Construction method Product List and Ranking from 1598 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 エスケー化研 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 22, 2025~Nov 18, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Gradient Construction Method for Residential Exterior Walls "KF Gradient Method" KFケミカル
  5. 5 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック

Construction method Product List

4201~4215 item / All 4238 items

Displayed results

Piping Work "Continuous Water Freezing Method (Building)" [Daiyuu News] August 2020 Issue

Yokohama City Waterworks Bureau Distribution Division! A freeze construction method briefing was held at Nakamura Water Plaza.

We would like to introduce the "Daiyū Newspaper August 2020" published by Daiyū Freeze. This document includes approximately 50 participants from the Northern and Southern Water Supply Management Division, examples of questions and answers from the day, and information about the freezing of fire hydrants and site visits in Maebashi City. Please feel free to contact us if you have any inquiries. [Contents] ■ Approximately 50 participants from the Northern and Southern Water Supply Management Division ■ Example of questions and answers from the day ■ Freezing of fire hydrants and site visits in Maebashi City ■ The birth of a groundbreaking defrosting method that does not use fire, DOWT *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work "Continuous Water Freezing Method (Building)" [Daiyū News] April 2015 Issue

"Frozen construction method" expands overseas! Leave large-diameter simultaneous freezing to our company, which has a wealth of experience.

We would like to introduce "Daiyuu Newspaper April 2015" published by Daiyuu Freeze. This document includes information about the successful commencement of construction in Shanghai, China, employee introductions, and simultaneous freezing at 14 locations using SGP200A. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Successful construction in Shanghai, China ■ Employee introductions ■ Simultaneous freezing at 14 locations using SGP200A *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyū News] June 2016 Issue

I won the "Entrepreneur Excellence Award" at the Kawasaki Entrepreneur Audition!

We would like to introduce the "Daiyuu Newspaper June 2016" published by Daiyuu Freeze. This document covers the initiation of device development aimed at reducing freezing time, employee introductions, and the acquisition of ISO 9001 certification for the quality management system. We accept construction requests from all over the country. We are also available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Initiation of device development for reducing freezing time ■ Employee introductions ■ Acquisition of ISO 9001 certification for the quality management system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" [Daiyū News] March 2017 Issue

From now on, we will also consider large-diameter freezing construction in Toyonaka City! Please contact us if you need our services.

We would like to introduce the "Daiyuu Newspaper March 2017" published by Daiyuu Freeze. This document includes information about the simultaneous construction of two locations with a diameter of 300mm at the Nobatake Water Supply Station in Toyonaka City, as well as employee introductions and details about obtaining ISO 9001 certification for our quality management system. We accept construction requests from all over the country. We are available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Simultaneous construction of two locations with a diameter of 300mm at the Nobatake Water Supply Station in Toyonaka City ■ Employee introductions ■ Obtaining ISO 9001 certification for our quality management system *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Continuous Water Freezing Method (Building)" Daiyū News May 2017 Issue Private Sector

Daiyuu Freeze utilized its extensive experience to carry out freezing work at Shinjuku Mitsui Building 450A!

We would like to introduce the "Daiyuu Newspaper May 2017 (Private)" published by Daiyuu Freeze. This document includes high praise for the safety and quality improvements from the Renewal Division of Shin Nippon Air Conditioning Co., Ltd., as well as information about the continuous water freezing method being featured in "Science Advances." We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ High praise for safety and quality improvements from the Renewal Division of Shin Nippon Air Conditioning Co., Ltd. ■ Employee introduction ■ Continuous water freezing method featured in "Science Advances" *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Constant Water Freezing Method (Building)" [Daiyuu News] July 2017 Issue

Support available on holidays and at night! Successful freezing experiment on HPPE pipes at Daiyu Freeze Facility in Kawaguchi City.

We would like to introduce the "Daiyū Newspaper July 2017" published by Daiyū Freeze. This document includes information about many members of the Polyethylene Pipe System Association for Water Distribution who observed freezing experiments, as well as employee introductions. We accept construction requests from all over the country. We are also available on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Many members of the Polyethylene Pipe System Association for Water Distribution observed freezing experiments ■ Employee introductions *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sinking Correction Method: Load-Bearing Slab Method

Create improved ground from the support layer to take reaction forces! Suitable when the layer of weak ground under the building is less than 1.5m.

The "Pressure-resistant slab method" is a settlement correction method used when there is a layer of weak ground less than 1.5 meters beneath a building. It creates improved ground from the supporting layer to take reaction force. By correcting the building to a solid ground, it is possible to reduce earthquake damage. The building's tilt is jacked up and leveled, restoring a comfortable and safe living environment. 【Features】 ■ Suitable when there is a layer of weak ground less than 1.5 meters beneath the building ■ Creates improved ground from the supporting layer to take reaction force ■ Reduces earthquake damage by correcting the building to a solid ground ■ Jacks up the building to level it and restores a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Settlement correction method: foundation raising method

Jack up only the building above the foundation using the base as a reaction force! This is an introduction to the sinking correction method.

The "Foundation Lifting Method" is a sinking correction method used when the settlement of a building has stabilized. It involves jacking up only the building above the foundation, using the foundation as a reaction force. This method corrects the tilt of the building by jacking it up to restore it to a level position, allowing for a comfortable and safe living environment. 【Features】 ■ Suitable for cases where the building's settlement has stabilized ■ Jacks up only the building above the foundation, using the foundation as a reaction force ■ Corrects the tilt of the building by jacking it up to restore a level position, allowing for a comfortable and safe living environment *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground improvement
  • Residential foundations
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A must-see! Comprehensive equipment and tools for asbestos removal work in commercial buildings.

All materials for floor removal, wall sanding, and scraping will be ready.

In asbestos removal work that occurs during the demolition of commercial buildings and factory structures, various equipment and grinding tools are required. Our company has quickly proposed floor polishing machines to asbestos removal specialists, and they are currently being utilized. At the same time, we also provide various scraper replacement blades for wall sanding tools and hammer scraping for wet asbestos hidden in ceiling areas. We can respond to any region within the country, so please feel free to consult with us first. ★ For inquiries regarding our products, please contact us through our company website. Inquiries through this site cannot be used. Website: https://www.ebisu-tool.org

  • Dismantling and moving
  • Dismantling equipment and parts
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

「CFS工法」で建築した多機能型障がい者施設!※施工動画あり

鉄骨・RC工法と比べ工期が短く低価格なスチール建材!パネル製造は自社で行うため、高精度で低コストを実現!

新工法「CFS工法」は、耐久性・耐震性の高い2×4スチールハウスです。 2×4スチールハウスは亜鉛めっき鋼板を使用しており高い耐久性を実現! 木造パネルの1.5倍の強度がありながら、RC・重量鉄骨よりもローコストで、品質と価格のバランスが優れています。 RC・鉄骨造の費用減や工期短縮、木材の代替としてCFS工法を導入したい等様々なご要望にお応え致します。 CFS工法導入についてご不明点、御見積等ご要望がございましたら、是非一度一度お問合せ下さい。 ※カタログはPDFをダウンロードして頂くか、お問い合わせください。

  • Wood panel and frame wall construction
  • Structural Materials
  • Systems Architecture

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete anti-corrosion method "Vandex WS System"

Concrete anti-corrosion method with excellent workability, water resistance, and chemical resistance.

The "Vandex WS System" excels in the durability and protection of concrete, possesses high safety standards, and is a concrete anti-corrosion method suitable for drinking water and other potable water applications, compliant with the Japan Water Works Association standard JWWA K 143 for "solvent-free epoxy resin coatings for the inner surfaces of concrete water tanks." Since it is a solvent-free epoxy resin coating, it does not contain solvents, eliminating the risk of solvent poisoning, and there is almost no shrinkage after curing. 【Features】 ■ Complies with Japan Water Works Association standard K 143 ■ Safe to handle ■ Excellent filling properties for pinholes in concrete substrates and workability with trowels ■ Superior mechanical strength after curing ■ Excellent water resistance and chemical resistance after curing *For more details, please download the PDF or feel free to contact us.

  • Anti-rot, anti-termite, anti-mold material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduce the risk of fuel oil leakage (environmental pollution)! Underground buried resin double-shell piping.

Double the piping to dramatically reduce the risk of fuel oil leakage (environmental pollution)! Capable of pinpoint detection of fuel oil leaks from within!

