The method of "belly attachment work" using underwater concrete, which incorporates precast residual formwork as part of the structure.
<Ensuring Safety and Planning> ■ The residual formwork method allows for construction in stages, eliminating enclosure and enabling quick evacuation in emergencies. ■ The residual formwork itself is self-supporting, allowing for safe operations underwater. ■ It is possible to ensure planning for offshore construction, which is easily affected by weather and sea conditions. <Economic Efficiency and Improved Workability> ■ The absence of enclosed spaces improves work efficiency, leading to shortened construction periods. ■ The lightweight of the products allows for construction using small machinery. ■ In conventional methods, a minimum width of 1.0 m was required for underwater work space for stability calculations, but with the residual formwork method that does not require enclosed spaces, designs can be made according to stability calculations, reducing the amount of concrete needed. <Simplification of Material Procurement> ■ Staged construction makes it easy to secure ready-mixed concrete and improves workability, enabling small-scale placements in fishing port construction. ■ Material delivery is limited to what is needed for staged construction, reducing yard area and simplifying yard planning.
Inquire About This Product
basic information
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
Detailed information
-
Installation of foundation work (such as waste stone) Foundation work (such as waste stone) will be installed for the setup of formwork.
-
Installation of formwork can be easily done from land using a crawler crane or similar equipment.
-
Work on the first stage formwork involves removing the separator and pouring underwater concrete.
-
Second stage installation work Remove the latency, set up guides, install the second stage formwork, and carry out the same work as in the first stage.
-
Formwork for the topmost section This is the precast concrete formwork that has been assembled and cast with underwater concrete up to the topmost section.
-
Work on the first stage formwork Shaping is done in the superstructure. Align the normals and level the plane in the superstructure, then shape it.
catalog(1)
Download All CatalogsCompany information
Our company, under the belief of contributing to society through the development of social infrastructure, constantly strives for quality improvement and technical advancement. With the conviction that business is about people, we respect humanity and foster a free and open corporate culture through talent development and fair personnel practices. We aim to deepen mutual understanding and trust, working together towards the development of the company and the enhancement of welfare, while concentrating all our efforts on stabilizing and expanding our management foundation.