Construction method - メーカー・企業41社の製品一覧とランキング

更新日: 集計期間:Sep 10, 2025~Oct 07, 2025
※当サイトの各ページの閲覧回数を元に算出したランキングです。

Construction methodのメーカー・企業ランキング

更新日: 集計期間:Sep 10, 2025~Oct 07, 2025
※当サイトの各ページの閲覧回数を元に算出したランキングです。

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction methodの製品ランキング

更新日: 集計期間:Sep 10, 2025~Oct 07, 2025
※当サイトの各ページの閲覧回数を元に算出したランキングです。

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Stretchable Joint Repair Method "Ex Relife Method"

Construction methodの製品一覧

3571~3585 件を表示 / 全 4219 件

表示件数

Processing - Finishing Process Edition

Finishing processing is a method of machining to match the dimensional accuracy specified in design drawings, product specifications, and part specifications.

There are various types of processing. This time, I would like to explain finishing processes. For more details, please refer to the PDF download below. For anything related to blasting and painting, please leave it to us. Harada Ironworks Co., Ltd. TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Ironworks Hiroshima Official Link

  • Bridge Materials
  • Tunnel Materials
  • River construction

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Leave the blasting work in Hiroshima to Harada Ironworks!

Please feel free to consult us about sandblasting and grit blasting.

If you have requests for sandblasting or grit blasting in Hiroshima, please feel free to consult us. Blasting is a type of surface treatment process that involves colliding various particles with a material to remove the surface and create irregularities. Its effects are as follows: Surface cleaning: It removes oxidation films, rust, and dirt, achieving a clean surface. Improved adhesion: The increase in surface area due to the formation of irregularities creates an "anchor effect," enhancing adhesion with the paint. The durability of the paint is influenced by various factors such as the number of coats and the type of paint, but the impact of the grade of surface treatment can be as much as 50%. Surface preparation is the most important factor in painting. Harada Ironworks is a company with a proud history of 80 years in Hiroshima and possesses one of the largest blasting facilities in the Chugoku region. Please feel free to consult us about painting after blasting. We are here to help. Harada Ironworks Hiroshima Official Link

  • Rust Inhibitor
  • Special Construction Method
  • paint

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Harada Ironworks Hiroshima Official Website Completed

The homepage has been fully launched. We will update it regularly, so please take a look!!!

Our website, which conveys our technology to many customers, has finally been fully launched. We are sharing a wealth of information, including product information and technical details, etc. We will continue to update it daily, so please take a look. You can view it through the link below.

  • Rust Inhibitor
  • Special Construction Method
  • paint

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Impact on the durability of the coating / Preparation of the substrate is necessary.

Proper adjustment of the substrate is essential for maintaining the durability and lifespan of the paint.

The lifespan of metal coatings is generally considered to be around 10 to 30 years. The factors that influence this lifespan can be broadly categorized into the following four: Surface Preparation: Proper adjustment of the metal surface before painting is crucial. Cleaning and treating the surface improves the adhesion and durability of the coating. Number of Coats: It is also important to adhere to the appropriate number of coats. Ensuring sufficient coating thickness enhances the corrosion resistance of the metal. Type of Paint: The type of paint used significantly affects the lifespan. It is necessary to select appropriate paint that matches the metal's usage environment, considering factors like weather resistance and chemical resistance. Painting Techniques, Climate, and Surrounding Environment: The skills used in the painting process and the construction environment are also important factors. By employing appropriate painting techniques and considering climate conditions and the surrounding environment, the quality and lifespan of the coating can be improved. By properly managing these elements, the lifespan and corrosion resistance of metal coatings can be maximized. For more details, please refer to the PDF below. Harada Ironworks Hiroshima Official Link

  • Rust Inhibitor
  • Special Construction Method
  • paint

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Primer required, prevents peeling.

If you apply topcoat paint without a primer, it will peel off. Compared to products that have both primer and topcoat, those without primer have weaker adhesion to the substrate, making the paint film more prone to peeling.