The "Leak Detection Device Equipped Underground Buried Resin Double-Shell Piping" features a structure that incorporates sensors in the gap between the inner oil transport (main) pipe and the outer shell pipe of the double-shell piping. Patent: No. 4421711, Utility Model: No. 3183085, Patent Application: 2014-235598, Patent Application: 2015-115624 - Double Piping Structure Utility Model: No. 3195379, Patent Application: 2014-176033, Utility Model Application: 2014-005777 - Piping Structure [Features] ■ Pinpoint detection of leaks from external water and internal fuel oil ■ Doubling the piping significantly reduces the risk of fuel oil leaks (environmental pollution) ■ Repairs can be made to the faulty areas before any harm occurs, among others *For more details, please download the PDF or contact us.

  • Piping materials (plastic pipes)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Integrated construction method for expansion devices and waterproofing of floor slabs - AOS method (NETIS)

[NETIS Registration Method] No need for processes such as anchor installation or rebar welding! A method that integrates expansion devices and floor waterproofing, reducing construction and curing time by 50%.

The "Integrated Method of Expansion Devices and Deck Waterproofing (ARCHIST ONEPIECE-GEL SYSTEM®)" achieves a reduction in construction time and high economic efficiency by using the same asphalt emulsion-based expansion material and waterproofing material, allowing for the installation of embedded expansion devices and membrane-type deck waterproofing. This method maintains both the expansion device function and waterproofing function in bridges. *For bridge surface waterproofing materials, both room temperature membrane-type waterproofing materials (ONEPIECE-GEL PROOF) and membrane-type deck waterproofing (asphalt heating type) can be used. 【Features】 ■ More than 15% reduction in construction costs compared to conventional methods ■ Easy to construct at room temperature, enabling a reduction in construction time ■ Passes performance verification tests for 15 years *For more details, please contact us or download the PDF to view.

  • Bridge Construction
  • Coating film waterproofing material/permeable waterproofing material
  • Bridge Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic retrofitting of large-diameter drainage pipe outlet using the "Magma Rock Method NGJ"

Non-excavation sewer pipelines (large diameter, φ800 to φ3000) seismic resistance technology. Cylindrical stainless steel and rubber sleeves designed to withstand Level 2 seismic motion.

The Magma Lock method, developed for the seismic reinforcement of pipe joint sections, demonstrates water-tight performance capable of withstanding disconnection due to level 2 seismic motion. This method involves pre-cutting grooves (joints) at the connection between the main pipe and the manhole, installing the Magma Lock, and concentrating seismic stress at this point to induce cracking in the joint. The shock absorption effect helps prevent damage to the connection. In areas where cracks occur along the joint, the pre-installed Magma Lock prevents the inflow of groundwater and soil into the pipe. Additionally, this seismic reinforcement method can be reliably installed even when the existing pipe is in a flowing state, as long as the water depth is 25% or less of the pipe diameter (maximum water level of 40 cm), targeting the connection between the manhole and the pipe. 【Applications】 ● Seismic reinforcement of the connection between manholes and pipes (circular pipes).

  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

KG Caisson Blade Soil Removal Device

A sediment removal system that promotes settlement by the jet flow of a submersible pump to remove soil from the lower part of the blade edge.

The "KG Caisson Cutter Sediment Removal Device" is a technology that removes sediment from the bottom of the cutter during the installation of open caissons using the jet flow from an underwater pump. With approximately ten times the water volume and significant jet force compared to conventional water jets, this device can also handle the installation in hard sandy soil layers. By attaching a 90° elbow to the underwater pump, downward jet discharge is achieved. Please feel free to contact us if you have any inquiries. 【Expected Effects】 ■ Improved removal efficiency with strong jet force, ensuring reliable removal of sediment beneath the cutter. ■ Remote operation of the device eliminates the need for divers to perform high-pressure work, reducing labor costs. ■ Downward jet projection breaks up sediment in the central part of the caisson, enhancing excavation efficiency. ■ After installation is complete, reliable removal of sediment adhering to the cutter improves integration with the bottom slab concrete, reducing leakage. *For more details, please download the PDF or feel free to contact us.

  • Piles, caissons, sheet piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration