No need for leveling after the removal of the plaroad! Restoration to the original state is easy!
Minimize damage to the ground of the leased land! Prevents troubles with landowners.
"Plaroad" does not require leveling after removal, making restoration easy. Unlike conventional methods, there is no worry about leaving gravel, different types of soil, or metal fittings behind, minimizing damage to the ground of the leased land and preventing disputes with landowners. Please feel free to contact us when you need our services. 【Features】 ■ Manual collection ■ Inspection conducted at the material center ■ Easy restoration after removal ■ No concern about leaving gravel, different types of soil, or metal fittings behind *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■ Construction related to transmission towers, agricultural policy projects, highways, bridge construction, material storage areas ■ Temporary installation of parking lots, underground pits at construction sites, leveling of foundations and beams ■ Staging areas and stages for various events *For more details, please refer to the PDF materials or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
A comprehensive construction consulting firm with high-level technical expertise. Our company specializes in the design of roads, bridges, rivers, tunnels, and water supply and sewage systems. We are an engineering company that provides consultation services. Our policy has remained unchanged since our establishment: to undertake work that requires high-level technical skills. Starting April 1, 2025, we will take over the Plaroad business from our affiliated company, Shindate Construction Co., Ltd., aiming for further contributions in the environmental field.