When comparing products that only have a topcoat without a primer to standard painting products that include a primer, it was found that the products without a primer easily had their paint film peel off. Primer paint has the dual effect of preventing rust and strongly adhering to the substrate and base material, so it cannot be omitted. Although the primer is not visible, it plays an important role in maintaining corrosion resistance. Additionally, if the primer is not applied properly, the topcoat may be applied unevenly or show inconsistencies, resulting in an unattractive finish. Furthermore, the primer enhances the permeability of the paint, allowing the topcoat to adhere better, which can improve the durability and anti-corrosive properties of the paint film. In other words, the primer is a crucial step that significantly affects not only the appearance but also the performance and lifespan of the paint. Therefore, omitting the primer greatly increases the likelihood of having a paint job that peels easily or products that are prone to rust, making it essential to always apply an appropriate primer.

  • Rust Inhibitor
  • Special Construction Method
  • paint

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

The relationship between blasting and painting.

In painting, proper surface preparation (substrate treatment) is essential to achieve a good finish. The most effective method for surface preparation is blast treatment.

"Surface preparation" refers to the process of preparing the underlying material or substrate. Metals are melted, cooled, and solidified during the manufacturing process, but when exposed to high temperatures, they combine with oxygen in the atmosphere to form a film known as an oxide layer. If painting is done without removing this oxide layer and impurities, contaminants will mix between the paint and the substrate, leading to poor adhesion. Additionally, the functionality of the paint will not be realized due to the influence of impurities, preventing it from performing as intended. However, by using blasting to prepare the substrate, the surface oxide layer, rust, and other contaminants can be completely removed. Furthermore, by using angular abrasives, countless fine irregularities are created on the substrate, increasing the surface area for paint adhesion and preventing peeling. By cleaning and preparing the substrate with blasting before painting, the lifespan of the paint film can be extended two to three times, providing long-term economic benefits.

  • Rust Inhibitor
  • Special Construction Method
  • paint

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Drainage Pipe Lining Method "P.C.G FRP Supporter Method"

A method to create a new FRP pipe inside an existing pipe to solve issues such as leaks.

We offer the "P・C・G FRP Support Method" to solve various problems associated with aging pipes. We create new FRP pipes inside old pipes. Please feel free to contact us if you have any inquiries. 【Construction Achievements】 ■ Narita Airport Terminal 2 ■ Tsukuba Plant, Tsukishima Food Industry ■ Ogikubo Minami City House ■ Greenard Nagayama ■ Cracks Totsuka, etc. *For more details, please download the PDF or contact us.

  • Water and sewerage pipe fittings
  • Renovation and repair methods

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Pre-boring foundation stabilization method "NEW Super FK Method"

Supports a wide range of variations! Simple construction that meets the needs of the times.

The "NEW Super FK Method" is a pre-boring ground improvement method that integrates the foundation with the ground using segmental piles to develop bearing capacity. Since it involves straight excavation, the construction process is not complicated, which improves construction efficiency. Additionally, high blast furnace cement is used for the pile-fixing fluid and the ground improvement fluid, contributing to a circular economy through resource recycling. 【Features】 ■ By using an expansive admixture in the injection fluid, high frictional force is generated. ■ Pile sizes can accommodate from 300450 to 10001200. ■ Connection between intermediate and upper piles is possible for three types of pile diameters (shaft diameter, intermediate diameter, and segment diameter). *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

STJ Method for Expanding and Reinforcing Underground Excavation

Excavated soil is natural soil! A reliable method for constructing expanded bulb foundations through the middle excavation and reinforcement technique.

The "STJ Method" is a construction technique that involves high-pressure injection of cement milk from an STJ bit to create an enlarged bulb, integrating it with the ground to develop bearing capacity. By switching the auger's rotation to a low speed and jetting cement milk from two high-pressure injection nozzles while pulling it up at a constant speed, it is possible to reliably construct an enlarged bulb. Compared to the pre-boring method, it is a low-discharge method, and the discharged soil is natural soil, contributing to a circular economy. 【Features】 ■ Low noise and low vibration method ■ Reliable construction of enlarged bulbs ■ High bearing capacity ■ Rapid construction ■ Low construction costs *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Pre-boring expansion grouting method "Hyper-Straight Method"

Simple construction! Pre-boring enlarged foundation method using standard prefabricated concrete piles.

The "Hyper-Straight Method" is a pre-boring expansion solidification method where the ground is first excavated using an auger, followed by the injection of solidification liquid and pile surrounding fixation liquid, allowing the pile to be inserted into the designated support layer by self-sinking or rotation to a depth of 1D or more. Using a drilling and mixing device composed of an auger head, screw, mixing rod, and connecting rod, the construction is carried out through a sequence of steps from excavation to the injection of solidification liquid, repeated solidification of the solidified section, injection of pile surrounding fixation liquid, repeated fixation of the surrounding section, and installation of the pile. Additionally, by introducing a construction management system that supports high precision and efficiency, real-time management of the solidification bulb section and support layer is conducted to ensure quality. 【Features】 ■ Pile tip bearing capacity coefficient α=363 ■ Simple construction ■ Use of standard precast concrete piles ■ High bearing capacity at low cost ■ Construction management *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Pre-boring expansion grouting method "High Beam Method"

Proposal for "High Support Capacity Pile Design" with consideration for the environment! Introduction of the Pre-Boring Expansion Foundation Method.

The "High Bearing Capacity Pile Method (H・B・M)" enables the reduction of pile diameter and the number of piles used through high bearing capacity pile design, achieving a shortened construction period for foundation work and a reduction in excavated soil. By adopting HB piles with enlarged diameters, it obtains the specified values of the astonishingly high bearing capacity coefficients α, β, and γ (as per the Ministry of Land, Infrastructure, Transport and Tourism Notification No. 1113). To match the large ground bearing capacity, ultra-high-strength concrete piles with a strength of over 105 N/mm² have been developed, and a group of manufacturing factories affiliated with the association provides high-quality products. 【Features】 ■ Ensures ultimate α, β, and γ values ■ Constructs environmentally friendly foundations ■ High-quality construction covering all of Japan ■ Concrete pile materials entering a new era ■ 8 types of selection variations *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Connection plate - Non-welded joint with fitting method 'T·P JOINT'

Easy to handle! Connection plates with performance equivalent to welded joints and a fitting method without welding joints.

The "T・P JOINT (Triple Plate Joint)" is a non-welded joint that is less affected by weather conditions (such as wind, rain, and temperature) and allows for stable construction. The tightening of the connection bolts is done using a torque wrench, requiring no special tools or skilled workers, making construction management easy. Additionally, the protrusion of the connection plate from the pile body is small, which minimizes the impact on the frictional force around the pile surface. 【Features】 ■ Equivalent performance to welded joints ■ Less affected by weather conditions, allowing for stable construction ■ Safe construction even in areas where open flames are prohibited ■ Shorter construction time compared to welded joints ■ Easy to handle *For more details, please refer to the PDF materials or feel free to contact us.

  • Fittings

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Connection plate, non-welded joint method "T・PJOINT"

Tighten the connection bottle using a torque wrench! Reliable, robust, and convenient triple plate joint.

The "T・PJOINT" is a connection plate and joint method that consists of end parts, side plates, reinforcement bands, connection plates, and connection bolts, and is a non-welded joint. The connection plate has a concave shape that fits with the protrusions of the end plate, and by attaching the connection bolts to the screw holes of the side plates, the concave and convex parts are engaged, transmitting the stress acting on the joint through this engagement. Additionally, the connection bolts serve to prevent the connection plate from detaching when tensile forces act on the joint. 【Features】 ■ Has performance equivalent to welded joints ■ Less affected by weather conditions (wind, rain, temperature, etc.), allowing for stable construction ■ Can be safely constructed even in areas where open flames are prohibited ■ Shorter construction time compared to welded joints ■ The connection plate is divided into three parts for weight reduction, making it easy to handle *For more details, please refer to the PDF materials or feel free to contact us.

  • Expansion joint hardware

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Significant Cost Reduction: Recycling Soil on Construction Sites with the 'Litera Method'

High-quality improved soil without mixing unevenness! A construction method adopted for improvement work in narrow construction yards!

The "Litera Method" is a construction technique that uses a self-propelled soil improvement machine called "Litera" to mix soil and solidifying agents on construction sites. It can be implemented in narrow yards and has high improvement efficiency, significantly reducing the drop of untreated areas. Due to the low dust generation, it can be carried out in residential areas and alongside roads. Examples of this method's application include "safety measures for skin drop at tunnel portal heads" and "dust control" among other construction cases. 【Features】 ■ Prevention of environmental destruction and resolution of secondary pollution ■ Significant cost reduction made possible by on-site processing ■ High-quality assurance due to the use of high-performance soil improvement machines ■ Feasible construction in narrow yards ■ High improvement efficiency greatly reduces the drop of untreated areas ■ Low dust generation allows for construction in residential areas and alongside roads *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録