Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Stretchable Joint Repair Method "Ex Relife Method"

Construction method Product List

3586~3600 item / All 4219 items

Displayed results

Shortening construction periods and reducing costs: TNF method

"Shallow improvement" that supports the entire ground surface of the building without using piles.

The "TNF Method" is a low-cost special foundation construction method that integrates the slab and building foundation with improved ground using solidifying materials, supporting the building across the entire improved ground surface without the use of piles. By dispersing soil stress in multiple directions, it suppresses one-directional extrusion of the soil. It allows for construction while protecting historical heritage and other underground assets. Additionally, it significantly reduces the use of materials such as rebar, concrete, and formwork. 【Features】 ■ Suppresses differential settlement ■ No uplift steps that occur in pile-supported buildings ■ The improved ground shields against surface outflow of soil and mitigates liquefaction directly beneath the building ■ Minimal impact on underground natural environments such as groundwater ■ Protects underground buried objects ■ Reduces CO2 emissions *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TNF-D Method

Contributing to the overall shortening of the construction period! Compared to typical foundation shapes, the ground improvement reduces the contact pressure.

The "TNF-D method" disperses the stress under the foundation by shaping the foundation into a trapezoidal form. It reduces stress on the underlying ground and supports the foundation with a strong TNF improved ground. By minimizing the foundation volume, it can reduce the amount of concrete, excavation, and rebar used. Additionally, it contributes to reducing environmental impact through labor-saving construction. 【Features】 ■ Reduction of foundation structure costs ■ Shortening of foundation structure construction time ■ Resolution of labor shortages ■ Reduction of environmental impact *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Features of the TNF method (1)

Introducing the features of our TNF method, which has reduced costs by approximately 30% compared to traditional pile foundations!

We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. In soft ground across the country, we perform ground improvement to create an artificial bedrock suitable for the building. Compared to conventional methods (pile foundations), we can achieve approximately 30% cost reduction (for a total floor area of 1,000 m² and pile length of 30 m). Please feel free to contact us when you need our services. 【Features】 - Compared to conventional methods, there is no need for pile work, formwork work, or ground preparation work, resulting in a 50% reduction in construction time (for a total floor area of 1,000 m² and pile length of 30 m). - Since no piles are used, the demolition costs during building dismantling are also reduced. *For more details, please refer to the related links or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Features of the TNF method (3)

No use of stakes! Introducing the features of the TNF method, which can also reduce demolition costs during building demolition!

We would like to introduce the features of the "TNF Method," implemented by Yoshimitsu Corporation, which has over 1,300 achievements nationwide. We carry out ground improvement to create an artificial bedrock suitable for buildings on weak ground across the country. Since we do not use piles, the demolition costs during building dismantling are also reduced. Please feel free to contact us when needed. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1,000 m² and pile length of 30 m) ■ Construction period shortened by 50% compared to conventional methods, as pile work, formwork work, and ground preparation work are not required (for a total floor area of 1,000 m² and pile length of 30 m) *For more details, please refer to the related links or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Measures for Soil Embankment Regulation] Approximately 20% of construction-generated soil is recycled! Literar Method

If you want to reduce the amount of leftover soil disposal, this is a must-see! We recycle construction-generated soil on-site, significantly reducing disposal costs and new purchase costs [Embankment Regulation Law enacted].

Are you facing any of these issues with construction-generated soil? - I want to reduce the amount of leftover soil… - Disposal costs are high… - It's difficult to find a disposal site that will accept it… ⇒ The self-propelled soil improvement machine 'Liter Method' solves these problems! Since it is self-propelled, it recycles the soil discharged from the construction site on-site using cement and lime. This results in cost savings compared to disposing of the soil. Additionally, it can be operated in narrow yards, and due to its high improvement efficiency, the amount of untreated areas significantly decreases. With less dust, it can be operated in residential areas and alongside roads. ■ What is the Embankment Regulation Law? From the perspective of protecting the lives and bodies of citizens from disasters caused by embankments, this law comprehensively regulates dangerous embankments nationwide, regardless of the land use or purpose of the embankment. ~ Background ~ In 2021, a large-scale landslide disaster occurred in Atami City, Shizuoka Prefecture, due to heavy rain causing embankments to collapse. There are also areas where regulations regarding dangerous embankments are not necessarily sufficient. Therefore, it has been decided to comprehensively regulate dangerous embankments regardless of land use. *For more details, please download the materials or contact us via our website.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Disaster Measures] A must-see for those who want to reduce the amount of leftover soil! Liter Method

Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】

Are you facing any of these issues with construction-generated soil? - Want to reduce the amount of leftover soil disposal? - Disposal costs are high? - It's difficult to find a disposal site that will accept it? ⇒ The self-propelled soil improvement machine 'Litera Method' can solve these problems! Since it is self-propelled, it recycles the soil discharged from the construction site on-site using cement or lime. This results in cost reduction compared to disposing of the soil. Furthermore, it can be operated in narrow yards, and due to its high improvement efficiency, the amount of untreated soil falling off is greatly reduced. With less dust, it can be operated in residential areas and alongside roads. 【Features】 ■ Prevention of environmental destruction and elimination of secondary pollution ■ Significant cost reduction made possible by on-site processing ■ High-quality assurance due to high-performance soil improvement machinery ■ Can be operated in narrow yards ■ High improvement efficiency greatly reduces the amount of untreated soil falling off ■ With less dust, it can be operated in residential areas and alongside roads *For more details, please download the materials or contact us through our website.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Buried tank

It is made of polyethylene with excellent pressure resistance, molded as a seamless, integrated unit for use as a water reservoir or sewage tank!

Suiko offers "buried tanks." Our product is made of polyethylene with seamless, one-piece molding that provides excellent pressure resistance. It uses materials that are easy to recycle and environmentally friendly. Additionally, by connecting multiple tanks, large capacities can be secured. Please use it for rainwater, snowmelt, drainage tanks, as well as for reserve water and wastewater tanks. 【Features】 ■ Environmentally friendly material that is easy to recycle ■ Large capacities can be secured by connecting multiple tanks *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Open shield method

A construction method that utilizes the advantages of both the open-cut method and the shield method!

The open shield method is a new open shield technique that has been improved to adapt the advantages of both the cut-and-cover method and the shield method for urban areas, agricultural drainage channels, and soft ground. It is the most suitable method for constructing underground structures such as box culverts in locations where excavation is possible but soil retention using sheet piles or similar methods is difficult.

  • Reinforced concrete construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Case】Accessory Work Well Point

A method used when it is expected that drainage by well pumps alone will be difficult!

The "Well Point Method" involves attaching well points to the ends of pipes, injecting jet water, and driving numerous pipes into the ground around the excavation site. This method uses vacuum power to draw groundwater from the installed pipes, thereby lowering the groundwater level. It is a type of well method used when it is anticipated that drainage by well pumps alone will be difficult. It is widely used for underground pipe installation work, septic tank burial work, ground liquefaction countermeasures, and improvement methods for weak ground. This is a ground improvement work used when conducting excavation work in areas with spring water. 【Features】 - Used when it is anticipated that drainage by well pumps alone will be difficult. - Widely used as an improvement method for underground pipe installation work and septic tank burial work. - Used when conducting excavation work in areas with spring water. *For more details, please refer to the related link page or feel free to contact us.

  • Ground improvement
  • Drainage and water removal
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Ancillary Work Percussion

For excavating unstable sand layers and gravel layers! It demonstrates its power in places where wall construction has been difficult until now.

"Percussion" is a construction method that involves suspending a heavy drilling bit (one bit) from the end of a wire rope and moving the rope up and down to break through geological layers while drilling. It demonstrates its effectiveness in ground conditions that contain many boulders and cobbles, in harsh environments such as rivers, and in narrow spaces where wall construction has previously been difficult. It is suitable for drilling relatively soft geological layers. [Features] - Demonstrates effectiveness in places where wall construction has previously been difficult - Suitable for drilling relatively soft geological layers - Excels in drilling unstable sand layers and boulder layers that are challenging for other methods *For more details, please refer to the related link page or feel free to contact us.

  • Ground improvement
  • Ground foundation construction method
  • Drilling Machine

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polyurea resin spray application method

A resin coating that is highly suitable for the site, with excellent quick-drying, durability, and waterproof properties.

Our company is a certified construction agent for Rhino Japan Co., Ltd. in the Hokuriku and Koshinetsu areas. We have received training as construction supervisors for the "Polyurea Resin Spray Method" and our trained personnel carry out the construction. Polyurea resin is an advanced coating material derived from polyurethane, characterized by its quick-drying properties, curing in about 5 seconds, and demonstrating impact absorption performance. The standard film thickness is approximately 2mm, allowing for immediate use after construction is completed, significantly reducing the construction period compared to conventional methods. 【Features】 ■ Ultra-fast drying with a curing time of as little as 3 seconds and complete curing in 24 hours, enabling rapid service resumption. ■ Proven wear resistance with values ten times better than good results in the Taber abrasion test. ■ Thin film thickness, typically between 1mm and 3mm, forming a robust coating layer. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rockfall prevention work "DK Bond Method"

Expanding nationwide across all 47 prefectures with reliable quality and technical expertise! Rockfall prevention works that consider landscape preservation and the environment.

The "DK Bond Method" is a slope construction technique implemented directly on the source of falling rocks, aiming to suppress the fall of floating stones and boulders. This method involves stabilizing unstable rocks by using an adhesive (DK Bond Mortar) to bond them to stable bedrock, thereby integrating and stabilizing them. In addition to integrating unstable rock masses with the ground, it also has the effect of preventing weathering and erosion, which are causes of rock falls. 【Features】 ■ Does not compromise the landscape ■ Can be applied in areas where large machinery cannot access ■ Not affected by the size or shape of the target rock masses ■ Expected adhesive strength can be achieved within 7 days ■ Can be used in conjunction with other construction methods *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Magnetic High-Pressure Water Stop "DP-SW Method"

Revolutionary method for deck slab water leakage! With pinpoint waterproofing, leakage can be stopped in as little as one day.

The "DP-SW Method" is a groundbreaking technique that allows for water stoppage in deck slabs, which were previously considered impossible to seal. It utilizes a combination of ultra-strong neodymium magnets and high-pressure injection plugs, approaching the water leakage from the outlet. Water leakage that reaches the deck plate through cracks in the concrete of the deck plate floor is not only difficult to identify the leakage path but can also cause the deck plate to shift sideways, leak from various points, spread rust, and cause the concrete to swell, leading to further leakage. In large commercial facilities and buildings, extensive investigations and construction can be challenging due to structural constraints. Our company addresses issues related to water leakage, especially when full waterproofing is not feasible due to time and cost constraints. 【Features】 ■ Uses GSC's uniquely developed magnetic high-pressure plugs ■ Fixed in place using magnets at leakage points such as ceilings for work ■ Minimizes the construction area by approaching from the leakage outlet ■ No need for extensive investigations; partial water stoppage work reduces construction time and costs ■ Reduces stress on the building compared to conventional methods, extending the building's lifespan *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • Waterproofing work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof Stainless Steel Waterproofing Method 'R-T Method'

A waterproof construction method that boasts excellent overall performance and reliability.

The "R-T Method" is a stainless steel waterproofing technique that was introduced from the Swedish company Rostfri a-Tak in 1980 and has since evolved uniquely in our company. Today, while maintaining its reliable water tightness, it has been adopted in many representative buildings in our country as an element that composes aesthetically rich roofs. By continuously welding sheets of stainless steel, which have excellent weather resistance, through seam welding, we can ensure reliable water tightness. If long-term weather resistance is required, the option of using titanium sheets is also available. 【Features】 ■ Complete water tightness through welding ■ Long-term maintenance-free ■ Achieves aesthetically rich roofs ■ Constrained method (our unique method) ■ Energy-saving through external insulation construction, etc. ■ Compatible with wooden substrates ■ Installation of solar panels and rooftop greening is possible with dedicated fittings *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof sheet waterproofing method "High Tough EG"

Contributing to energy savings with a lightweight external insulation sheet waterproof system.

"High Tuff EG" is a comprehensive system that includes total design from the base deck plate, insulation board, High Tuff EG sheet, to accessories (High Tuff Metal), all constructed by our qualified professionals with responsibility. The High Tuff EG sheet uses a waterproof sheet made of ethylene propylene rubber as the main material, laminated with a strong polyester mesh, excelling in "weather resistance, impact resistance, and wind pressure resistance," while also considering the global environment. Additionally, by employing a mechanical fastening method that secures the sheet and insulation board with dedicated fasteners, and a hot air fusion method that integrates the overlapping parts of the sheet with hot air, we have eliminated issues such as bubbling and peeling of the waterproof sheet, which are drawbacks of conventional roofing waterproofing methods. With the installation of the High Tuff EG Solar Frame (related product), it becomes possible to install solar panels on the sheet waterproof roof (High Tuff EG). [Features] ■ A comprehensive system from deck to waterproofing (responsible construction by our company) ■ High weather resistance, high impact resistance, high wind pressure resistance, high water tightness ■ Energy-saving effects ■ Lightweight roofing ■ Mechanical fastening method, etc. *For more details, please download the PDF or feel free to contact us.

  • Waterproofing work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration