Construction method Product List and Ranking from 1598 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

3811~3825 item / All 4238 items

Displayed results

一般工法との比較『仮締切防水シート工法』

仮締切防水シート工法は、従来の工法に比べ、工事費・工期をはじめ多くの面でメリットがあります。設計協力いたします!

仮締切防水シート工法は、潜水士による水中施工を削減できる点、頼なプレートのリユースが可能な点などの特長がございます。 吊治具、フロート式作業床を設置し作業床上でライナープレートを気中組立誤後、水中に降下・設置します。 【メリット】 ■水中施工を極力削減 ■人工施工が可能 ■大規模仮設が不要 など 【評価】 ■水中施工削減による安全性向上 ■リユースによるコスト削減 詳細は、資料ダウンロードまたは直接お問い合わせください。

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

How to choose a liner plate construction method? *Reference materials for method comparison are currently being provided.

Introducing methods suitable for repairing upstream bridges where large heavy machinery access is difficult, including ways to reuse liner plates! What construction methods are suitable for shortening construction time and reducing labor?

This document explains the construction method using retaining materials widely known as the liner plate method. Various methods are considered mainly for bridge pier repairs, and it is widely examined as a suitable foundation and retaining method in areas such as upstream rivers where heavy machinery cannot access. [Document Introduction *Excerpt] ■ Methods suitable for the removal of accumulated sediment around bridge piers ■ Methods that have achieved the reuse of liner plates ■ Comparison materials for various liner plate methods *Overview, features, water-stopping methods, advantages, disadvantages, etc. are introduced. Our company handles methods suitable for temporary closures (using liner plates) for bridge piers, sluices, etc. *For more details, please download the PDF or feel free to contact us.

  • 図3.png
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

COPITA type pre-boring pile construction method

Pre-boring pile method for civil engineering.

Our company handles the "COPITA Type Pre-Boring Pile Method." This method uses a drilling and mixing device with a diameter of the pile plus 100 mm, injecting drilling fluid into the ground as needed while excavating to the specified depth, and then injecting a solidifying liquid to create the solidified section. While raising the drilling and mixing device, we inject and mix the pile surrounding fixed liquid to create soil cement within the ground. After that, we install and embed precast concrete piles either by self-weight or rotary pressing to secure them in place. 【Features】 ■ Straight drilling without constructing an enlarged bulb at the tip ■ Collection of unconsolidated samples from the pile surrounding fixed section ■ Strengthened management of on-site welded joints ■ Thorough construction management *For more details, please download the PDF or contact us.

  • Ground foundation construction method
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Pipe Rotating Pile Method "Dyna Mega Press Method"

Excavation is carried out reliably while slicing and cutting the ground with a small torque!

The "Dyna Mega Press Method" is a steel pipe rotary pile method with high penetration capability. It is environmentally friendly, with zero discharge and no use of cement, and due to the compact size of the construction machinery, it can be implemented in narrow sites and access routes. The uniquely shaped flat wings slice through the ground slowly and reliably while advancing, and although the excavation speed is not fast, it demonstrates penetration performance even in soft rock layers. 【Features】 ■ Environmentally friendly ■ Suitable for narrow spaces ■ High load-bearing capacity ■ Easy to remove ■ Capable of pulverizing and penetrating soft rock layers *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete Structure Repair and Reinforcement Method "FORCA Tow Sheet Method"

Repair and reinforcement methods for concrete structures using carbon fiber sheets and aramid fiber sheets!

The "FORCA Tow Sheet Method" is a repair and reinforcement technique that excels in workability by simply adhering a unidirectionally arranged continuous fiber sheet called "Tow Sheet" to the surface of concrete using a room-temperature curing epoxy resin. It demonstrates a high reinforcement effect without an increase in weight. It can quickly respond to the most pressing concerns in bridge construction, such as seismic reinforcement of bridge piers, accommodating live loads on deck slabs, and reinforcing or preventing spalling of tunnels, chimneys, and other concrete structures, as well as preventing crack propagation. 【Examples of Application】 ■ Bridges ■ Tunnels ■ Architectural Structures *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Agricultural Waterway Repair Method "Denka Aqua Lining Method"

A lining repair method that meets the performance requirements for waterway repairs!

The "Denka Aqua Lining Method" is an inorganic agricultural waterway repair method using polymer cement mortar. It achieves appropriate roughness coefficients and wear resistance without using special panels. It is economical because it allows for high-quality lining to be constructed with simple installation. 【Features】 ■ Two types of primers are available: the special epoxy resin primer Aqua Hard and an EVA-based emulsion primer. ■ The special epoxy resin primer Aqua Hard can adhere to both dry and wet surfaces, ensuring high adhesion strength. ■ The EVA-based emulsion primer RIS211E is made from inexpensive materials and offers excellent workability. ■ The polymer cement mortar Spread Ace Aqua contributes to the durability of the waterway. ■ It is not affected by the cross-sectional shape of the waterway. *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No need for leveling after the removal of the plaroad! Restoration to the original state is easy!

Minimize damage to the ground of the leased land! Prevents troubles with landowners.

