[Construction Example] Shōjin Bridge, Hanamuro River, Ibaraki Prefecture
Introducing a case of temporary closure using the LPF method constructed in a narrow space of approximately 2.3m in height!
At the Shojin Bridge over the Hanamuro River in Ami Town, Ibaraki Prefecture, the "Temporary Closure LPF Method" was implemented. Construction was carried out in a narrow space of approximately 2.3m under the girder. Materials were transported using a small mobile crane and a simple floating barge from above the bridge deck. 【Case Overview】 ■ Temporary Closure Shape: Oval shape φ4.0m L=16.9m H=5.0m ■ Client: Ibaraki Prefecture (Construction in fiscal year 2015) ■ Construction Location: Shojin Bridge, Hanamuro River, Ami Town, Ibaraki Prefecture *For more details, please download the PDF or feel free to contact us.
- Company:日本海洋サービス 大阪支店
- Price:Other