling high-precision automatic ground measurements in a space-saving and time-efficient manner. Furthermore, by real-time correlating and complementing the abundant surrounding boring records and on-site measurement data stored in its own database, it accurately determines the inclination and continuity of support layers that are difficult to discern with single-point investigations. By obtaining accurate data in advance, it prevents on-site troubles such as insufficient pile length or excessive overburden during pile driving, allowing for the appropriate selection and ordering of steel pipe piles and certified methods. This dramatically improves on-site work efficiency and eliminates unnecessary rework, strongly promoting safe and planned construction management, and providing long-term support for the smooth completion of projects on site.
- Company:ジオテック
- Price:Other