"Plaroad" does not require leveling after removal, making restoration easy. Unlike conventional methods, there is no worry about leaving gravel, different types of soil, or metal fittings behind, minimizing damage to the ground of the leased land and preventing disputes with landowners. Please feel free to contact us when you need our services. 【Features】 ■ Manual collection ■ Inspection conducted at the material center ■ Easy restoration after removal ■ No concern about leaving gravel, different types of soil, or metal fittings behind *For more details, please refer to the PDF materials or feel free to contact us.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Zero Clearance Method

It is possible to construct with the gap (dead space) between the structure and the pile material in a "zero" state!

We would like to introduce the "Zero Clearance Construction Method." This method allows for construction with the gap (dead space) between adjacent structures and pile materials in a "zero" state. Please feel free to contact us when you need our services. 【Features】 ■ Construction is possible with the gap (dead space) between adjacent structures and pile materials in a "zero" state. *For more details, please refer to the PDF document or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel pipe pile driving method

From temporary soil retaining walls to permanent retaining walls (permanent structures)! Capable of being installed by pressing for a wide range of purposes.

We would like to introduce the "Steel Pipe Pile Driving Method." Using steel pipe piles, we can perform press-in construction for a wide range of purposes, from temporary earth retention walls to permanent retaining walls (permanent structures). Please feel free to contact us when you need our services. 【Features】 ■ Press-in construction is possible for a wide range of purposes. *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pre-fabricated pile driving method

Supporting the foundations of structures using a variety of construction methods and machinery! Introducing the precast pile driving method.

We would like to introduce the "Precast Pile Driving Method." This method uses a variety of techniques and machinery to support the foundations of structures with concrete piles. Please feel free to contact us if you have any inquiries. 【Features】 ■ Supports the foundations of structures *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temporary pier construction method

By installing a cover board, we construct a work platform and temporary bridge! Introducing the temporary bridge construction method.

We would like to introduce the "Temporary Bridge Construction Method." In river construction and similar projects, we construct a work platform and temporary bridge by combining H-shaped steel and installing cover plates on top. Please feel free to contact us when you need our services. 【Features】 ■ Constructing work platforms and temporary bridges *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vibro hammer method

Rapidly and temporarily reduce tip resistance and friction resistance! Introducing the vibro hammer method.

We would like to introduce the "Vibro Hammer Method." This method involves using a vibration-type pile driver to transmit forced vibrations to piles and steel sheets, rapidly and temporarily reducing the resistance at the tip and the friction resistance, allowing for driving and extraction. Please feel free to contact us when you need our services. 【Features】 ■ Rapid and temporary reduction of resistance at the tip and friction resistance *For more details, please refer to the PDF materials or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Western tiles - imported tiles "Platte Ekaru Prese / Platte Prese"

Traditional Northern European beaver tiles with a sense of heaviness and unique charm.

We offer the Edilians beaver tiles, which are a tradition of Northern Europe, namely 'Platt Écaille Précise' and 'Platt Précise'. These tiles can meet a variety of needs, including steep roofs and decorative wall applications. Their substantial presence offers a unique charm that cannot be expressed with other tiles. 【Lineup】 ■ Platt Écaille Précise - Rouge Nuance - Terdue Pousse - Chevroûtes, etc. ■ Platt Précise - Chevroûtes - Millésime, etc. *For more details, please download the PDF (French version) or feel free to contact us.

  • Clay roofing tiles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Toho Premix Series: Toho Grout

Just mix and inject it in the original packaging pack! It can be created immediately without making a mess around.

"Toho Grout" is a grout mortar that can be created immediately without dirtying the surroundings. It is used for various applications, including seismic reinforcement work, injection into gaps such as those in steel door frames, and for anchoring bolts and wrapping steel plates. It is suitable for small-scale use and repairs, significantly reducing work time. 【Features】 ■ Usable for filling the foundation parts and joints of concrete structures ■ Has high strength and non-shrink properties ■ Easy to handle as it is a premixed type grout mortar ■ Designed to suppress water permeability, providing expected water-stopping effects ■ Has fluidity equivalent to self-leveling materials *For more details, please refer to the PDF document or feel free to contact us.

  • Reinforcement and repair materials
  • Earth retaining wall/foundation reinforcement
  • Mortar and plaster materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Crushed Stone Utilization Basket Method "Crushed Stone Box - saisekibako -"

The "labor-saving cage method" allows for easy and speedy construction using crushed stone as backfill material. [Crushed stone can be used]

We respond to the voices from the field saying, 'There are no large stones used in gabion work' and 'It is difficult to manually arrange and align large stones.' ■ Features of the 'Crushed Stone Box - saisekibako -' - The fine mesh of the wire netting on the front and side allows for filling with crushed stone of 20mm or larger (No. 4 or larger). - By filling with crushed stone, the middle filling work becomes significantly faster compared to traditional gabion methods. - Since the top cover (top panel) is generally not used, there is less work involved in attaching coils. (Note: The top panel is optional.) - The assembly of the panels is simple, allowing anyone to assemble them smoothly. - The main body of the gabion is made of galvanized aluminum alloy welded wire mesh, providing a sturdy structure. - Using galvanized aluminum alloy wire makes it highly corrosion-resistant. (Material durability: approximately 30 years underwater, 30 to 150 years in the atmosphere) - Compared to Quick Gabions (panel-type mattress gabions) and Quick Gabions for fine gravel (double mattress gabions), the direct construction costs are lower. (Comparison with in-house products) We also undertake construction work. Please feel free to consult with us.

  • Baskets and futon baskets
  • Slope protection material
  • Embankment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration