Construction method Product List and Ranking from 41 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. 太洋基礎工業 Aichi//General contractors and subcontractors
  3. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  4. 4 菱建基礎 本社 Tokyo//General contractors and subcontractors
  5. 5 三晃金属工業 Tokyo//General contractors and subcontractors

Construction method Product ranking

Last Updated: Aggregation Period:Sep 10, 2025~Oct 07, 2025
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  3. All casing is entrusted to Ryo Construction Foundation! "All Casing Method" 菱建基礎 本社
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Stretchable Joint Repair Method "Ex Relife Method"

Construction method Product List

3256~3270 item / All 4202 items

Displayed results

Sinking Correction Method: Steel Pipe Pile Driving Method

The tip of the steel pipe pile is driven into the supporting layer! It is suitable when there is a layer of weak ground more than 1.5m under the building.

The "Steel Pipe Pile Driving Method" is a settlement correction method used when there is a layer of weak ground beneath a building that is more than 1.5 meters deep. The tip of the steel pipe pile is driven into the supporting layer. By correcting the building to a stable foundation, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ 10-year warranty ■ Suitable when there is a layer of weak ground beneath the building that is more than 1.5 meters deep ■ The tip of the steel pipe pile is driven into the supporting layer ■ Reduces earthquake damage by correcting the building to a stable foundation ■ Restores a comfortable and safe living environment by jacking up and leveling the building's tilt *For more details, please refer to the PDF document or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sinking Correction Method: Load-Bearing Slab Method

Create improved ground from the support layer to take reaction forces! Suitable when the layer of weak ground under the building is less than 1.5m.

The "Pressure-resistant slab method" is a settlement correction method used when there is a layer of weak ground less than 1.5 meters beneath a building. It creates improved ground from the supporting layer to take reaction force. By correcting the building to a solid ground, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable when there is a layer of weak ground less than 1.5 meters beneath the building ■ Creates improved ground from the supporting layer to take reaction force ■ Reduces earthquake damage by correcting the building to a solid ground ■ Jacks up the building to level it and restores a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction method: foundation raising method

Jack up only the building above the foundation using the base as a reaction force! This is an introduction to the sinking correction method.

The "Foundation Lifting Method" is a sinking correction method used when the settlement of a building has stabilized. It involves jacking up only the building above the foundation, using the foundation as a reaction force. This method corrects the tilt of the building by jacking it up to restore it to a level position, allowing for a comfortable and safe living environment. 【Features】 ■ Suitable for cases where the building's settlement has stabilized ■ Jacks up only the building above the foundation, using the foundation as a reaction force ■ Corrects the tilt of the building by jacking it up to restore a level position, allowing for a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation Reinforcement Method: Stubborn Old Man

Seven strong layers protect the foundation of your home! Even unreinforced foundations can be strengthened to 2 to 4 times their conventional strength.

If you leave cracks and fissures in the foundation unattended, the foundation will not be able to bear the load of the building during an earthquake. "Ganko Oyaji" is a subsidence correction method that achieves high-strength reinforcement exceeding that of new construction with seven robust layers, including carbon fiber. It can reinforce even unreinforced foundations to 2 to 4 times stronger than conventional methods. It possesses features such as high strength, high durability, shear strength, improved toughness, short construction periods, and low cost. 【Features】 ■ High strength, high durability, shear strength, improved toughness, short construction periods, low cost ■ Can reinforce even unreinforced foundations to 2 to 4 times stronger than conventional methods ■ Results of full-scale strength performance tests - Achieves 10 times the strength of steel plates and 1.5 times the strength of aramid fibers ■ Seven robust layers protect the foundation of your home *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Small curved mirror option - dedicated mounting hardware for pole SK-30

Easy installation of garage mirrors.

The garage mirror option SK-30 is a mounting bracket specifically designed for poles with a diameter of 25 to 60mm. It has a wide effective range (25 to 60mm) and can be securely installed with just one wrench (for 13mm). 【Features】 - Can be mounted on poles ranging from 25mm to 60mm *For more details, please download the PDF or feel free to contact us.

  • Car and bicycle parking facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Advancement Construction Method"

We will respond with various methods suitable for different situations and ground conditions with a diverse range of variations.

Our company conducts various "advancement methods," including the Cobra method and pipe return method. In particular, regarding advancement construction, we have made various efforts and continuous pursuits, accumulating a track record of achievements. Please feel free to contact us if you have any requests. 【Lineup】 ■ Cobra Method ■ Pipe Return ■ Uncle Mall ■ Envi Liner *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe return method

Wide compatibility with construction conditions, soil types, and underground obstacles! Can be connected to existing pipes and existing manholes, etc.

This technology is a method that can extensively accommodate construction that is impossible with conventional methods, such as bit replacement during excavation in response to changes in soil conditions and direct connection to existing pipes. Bits, steel pipes, and excavation methods suitable for the soil type can be selected. Ground improvement can be performed from within the leading body. Additionally, the advancement of electronic devices has enabled a high-precision surveying management system. Direction correction and accuracy management can be performed in real-time. 【Features】 - The thrust pipe remains in place while the excavator can retract and be reinserted after shrinking. - No restrictions on the launch base or access shaft in small spaces. - A wide variety of excavation and soil removal methods can be selected. - All-direction excavation is possible. - Long-distance excavation of up to 300 meters is achievable. *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Envi-liner method

The construction extension has reached a total of 4,930 km, boasting a high track record with the same type of advancement method.

This technology is a non-excavation small-diameter pipe jacking method that can construct various types of pipes ranging from φ150 to φ1000. Using a jacking machine installed in the launch shaft, the buried pipes are sequentially laid towards the receiving shaft, eliminating the need to excavate the road surface. Additionally, the jacking device is designed to be compact, allowing for launching from small shafts. Since it uses an excavation and soil removal method, there is no need for large surface facilities like those required for slurry methods, and the equipment associated with the work, such as cranes and generators, can be kept small, contributing to overall cost reduction. 【Features】 ■ Capable of constructing various types of pipes from φ150 to φ1000 ■ Non-excavation construction ■ Suitable for difficult ground conditions ■ Small space and low cost ■ No need to excavate the road surface *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ace Mall Method

Clearing a wide range of soil conditions! Introducing pipe jacking technology that takes the Earth's environment into consideration.

This technology employs a mud pressure-type excavation and discharge mechanism along with a unique position measurement system, achieving high-precision long-distance and curved advancement across a wide range of soil conditions from soft ground to bedrock. Additives are injected into the excavated soil, turning it into a slurry that is pumped up to the standing piles. By controlling the amount of mud taken in, some is left in the ground to prevent the collapse of the face and pit walls, while the lubricating effect of the mud (slurry) reduces the driving force. 【Features】 ■ Clears a wide range of soil conditions ■ Achieves long-distance and curved advancement *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ramsas method

The soil removal method is vacuum suction! A diverse lineup of cutter heads tailored to the soil type.

The technology creates a method that forms a mud film on all excavation surfaces and constructs a highly stable tail void through approximately 25mm of overcut and the action of high-concentration mud water. The gravel is crushed within the chamber using a cone crusher and cutters driven by the outer circumference. Bit replacement can be done from inside the machine, allowing for long-distance advancement. 【Features】 ■ A diverse lineup of cutter heads tailored to soil types (φ700 to 3,000) ■ The excavation method uses vacuum suction ■ Crushing capacity is 1-axis compressive strength of 350MN/m² (RMS-GX type) ■ Bit replacement can be done from inside the machine, enabling long-distance advancement ■ The action of approximately 25mm of overcut and high-concentration mud water forms a mud film on all excavation surfaces and constructs a highly stable tail void *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ramsas-S Method

The advanced curve construction is possible with the internal measurement system! The launch and arrival shafts are very small.

The technology is a construction method that allows for long-distance propulsion using a vacuum excavation method. For diameters of φ250 to 500, it can be divided into four parts (maximum dimension 925mm), and for φ600, it can be divided into three parts (maximum 1,325mm). Each nominal diameter is equipped with a compact jack for improved workability. Additionally, it allows for the construction of shafts in favorable locations, taking into account the surrounding environment. 【Features】 ■ A diverse lineup of cutter heads tailored to soil types (φ250 to 600) ■ Very small launch and arrival shafts ■ Capable of long-distance launches ■ Advanced curved construction possible with an in-pipe measurement system ■ Advanced curved construction possible with an electromagnetic wave measurement system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ito Group Co., Ltd. Business Introduction

Leave the specialized civil engineering work such as slope stabilization and landslide countermeasures to us.

Our company is dedicated to cultivating technology and human resources solely in specialized civil engineering works such as slope stabilization and landslide countermeasures, as well as slope protection construction. We handle techniques like the slope protection method "Wood Slope Method" and the environmentally friendly road widening method "Cantilever Method," so please feel free to consult us if you have any requests. 【Business Items】 ■ Slope stabilization and landslide countermeasures ■ Slope protection construction ■ Rockfall countermeasures ■ Road widening construction ■ Environmental conservation promotion construction, etc. *For more details, please download the PDF or feel free to contact us.

  • Road construction
  • Other civil engineering works
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plug Method for Small Tube Stopper

For the maintenance of the heater and condenser's small tubes! It is possible to investigate leaks in fine holes.

At Yamaguchi Machinery Co., Ltd., we offer the "Small Pipe Stopper Plug Method," which is recommended for companies that regularly conduct maintenance. This method does not affect the area around small holes, preventing cracks in small pipes and tube plates. By maintaining small holes while leaks are still minor, it helps avoid sudden troubles and leads to cost savings. 【Features】 ■ The durability of small holes after construction is permanent ■ Construction time is significantly shorter ■ There is no impact on the area around small holes *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry Ice Blasting Method

A cleaning technology that does not damage the base material and leaves no cleaning media or wastewater behind!

We offer "Dry Ice Blasting," which does not damage the base material and leaves no cleaning media or wastewater behind. Dry ice particles (dry ice pellets) with a diameter of 3mm are propelled by compressed air to remove contaminants. This method utilizes the physical properties of dry ice, providing high cleaning power. It is a very common technique in EU countries. 【Features】 ■ No water or detergents used ■ No damage ■ No residual media left behind ■ Excellent cleaning power ■ No secondary processing costs *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing and corrosion prevention method "Airtight"

Introducing composite and multifunctional construction methods! For deterioration prevention, longevity, leakage prevention, waterproofing, and corrosion protection.

"Air Tight" is a composite design waterproofing and anti-corrosion method that combines adhesion, waterproofing, and corrosion resistance in FRP lining. It is a multifunctional type that demonstrates the required performance under various environmental conditions. It is not affected by the alkaline properties of concrete. Additionally, the coating of concrete requires crack-following ability, and this method enhances crack-following ability through high strength and flexibility. 【Features】 ■ Suppresses the occurrence of pinholes ■ Long-term durability ■ A surface degradation type that can be assessed visually for peace of mind ■ Ease of maintenance management ■ Capable of reducing life cycle costs *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration